Technical Evaluation Report

Technical Evaluation Report

DRAFT Mongolia Ministry of Finance, Mongolia Ref:WB/MOF/MINIS/CS/QCBS/1.1.4 (c)/2015 Project Name: Mining Infrastructure Investment Support Project (MINIS) Credit# 4888-MN Terms of Reference for the Feasibility Study for “Shuren hydropower plant” project Funded by: International Development Association Date: October2015 1 Terms of Reference for a Feasibility Study of DRAFT ‗Shuren Hydropower Plant‘ Project 2 Terms of Reference for a Feasibility Study of DRAFT ‗Shuren Hydropower Plant‘ Project CONTENTS A. GENERAL INFORMATION ..................................................................................................... 6 A 1. Introduction ..................................................................................................................... 6 A 1.1. Background .............................................................................................................. 6 A 1.2. The Government Policy of Mongolia ....................................................................... 7 A 1.3 Project Region .......................................................................................................... 8 A 1.4. Project initial screening ........................................................................................... 9 A 2. Overall Scope of the Study .............................................................................................. 9 A 2.1. The Purpose of Feasibility Study .............................................................................. 9 A 2.2. Integration with the ESIA ....................................................................................... 10 A 2.3. Advisory Committee .............................................................................................. 10 B. UPDATE OF PROJECT CHARACTERISTICS .................................................................. 11 B 1. Review of Previous Studies and Site Visits ................................................................... 11 B 2. Power Demand and Sector Review ............................................................................... 11 B 3. Updated Surveys and Investigations ............................................................................. 12 B 3.1. Engineering Topographic Survey ........................................................................... 12 B 3.2. Geological and Geotechnical Investigations .......................................................... 12 B 3.3. Seismic Studies ...................................................................................................... 14 B 3.4. Construction Material Studies ............................................................................... 15 B 3.5. Geotechnical Baseline Report ................................................................................ 15 B 4. Updated Hydrology and Climate Change Assessment .................................................. 15 B 4.1. Meteorological and Hydrological Studies .............................................................. 15 B 4.2. Water Consumptions ............................................................................................. 16 B 4.3. Climate Change Assessment .................................................................................. 16 B 5. Assessment of power evacuation alternatives and integration to CES .......................... 16 B.5.1 Integration to CES .................................................................................................. 16 B 5.2. Transmission and Grid Connection ........................................................................ 17 B 6. Reservoir Modeling and Power Simulations ................................................................. 17 B 6.1. Reservoir Operation ............................................................................................... 17 B 6.2. Flood Routing ......................................................................................................... 18 B 7. Conceptual Scheme Layout ........................................................................................... 18 B 7.1 Basic Data Defining the Project Design.................................................................. 18 B 7.2. Dam Design ............................................................................................................ 19 B7.3. Stability and Structural Analysis ............................................................................ 20 3 Terms of Reference for a Feasibility Study of DRAFT ‗Shuren Hydropower Plant‘ Project B7.4. Dewatering and Water Diversion .......................................................................... 20 B 7.5. Design of Hydro-Mechanical and Electro-Mechanical Equipment ........................ 20 B 7.6. Infrastructure and Access Roads ........................................................................... 21 B 8. Site Selection ................................................................................................................. 21 B. 8.1 Costs and Benefits of Alternatives ......................................................................... 21 B 8.2. Multi-criteria Analysis for Site Selection ................................................................ 22 B 8.3. Site Selection Report and Workshop ..................................................................... 22 B 9. Feasibility Level Design ................................................................................................ 22 B. 9.1 Complementary Surveys and Investigations ......................................................... 22 B. 9.2 Design, Drawings and Bill of Quantities ................................................................. 22 B 10. Implementation Plans ................................................................................................ 23 B 10.1. Contract and Procurement Planning ..................................................................... 23 B 10.2. Implementation Schedule...................................................................................... 23 B 10.3. Project Operation Organization ............................................................................. 23 B 11. Dam Safety Measures ................................................................................................ 24 B 12. Legal Analyses ............................................................................................................ 24 B 12.1. Laws, Regulations and Electricity Tariff ................................................................. 24 B 12.2 Management and Financing Alternatives .............................................................. 24 B 13. Financial and Economic Analyses ............................................................................. 25 B13.1. Capital and Investment Costs ................................................................................ 25 B 13.2.Operating Expenses .................................................................................................... 25 B13.3. Direct and Indirect Benefits ................................................................................... 25 B 13.4 Financial and Economic Analyses .......................................................................... 26 B 14. Risk Register .............................................................................................................. 26 B 15. Final Recommendation .............................................................................................. 26 B 16. Feasibility Report and Workshop .............................................................................. 27 C. REPORTING REQUIREMENTS AND DELIVERABLES ................................................. 27 C1. Deliverables and Reporting ........................................................................................... 27 C1.1. Progress Reporting ................................................................................................ 27 C1.2. Main Reports ......................................................................................................... 27 C 2. Management of the Feasibility Study ............................................................................ 28 C 2.1 Roles and Responsibilities ..................................................................................... 28 C 2.2 Time Schedule ........................................................................................................ 28 C 2.3. Ownership and Control of Information, Data and Documents ............................. 29 4 Terms of Reference for a Feasibility Study of DRAFT ‗Shuren Hydropower Plant‘ Project D. REQUIRMENT FOR THE CONSULTANT TEAM ............................................................... 31 D1. Consultants Required .......................................................................................................... 31 D 2.Key Professional Qualifications and Competence for the Assignment .............................. 31 F IDENTIFIED RELEVANT STUDIES .................................................................................. 37 5 Terms of Reference for a Feasibility Study of DRAFT ‗Shuren Hydropower Plant‘ Project A. GENERAL INFORMATION A 1. Introduction A 1.1. Background The Government of Mongolia (GoM) has received a Technical Assistance Credit from the International Development Association (the Bank) in an amount equivalent to US$25 million, toward the cost of Mining Infrastructure Investment Support Project

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    39 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us