Structure Codes

Structure Codes

<p>The following is a comparison of the unit costs from Cost 2015 to Cost 2016. Only changes in excess of 10% (+ or -) are identified. Due to the change from indexed costs to current costs the majority of structure codes will fluctuate on a yearly basis. The percentage changes are approximate and may be greater or less depending upon the data.</p><p>Structure Codes</p><p>AP2 – Expect an increase of 22% AP5 – Expect an increase of 26% GB1 – Expect an increase of 32% GB2 – Expect a decrease of 22% GH4 – Expect an increase of 23% GN1 – Expect a decrease of 41% RG4 – Expect an increase of 10%</p><p>UCI Codes</p><p>001800.030 Airport Runway – Asphalt – Expect a decrease of 23% 001800.080 Airport Edge or Runway Lights- Expect an increase of 24-26% 001800.090 Airport Taxiway Lights – Expect an increase of 11-13% 002200.001 Excavation Common Area – Low – Expect an increase of 17% 002230.002 Paving - Stone Base – Expect a decrease of 12-16% 002300.004 Tunnel – 4 Inch Wall – Expect an increase of 13-16% 002500.005 Catch Basin - Precast 5'I.D. – Expect an increase of 16-30% 002525.004 Paving - Granite Splitface – Expect an increase of 12-14% 002575.001 Paving – Sealcoating – Expect a decrease of 13-15% 002610.XXX Pipe – Various – Depending on code extension, expect an increase of 10-29% 002620.XXX Pipe – Various – Depending on code extension, expect an increase of 10-15% 002640.XXX Valves – Various – Depending on code extension, expect an increase of 10-20% 002670.001 Water Well - Pump Only – Expect a decrease of 10-11% 002740.002 Tank - Concrete Septic – Expect an increase of 26% 002790.101 Tower- TV Self- Support – Expect a decrease of 10-17% 002796.002 Equip Shed Steel Cabinet w/Pit – Expect a decrease of 11-13% 002840.002 Guardrail – Timber – Expect a decrease of 14-16% 004400.XXX Stone Wall 6'-10' ht – Depending on code extension, expect an increase of 14-15% 006100.XXX Lumber – Depending on code extension, expect an increase of 10-30% 013125.001 Grandstand/ Bleacher – Expect an increase of 10% 013125.003 Grandstand/ Bleacher – Expect an increase of 11% 013125.004 Grandstand/ Bleacher Roof-Sq Ft – Expect a decrease of 16-22% 013206.001 Tank – Concrete – Expect an increase of 10-22% 013215.012 Tank - Polyfiber (A.G.) – Expect an increase of 10% 015260.025 Insulation - fbrgls Pipe 2.5" – Expect an increase of 10-13% 015400.000 Compressor Station – Expect an increase of 10-12% 015400.201 Compressor - Rtry Scr 1Stg A/C – Expect a decrease of 13% 015780.001 Refrigeration – HVAC – Expect a decrease of 32% 015780.003 Refrigeration - Pkg Unit w/ Htr – Expect an increase of 16-17% 016110.006 Conduit - Rigid Galv (UG) – Expect a decrease of 11% 016122.213 Conductor - Insul Al (M) – Expect an increase of 10-13% 016123.240 Cable - Pls Cv 600V Al 4 Cnd Ug – Expect a decrease of 19-21% 016320.501 Transformer - Dry Type 1PH – Expect an increase of 13% 016320.502 Transformer - Dry Type 3PH – Expect an increase of 13-15% 016330.001 Voltage Regulator- <601V 1PH – Expect an increase of 11-13% 016380.024 Capacitor - 240V – Expect a decrease of 10% 016580.000 Liner- Hyplon 45Mill – Expect an increase of 11-13%</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us