<p>Certification of Warranty Commencement State of Ohio Standard Forms and Documents Project Name Contract Number Project Location Contractor</p><p>Equipment and materials included Warranty start date Warranty end date*</p><p>*Date does not supersede or take precedence over Contract requirements.</p><p>Exceptions Required completion date for each equipment and material (Include terms and requirement s to cure each exception listed, e.g., testing, maintenanc e, cleaning, etc.)</p><p>Contractor Architect/Engineer Approval Certification Equipment / material accepted for this Contract. F390-02v0912 Page 1 of 1 Project [AGY-FYNNNN] [Project Name]</p><p>Warranty(ies) certified to comply with the Contract Documents. Name Name</p><p>Signature Date Signature Date</p><p>Construction Owner Acknowledgement Manager Owner acknowledges receipt of warranty(ies), manual(s) and all other required Approval submittals associated with the noted equipment or material. Equipment / material accepted for this Contract. Name Name</p><p>Signature Date Signature Date</p><p>SAO-F800-00v0610 Page 2 of 2</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-