National Compact Stellarator Project

National Compact Stellarator Project

<p> NATIONAL COMPACT STELLARATOR PROJECT Engineering Change Proposal (ECP) COVER PAGE (TO BE COMPLETED BY SYSTEMS ENGINEERING SUPPORT MANAGER) Originator: Bob Simmons Date: February 18, 2008 ECP No: 059 ECP Title: Update of VV & Station 1 FPA Requirement Documents Required Reviewers Required Reviewers for this ECP: D. Rej, H. Neilson, P. Heitzenroeder, P. Goranson, M. Viola, L. Dudek, J. Malsbury, J. Levine, M. F. Malinowski, W. Reiersen, B. Nelson</p><p>ECP Approval Level Expedited ECP? Yes No Change Level: 3 Project Approving Official: 3 Reg ECP - Project Manager Actions (1) Update NCSX-CSPEC-185 (Station 1 Field Period Assembly) by 2/29/2008 (2) Update Run Procedure D-NCSC-FPA-001 (Field Period Assembly Station One) by 2/29/2008</p><p>APPROVALS (TO BE COMPLETED BY APPROVING OFFICIALS) Change Level Approving Approval? Signature Official 3 NCSX Project Yes No Manager 3a NCSX Yes No (Expedited ECP) Engineering Manager 2 NCSX Federal Yes No Project Director 1 Associate Yes No Director OFES 0 Deputy Secretary Yes No of Energy</p><p>1 NATIONAL COMPACT STELLARATOR PROJECT Engineering Change Proposal (ECP) PART I (TO BE COMPLETED BY ORIGINATOR) ECP- 059 Originator: Bob Simmons Date: February 18, 2008 Overview of Change</p><p>Type of ECP: EXPEDITED STANDARD </p><p>Type of Change: TECHNICAL COST SCHEDULE EDITORIAL</p><p>(Check all that Apply)</p><p>Reason for Change: </p><p>(1) Station 1 FPA CSPEC – need to clarify testing requirement relative to normal operating pressure of 300 psig. (2) Station 1 FPA Run Procedure - need to clarify testing requirement relative to normal operating pressure of 300 psig..</p><p>Impacted WBS Elements: WBS 12 & WBS 18 </p><p>Impacts of Change (Briefly Describe): </p><p>Update both Station 1 CSPEC and Run Procedure to reflect requirement to perform test at 120% of the operating pressure of 300 psig (i.e., 360 psig)</p><p>Does this Change Impact Material Already Procured or Parts/Assemblies Already Assembled/Manufactured using this Material: Yes No</p><p>If “Yes”, what is the recommended disposition of this material/part/assembly? “Use as is” – thermocouples as per revised NCR-3719 (Rev 1).</p><p>Assessment of Other Options: None. </p><p>List Attachments, Impacted Documents, etc.  None.</p><p>2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us