
<p>PARKING RESTRICTIONS FOR STREET RESURFACING PARKING RESTRICTIONS FOR STREET RESURFACING</p><p>***UPDATED***</p><p>The city’s contractor, West Contracting plans to begin the street resurfacing process Thursday, October 5, and complete all resurfacing work by Monday, October 9. </p><p>In order to perform the work we ask for your cooperation in 2 areas. First, we ask that you refrain from watering your grass and landscaped areas between the hours of 10 pm the previous day to 3 pm on the day of the work. The street must be dry in order for the new pavement materials to adhere correctly. </p><p>Second, we ask that you refrain from on-street parking (between the hours of 7am – 3 pm) per the following schedule: </p><p>Thursday, October 5: No parking on street along 800-1100 blocks of Glenway Dr, Warwick Lane, 900 block of Victoria Ave, Lisa Kay Dr, Alexandra Ave, and Albert Ave (pavement preparations)</p><p>Friday, October 6: No parking on street along 800-1100 blocks of Glenway Dr, Warwick Lane, and Alexandra Ave (resurfacing)Tuesday</p><p>Monday, October 9: No parking on street along 900 block of Victoria Ave, Albert Ave, and Lisa Kay Dr</p><p>“No Parking on Street Tomorrow” and temporary “No Parking” signs will be posted per this schedule above the day before the parking restriction. </p><p>IN THE EVENT OF RAIN, THE SCHEDULE MOVES FORWARD 1 DAY</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-