Maintenance Change Request s3

Maintenance Change Request s3

<p>RA Id: CR0165</p><p>CHANGE REQUEST</p><p>FOR THE UPDATE OF ISO 20022 FINANCIAL REPOSITORY ITEMS</p><p>A. Origin of the request: A.1 Submitter: Tieto A.2 Contact person: Ulrika Sjödahl, [email protected], +46104818037 Pirkko Vedenpää, [email protected], +358207257525 A.1 Sponsor: Tieto Corporation</p><p>B. Related messages: tsin.004.001.01 (FinancialInvoice)</p><p>C. Description of the change request: PhneNb (PhoneNumber), MobNb (MobileNumber) and FaxNb (FaxNumber) regular expression is now too tight. Make it simple as Max35Text. D. Purpose of the change: In a lot of the standard formats the format of phone number, mobile number and fax number is unstructured. With this very tight structure it is impossible to implement the unstructured numbers into this structure.</p><p>E. Urgency of the request: Normal.</p><p>F. Business examples: There are a lot of formats where the phone numbers and equal are handled sort of unstructured. E.g. in EDIFACT there are no rules, character string with 512 characters maximum. In Sweden the recommendation is as follows: “Preceded by the country code without plus sign. Area Code is displayed without leading zero, only numerical characters, exchanged in unedited form. Leading zeros are significant here!” maximum 15 characters. In Svefaktura the recommendation is as follows: “Contact numbers are to be given as an unedited character string, i.e. without space character, hyphen or other editing characters. They may be given in either of two formats:  As a national number, i.e. with a national prefix starting by zero. Example: 084527000</p><p>08a17edeb12dcb27631e18e27537364d.doc Produced by TIETO on 12 Mar 2012 Page 1 RA Id: CR0165</p><p> As an international number, starting with a leading plus sign and country number, followed by the national number without its leading zero. Example: +4684527000” In CEN/BII Invoicing BiiColl004 this type of information is defined as TextType. In UBL 2.0 Invoice this type of information is defined as TextType. BGC Invoice in Sweden also uses plain text for this type of information.</p><p>G. SEG recommendation: This section will be completed in due time by the SEG(s) in charge of the related ISO 20022 messages. </p><p>Consider Timing - Next yearly cycle: 2012/2013 (the change will be considered for implementation in the yearly maintenance cycle which starts in 2012 and completes with the publication of new message versions in the spring of 2013) - At the occasion of the next maintenance of the messages (the change will be considered for implementation, but does not justify maintenance of the messages in its own right – will be pending until more critical change requests are received for the messages) - Urgent unscheduled (the change justifies an urgent implementation outside of the normal yearly cycle) - Other timing:</p><p>Comments:</p><p>Reject Reason for rejection:</p><p>08a17edeb12dcb27631e18e27537364d.doc Produced by TIETO on 12 Mar 2012 Page 2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us