<p> Aero Tech Manufacturing Inc 395 W 1100 N North Salt Lake, UT 84054 Toll Free: 866-390-2376 Phone: 801-292-0493 Fax: 801-292-9908 E-mail: [email protected] Web Site: www.aerotechmfg.com</p><p>Produced by Reed Construction Data, this Buildcore 3-part Specification utilizes Construction Specifications Canada’s (CSC) Manual of Practice (MoP), including MasterFormat™, SectionFormat™ and PageFormat™. Each publication is available from CSC. A Buildcore 3-part Specification is a manufacturer-specific product specification using the proprietary method of specifying applicable to project specifications and master guide specifications. Optional text is indicated by brackets, [ ]. SPEC NOTES precede specification text. Trade/brand names with appropriate product model numbers, styles and types are used in SPEC NOTES and in the specification text Article titled “Acceptable Material.” Metric conversion, where used, is soft metric conversion. This Buildcore 3-part Specification specifies metal hydronic radiant ceiling panels, as manufactured by Aero Tech Manufacturing Inc. Revise Buildcore 3-part Specification section number and title below to suit project requirements, specification practices and section content. Refer to CSI/CSC MasterFormat for other section numbers and titles. Delete unused optional text and SPEC NOTES in final copy of specification in accordance with CSC recommended specification writing practice.</p><p>1 General</p><p>1.1 SECTION INCLUDES</p><p>.1 This Section specifies metal hydronic radiant ceiling panels.</p><p>1.2 RELATED SECTIONS</p><p>SPEC NOTE: Include in this Article only those Sections that directly affect the work of this Section and are referenced in the project section. Do not include Division 00 or Division 01 Sections since it is assumed that all technical sections are related to all project Division 00 and Division 01 Sections to some degree.</p><p>.1 Section [05 50 00 - Metal Fabrications: Aluminum mouldings].</p><p>.2 Section [09 53 00 - Acoustical Ceiling Suspension Assemblies: Ceiling suspension grid, wall channel mouldings and T-bars].</p><p>.3 Section [23 83 16 - Radiant-Heating Hydronic Piping: Connections to radiant heating system piping].</p><p>SPEC NOTE: Article below may be omitted when specifying Aero Tech Manufacturing Inc’s proprietary products and recommended installation. Retain Reference Article when specifying products and installation by an industry reference standard. If retained, list only standard(s) referenced in this section. Indicate issuing authority name, acronym, standard designation and title. Section 01 42 19 - Reference Standards may include the full names and addresses of the organizations whose standards are referenced in a project. The section can also be used for the editions or dates of referenced standards not otherwise indicated. Edit the following lists and delete standards not required for the specific project.</p><p>1 1.3 REFERENCES</p><p>.1 ASTM International (ASTM).</p><p>.1 ASTM B 88-03, Standard Specification for Seamless Copper Water Tube.</p><p>.2 Buildcore, Reed Construction Data.</p><p>.1 Aero Tech Manufacturing Inc Buildcore Datasheet Section 23 83 00 - Radiant Heating Units.</p><p>1.4 ADMINISTRATIVE PROCEDURES</p><p>SPEC NOTE: Describe requirements for meetings to co-ordinate materials and techniques, and to sequence related work for sensitive and complex items.</p><p>.1 Pre-installation meetings: Conduct pre-installation meeting [one week] prior to commencing [work of this Section] [and] [on-site installations] to verify project requirements, substrate conditions, co-ordination with other building subtrades, and to review] [Aero Tech Manufacturing Inc’s] [manufacturer’s] installation instructions and warranty requirements. Comply with [Section 01 31 19 - Project Meetings].</p><p>.2 Sequencing: Sequence with other work in accordance with Section [01 12 16 - Work Sequence]. Comply with [Aero Tech Manufacturing Inc’s] [manufacturer’s] written recommendations for sequencing construction operations.</p><p>SPEC NOTE: Include requirements for co-ordinating work that requires unusual scheduling with work in another Section.</p><p>.3 Scheduling: Schedule with other work in accordance with Section [01 32 13 - Scheduling of Work].</p><p>1.5 ACTION SUBMITTALS</p><p>.1 General: Submit listed action submittals in accordance with Contract Conditions and Section [01 33 00 - Submittal Procedures].</p><p>.2 Product data: Submit product data, including [Aero Tech Manufacturing Inc’s Buildcore Datasheet Section 23 83 00 – Radiant Heating Units] [manufacturer’s printed data sheets] and catalogue pages illustrating products to be incorporated into project for specified products.</p><p>.1 Submit [two] copies of Workplace Hazardous Materials Information System (WHMIS) Material Safety Data Sheets (MSDS).</p><p>.3 Shop drawings: Indicate information on shop drawings as follows.</p><p>.1 Panel layout and details of areas where radiant panels are indicated.</p><p>SPEC NOTE: Samples are full-size actual products intended to illustrate the products to be incorporated into the project. Sample submittals are commonly necessary for such characteristics as colours, textures and other appearance issues.</p><p>.4 Samples: Submit as follows.</p><p>2 .1 [1] sample of each type of panel and accessory specified.</p><p>1.6 INFORMATION SUBMITTALS</p><p>SPEC NOTE: Describe certificates intended to document affirmations by the Contractor or other entities that the work is in accordance with the Contract Documents.</p><p>.1 Certificates: Product certificates signed by [Aero Tech Manufacturing Inc] [manufacturer] certifying materials comply with specified performance characteristics, criteria and physical requirements.</p><p>SPEC NOTE: Specify submittals intended to document Aero Tech Manufacturing Inc’s installation, storage and other instructions.</p><p>.2 Installer instructions: Submit [Aero Tech Manufacturing Inc’s] [manufacturer’s] installation [, storage] [and] [handling] instructions.</p><p>SPEC NOTE: Co-ordinate with Field Quality Control in Part 3. When Aero Tech Manufacturing Inc’s services are specified during construction operations to verify installation, include following Article for the submittal of instructions and reports. If no field inspections are required, delete the following Article. </p><p>.3 Manufacturer’s reports: [Aero Tech Manufacturing Inc’s] [manufacturer’s] field reports specified.</p><p>1.7 CLOSEOUT SUBMITTALS</p><p>.1 Operation and maintenance data: Submit Operation and Maintenance Data for installed products in accordance with Section [01 78 00 - Closeout Submittals] [01 78 23 - Operation and Maintenance Data].</p><p>.2 Warranty documentation: Submit warranty documents specified.</p><p>1.8 MAINTENANCE MATERIAL</p><p>.1 Submit [Aero Tech Manufacturing Inc’s] [manufacturer’s] instructions in accordance with Section [01 33 00 - Submittals] covering maintenance requirements and parts catalogue, and including complete list of repair and replacement parts with cuts and identifying numbers.</p><p>SPEC NOTE: Include standards, limitations and criteria that establish an overall level of quality for products and quality of work for this Section. Co-ordinate with Section 01 43 00 - Quality Assurance.</p><p>1.9 QUALITY ASSURANCE</p><p>SPEC NOTE: Article below should list obligations for compliance with specific code requirements particular to this Section. General statements to comply with a particular code are typically addressed in Contact Conditions and Section 01 41 00 - Regulatory Requirements. Repetitive statements should be avoided. Current data on building code requirements and product compliance may be obtained from Aero Tech Manufacturing Inc technical support specialists.</p><p>3 SPEC NOTE: Metal hydronic radiant ceiling panels must also meet the requirements of building codes and zoning bylaws issued by Federal, Provincial and Municipal government authorities having jurisdiction. Ensure that project specification section reflects the need to meet these requirements. Edit Article below as applicable.</p><p>.1 Regulatory requirements: Comply with [National Building Code (NBC)] [Building Code for [Province] [Territory] [City] of [______]].</p><p>.2 Qualifications</p><p>.1 Manufacturer: Capable of providing field service representation during construction and approving application method.</p><p>.2 Installer: Experienced in performing work of this Section and who has specialized in installation of work similar to that required for this project.</p><p>SPEC NOTE: Specify special and unique packing, shipping or handling instructions, and special measures needed to prevent damage to products prior to application or installation. Co-ordinate with Section 01 61 00 - Common Product Requirements.</p><p>1.10 DELIVERY, STORAGE AND HANDLING</p><p>.1 Delivery and acceptance requirements</p><p>.1 Deliver material in accordance with Section [01 61 00 - Common Product Requirements] and in accordance with [Aero Tech Manufacturing Inc’s] [manufacturer’s] written instructions.</p><p>.2 Deliver materials in [Aero Tech Manufacturing Inc’s] [manufacturer’s] original packaging with identification labels intact and in sizes to suit project.</p><p>.2 Storage and handling requirements: Store materials protected from exposure to harmful weather conditions and at temperature conditions recommended by [Aero Tech Manufacturing Inc] [manufacturer].</p><p>.3 Packaging waste management</p><p>SPEC NOTE: Include the following Articles to specify information that will provide direction to the Contractor for the disposal of construction waste materials using environmentally responsible methodology that divert waste from landfill sites.</p><p>.1 Separate waste materials for [reuse] [and] [recycling] in accordance with [Section 01 74 19 - Construction Waste Management and Disposal].</p><p>SPEC NOTE: Aero Tech Manufacturing Inc may take back packaging and delivery materials for recycling.</p><p>.2 Remove from site and dispose of packaging materials at appropriate recycling facilities.</p><p>.3 Collect and separate for disposal [paper] [plastic] [polystyrene] [corrugated cardboard] [metal banding] packaging material [in appropriate on-site bins] for recycling.</p><p>4 .4 Fold up metal and plastic banding, flatten and place in designated area for recycling.</p><p>.5 Remove pallets from site and return to supplier or [Aero Tech Manufacturing Inc] [manufacturer].</p><p>1.11 SITE CONDITIONS</p><p>SPEC NOTE: Specify the ambient conditions under which the work must be performed in order for the work results to provide the specified quality. Conditions can include factors such as temperature, humidity, lighting, or conditions of completion of related work or substrates.</p><p>.1 Ambient conditions: Assemble and erect components only when temperatures are above [4]ºC ([40]ºF).</p><p>SPEC NOTE: Co-ordinate this Article with CCDC 2, or other Agreement documents, Contract Conditions and with Section 01 78 36 - Warranties. Consult with Aero Tech Manufacturing Inc for specific warranty requirements.</p><p>1.12 WARRANTY</p><p>.1 Project warranty: Refer to [CCDC 2] for project warranty provisions and co-ordinate with Section [01 78 36 - Warranties].</p><p>.2 Manufacturer’s warranty: Submit, for Owner’s acceptance, [Aero Tech Manufacturing Inc’s] [manufacturer’s] standard warranty document executed by authorized company official. [Aero Tech Manufacturing Inc’s] [manufacturer’s] warranty is in addition to and does not limit other rights Owner may have under Contract Documents or Canadian Law.</p><p>SPEC NOTE: Co-ordinate this Article with Aero Tech Manufacturing Inc’s warranty requirements.</p><p>.3 Warranty period: [One year], commencing on Date of Substantial Performance of Work. Warranty covers [labour] [and] [repair or replacement of defective components] for [one year] after completion.</p><p>2 Products</p><p>2.1 MANUFACTURERS</p><p>.1 Ensure [Aero Tech Manufacturing Inc] [manufacturer] has minimum [five] years experience in manufacturing components similar to or exceeding requirements of project.</p><p>.2 Manufacturer list</p><p>.1 Aero Tech Manufacturing Inc, 395 W 1100 N, North Salt Lake, UT 84054; Toll Free: 866-390-2376; Phone: 801-292- 0493; Fax: 801-292-9908; E-mail: [email protected]; Web Site: www.aerotechmfg.com.</p><p>SPEC NOTE: If a Division 01 Section covers this substitution on a project-wide basis, do not repeat that requirement here. Do not include substitution procedures here unless not defined elsewhere.</p><p>.3 Substitution limitations</p><p>.1 [In accordance with [Section 01 25 13 - Product Substitution Procedures][______].] [No substitutions permitted.] </p><p>5 SPEC NOTE: Include an overall description of the system, assembly, product, or material. Include required properties or characteristics that do not obviously belong under other titles. Examples: Configuration, size and colour.</p><p>2.2 PERFORMANCE CRITERIA</p><p>SPEC NOTE: Specify the following Article for extruded panels. Refer to Aero Tech Manufacturing Inc’s literature for performance values and fill in values to suit project requirements.</p><p>.1 Heating output (metric): [______] BTU/hr/LF for [______] mm ([______]") wide panel at [_____]ºC ([______]ºF) mean water temperature when room temperature is 21ºC (70ºF).</p><p>SPEC NOTE: Specify the following article for formed panels. Refer to Aero Tech Manufacturing Inc’s literature for performance values and fill in values to suit project requirements.</p><p>.2 Heating output (metric): [______] BTU/hr/LF for [______] mm ([______]") wide panel at [_____]ºC ([______]ºF) mean water temperature when room temperature is 21ºC (70ºF).</p><p>SPEC NOTE: Specify extruded ceiling system as a completely pre-engineered, designed and tested system installed in an exposed inverted “T” suspension system supplied and installed by acoustical contractor. System must include interconnecting piping and required trim.</p><p>.3 Suspension system: Inverted main Ts, 0.76 mm (0.030") minimum steel thickness accurately levelled and installed. Cross-tees 0.53 mm (0.021") minimum steel thickness installed in accordance with shop drawings with clean edge cuts. Install hangers at [0.91] mm ([36]") maximum.</p><p>2.3 EXTRUDED ALUMINUM RADIANT PANELS</p><p>SPEC NOTE: Specify extruded and/or formed panels and co-ordinate to suit project requirements.</p><p>SPEC NOTE: Specify extrusion(s) to suit project requirements.</p><p>.1 Standard extrusions:</p><p>.1 Fluted one tube: [152 mm (6")] [146 mm (5-3/4")] [127 mm (5")].</p><p>.2 Fluted two tube: [229 mm (9")] [203 mm (8")].</p><p>.3 V-groove one tube: [127 mm (5")] [152 mm (6")].</p><p>.4 V-groove two tube: 203 mm (8").</p><p>.5 Smooth one tube: 152 mm (6").</p><p>.6 Smooth two tube: 203 mm (8").</p><p>.2 Drapery recess extrusions:</p><p>6 .1 Fluted one tube: 152 mm (6").</p><p>.2 Fluted two tubes: 203 mm (8").</p><p>.3 V-groove one tube: 152 mm (6").</p><p>.3 Extruded linear panels: Completely factory assembled.</p><p>SPEC NOTE: 3.7 m (12') is the standard maximum panel length; panels up to 4.9 m (16') long are available on special request. Edit length below to suit project requirements.</p><p>.4 Panel length: 3.7 m (12').</p><p>.5 Copper tubing: ASTM B 88, Type L, 12.8 mm (0.505") inside diameter.</p><p>SPEC NOTE: Custom finishes are available.</p><p>.6 Finish: [Aero Tech Manufacturing Inc’s] [Manufacturer’s] baked enamel in white.</p><p>SPEC NOTE: Retain accessories below to suit project requirements.</p><p>.7 Accessories:</p><p>SPEC NOTE: Bullnose can be used for free hanging of panels where instances of an open structure are specified or desired. In lieu of Bullnose, a panel with a 51 mm (2") integral side section may also be used. Contact Aero Tech Manufacturing Inc for more information.</p><p>.1 Bullnose: Include bullnose fluted extrusion.</p><p>.2 Surface mounting: Include surface mount frame with hanger bracket.</p><p>SPEC NOTE: Frame specified in the following Article can be used to flush mount panels to a gypsum board ceiling.</p><p>.3 Recess mounting: Include recess mounting frames.</p><p>2.4 FORMED METAL RADIANT PANELS</p><p>SPEC NOTE: Select size(s), edge(s) and pattern required. If more than one panel configuration is selected, co-ordinate locations with drawings.</p><p>.1 Size: [610 mm × 1219 mm (24" × 48")] [610 mm × 610 mm (24" × 24")].</p><p>.2 Edge: [Square] [T-egular for 23.8 mm (15/16") grid] [T-egular for 14.3 mm (9/16") grid].</p><p>.3 Perforations: [Aero Tech Manufacturing Inc’s] [Manufacturer’s] standard block perforation pattern.</p><p>7 SPEC NOTE: Custom finishes are available. Silk screen patterns are available to match some USG, Celotex and Armstrong ceiling panels; see Aero Tech Manufacturing Inc’s literature.</p><p>.4 Copper tubing: ASTM B 88, Type L, 12.8 mm (0.505") inside diameter.</p><p>SPEC NOTE: Custom colours are available.</p><p>.5 Finish: [[Aero Tech Manufacturing Inc’s] [manufacturer’s] baked enamel in white] [Silk screen pattern to match].</p><p>SPEC NOTE: Specify accessories in the following article to suit project requirements.</p><p>2.5 ACCESSORIES</p><p>SPEC NOTE: False Tees below can be used to simulate a grid pattern other than 610 mm × 1219 mm (24" × 48") or 610 mm × 610 mm (24" × 24").</p><p>.1 False tee: Include false tees to simulate grid pattern.</p><p>SPEC NOTE: Bracket specified in the following Article can be used to surface mount panels to a gypsum board ceiling.</p><p>.2 Surface mounting: Include surface mount frame with hanger bracket.</p><p>SPEC NOTE: Frame specified in the following Article can be used to flush mount panels to a gypsum board ceiling.</p><p>.3 Recess mounting: Include recess mounting frames.</p><p>2.6 FABRICATION</p><p>SPEC NOTE: Specify extruded and/or formed panels from the following article to suit project requirements.</p><p>.1 Extruded aluminum radiant panels: Factory-assembled panels with factory-installed return bends.</p><p>.1 Fabricate panels from 2.54 mm (0.100") thick extruded aluminum strips.</p><p>.1 Use copper tube crimped into extrusion to ensure 300º minimum contact between copper tube and aluminum extrusion under operating temperature conditions.</p><p>.2 Use of adhesives or clips to attach copper tube to aluminum extrusion is not acceptable.</p><p>.2 Formed metal radiant panels:</p><p>.1 Fabricate edges to fit standard ceiling suspension grid.</p><p>.2 Fabricate panels from 1 mm (0.040") thick aluminum sheet with reinforcing to maintain horizontal plane flatness.</p><p>.3 Fabricate panels six rows minimum of serpentine copper tubing spaced at 89 mm to 102 mm (3-1/2" to 4") on centre and continuously soldered lengthwise along panel back.</p><p>8 .1 Solder joints: Develop sufficient strength to ensure tube cannot be peeled away from panel without distorting panel.</p><p>.2 Leave tube ends unsoldered for 52 mm (6") to provide for soldered joint panel connections.</p><p>.3 Attachment of copper tube to aluminum sheet using adhesive or clips is not acceptable.</p><p>2.8 SOURCE QUALITY CONTROL</p><p>.1 Ensure radiant heating panels and accessories are from [Aero Tech Manufacturing Inc] [single manufacturer].</p><p>3 Execution</p><p>3.1 INSTALLERS</p><p>.1 Provide experienced and qualified technicians to carry out erection, assembly and installation of radiant heating panels.</p><p>3.2 MANUFACTURER’S INSTRUCTIONS</p><p>.1 Compliance: Comply with [Aero Tech Manufacturing Inc’s] [manufacturer’s] written recommendations, specifications, including product technical bulletins, catalogue installation instructions, product carton handling, storage and installation instructions [and Aero Tech Manufacturing Inc Buildcore Datasheet Section 23 83 00 - Radiant Heating Units].</p><p>SPEC NOTE: Specify actions required to determine that conditions are acceptable to receive the primary products of the section.</p><p>3.3 EXAMINATION</p><p>.1 Examine conditions, substrates and work to receive the work of this Section, co-ordinate with Section [01 71 00 -Examination and Preparation].</p><p>.1 Verification of conditions: Verify that substrate conditions that have been previously installed under other Sections or Contracts, are acceptable for product installation in accordance with [Aero Tech Manufacturing Inc’s] [manufacturer’s] instructions prior to installation of radiant heating units.</p><p>.2 Inform [Owner] [Architect] [Consultant] of unacceptable conditions immediately upon discovery.</p><p>.3 Proceed with installation only after [unacceptable conditions have been remedied] [and after receipt of written approval from [Owner] [Architect] [Consultant]].</p><p>SPEC NOTE: Specify actions required to prepare the surface, area or site to incorporate the primary products of the work result of the Section. Describe requirements for exposure or removal of existing assemblies, components, products or materials.</p><p>3.4 PREPARATION</p><p>.1 Ensure structure or substrate is adequate to support radiant heating units.</p><p>9 3.5 INSTALLATION</p><p>.1 Install systems and components in accordance with [Aero Tech Manufacturing Inc’s] [manufacturer’s] written instructions and co-ordinate with Section [01 73 00 - Execution] and Section [01 73 19 - Installation].</p><p>.2 Co-ordinate radiant heating unit work with work of other trades, for proper time and sequence to avoid construction delays.</p><p>.3 Install radiant heating units plumb and level in accordance with [Aero Tech Manufacturing Inc’s] [manufacturer’s] written instructions.</p><p>.4 Accurately fit and align, securely fasten and install free from distortion or defects.</p><p>3.6 FIELD QUALITY CONTROL</p><p>SPEC NOTE: Specify requirements for quality control (and related quality assurance) for on-site activities and installed materials, manufactured units, equipment, components and accessories.</p><p>.1 Site tests and inspections:</p><p>.1 Co-ordinate site test with Section [01 45 00 - Quality Control].</p><p>.2 Leak test panels in accordance with piping testing requirements.</p><p>SPEC NOTE: Specify specific requirements if Aero Tech Manufacturing Inc is to provide field quality control with on-site personnel for instruction or supervision of the installation/application/erection/construction of their products, training, or for start-up or demonstration. Aero Tech Manufacturing Inc’s field reports are included under the Part 1 Article, Submittals.</p><p>.2 Manufacturer services:</p><p>SPEC NOTE: Use the following Articles only when Aero Tech Manufacturing Inc’s field services are desired to verify the quality of the installed components. Establish the number and duration of periodic site visits required by Aero Tech Manufacturing Inc and specify below. Consult with Aero Tech Manufacturing Inc for services required. Delete if field services are not required.</p><p>.1 Co-ordinate [Aero Tech Manufacturing Inc’s] [manufacturer’s] services with Section [01 45 00 - Quality Control]. Have [Aero Tech Manufacturing Inc] [manufacturer] review work involved in handling, installation/application, protection and cleaning of its product[s], and submit written reports, in acceptable format, to verify compliance of work with Contract.</p><p>.2 Manufacturer’s field services: Provide [Aero Tech Manufacturing Inc’s] [manufacturer’s] field services, consisting of product use recommendations and periodic site visits for inspection of product installation, in accordance with [Aero Tech Manufacturing Inc’s] [manufacturer’s] instructions.</p><p>.3 Schedule site visits to review work at stages listed:</p><p>10 .1 After delivery and storage of products, and when preparatory work on which work of this Section depends is complete, but before installation begins.</p><p>.2 [Twice] during progress of work at [25%] and [60%] complete.</p><p>.3 Upon completion of work, after cleaning is carried out.</p><p>.4 Obtain reports within [three] days of review and submit immediately to Consultant.</p><p>SPEC NOTE: Specify final actions required to prepare installed products to perform properly.</p><p>3.7 ADJUSTING</p><p>.1 Adjust components and systems for correct function and operation in accordance with [Aero Tech Manufacturing Inc’s] [manufacturer’s] written instructions and co-ordinate with Section [01 75 00 - Starting and Adjusting].</p><p>3.8 CLEANING</p><p>.1 Do cleanup in accordance with Section [01 74 00 - Cleaning and Waste Management] and Section [01 74 13 - Progress Cleaning].</p><p>.2 Upon completion, remove surplus and excess materials, rubbish, tools and equipment.</p><p>SPEC NOTE: Co-ordinate the following Article with Section 01 76 00 - Protecting Installed Construction.</p><p>3.9 PROTECTION</p><p>.1 Protect installed product from damage during construction in accordance with Section [01 76 00 - Protecting Installed Construction].</p><p>.2 Make good damage to adjacent materials caused by radiant heating unit installation.</p><p>END OF SECTION</p><p>11</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-