Substantial Completion Checklist for Final Inspection

Substantial Completion Checklist for Final Inspection

<p> SUBSTANTIAL COMPLETION CHECKLIST & POST ACCEPTANCE REPORT PROJECT DATE : REPORT NO. 1 DAGS JOB NO.</p><p>INSPECTION ATTENDANCE NAME ASSOCIATION INITIAL DAGS - INSPECTION CONTRACTOR NAME</p><p>SUBSTANTIAL COMPLETION CHECKLIST – IGC SECTION 7.31.1 DATE PASSED VERIFIED Preliminary walk-through punch list is COMPLETED – </p><p>SECTION SECTION SECTION SECTION SECTION GRADING BLDG WALL HARDWARE -GEN AIR COND - SYST PANEL / BRKR LANDSCAPE BLDG FINISH WALL FNSH AIR COND - DIFF WALL PLUGS IRRIGATION CEILING AIR COND - THRM SWITCHES DRAINS / BOXES CABNT / MLLWRK FLOORING AIR COND - NOISE LITE FIXTURE PARKLOT PAVE DOOR TO EXT PAINTING FIRE SYST - ALL PARKLOT STRIPE DOOR @ ROOM PLUMB - SYST PARKLOT SIGN DOOR - SPECL ROOM/BLDG SIGN PLUMB - FIXT ALRM SYST - ANY SIDEWLKS - ALL BLDG LOUVRE ELEVATOR FENCE/GATE ROOFING ROOM PARTN ACCESS DR - ALL KITCHEN - ALL EXTER WALLS SHEETMETAL LOCKERS / STRG BOILER SEALANTS FIRE EXTNGSHR TOILET - PART WINDOW - FNSH SPEC EQPT TOILET - ACCESS WINDOW - OPER EQPT TESTED EXTER CLEAN INTERIOR CLEAN</p><p>Submitted prior to scheduling FINAL INSPECTION: DATE TO CNSLT BY ENGR Building Occupancy application submitted Fire Dept – Inspection & punchlist compl >> Plumbing Certificate Field-Posted As-Built Drawings – ALL >> Water Certificate Maintenance Service Contracts – ALL >> Electrical Certificate O & M Manual – ALL - 1 HARCOPY >> Elevator – TEMP – Copy to User PROJECT IS READY FOR FINAL INSPECTION TENTATIVE DATE AFTER ACCEPTANCE: - Inspector to follow – up to NOTIFY ……. INSPECTOR: DATE VERIFY 1. Punch list is completed – Notify Engineer & User - give completed checklist Notify Central Service, Contractor, Consultant, Engineer by EMAIL 2. Notify Engineer, Central Service & User for end of 30-day TROUBLE FREE for Air Condition 3. Notify Engineer, Central Service & Users Maintenance and send copy for: Elevator – Permanent Permit SPECIAL EQUPT - ALL ENGINEER: DATE VERIFY 1. Notify CSD of 30 day Air Condition – Trouble Free Date LETTER Send CSD & Contractor – Maintenance Contract – LOG IN CLOSING DOC AS SENT 2. Send Elevator Contract – if applicable – LOG IN CLOSING DOC AS SENT 3. COMPILE & LOG-IN FOR CLOSING DOCS CHECKLIST Air Cond – Maint – See ENGR #1 Elevator PERMANENT Permit – See INSP #3</p><p>IGC99-SEC7.31-P41 v2.031018</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us