From Gold Coast Water Slides

From Gold Coast Water Slides

<p>Leakage and Pressure Management Strategy for the Gold Coast developed by Wide Bay Water (WBW) from Gold Coast Water slides</p><p>Introduction • In 2002/03 approximately 10% of potable water supplied was unaccounted for water (UFW) • Typically, 50% of UFW is water lost through undetectable leaks • Wide Bay Water (WBW) developed a leakage and pressure management strategy for the Gold Coast</p><p>District Metered Areas • Water supply network to be divided into District Metered Areas (DMAs) • Each DMA includes approx. 500-1500 connections • Each DMA preferably fed from one water main • Flow meter and flow-modulated pressure reducing valve (PRV) installed on feed main</p><p>Reducing Leakage in a DMA • Flow meter allows the quantity of water entering DMA to be monitored • During the early hours of the morning, the majority of measured flow is leakage • Leaks are located using specialised equipment then repaired • DMAs allow new leaks to be identified quickly and make locating leaks easier</p><p>Reducing Pressure in a DMA • PRV allows the water pressures in the DMA to be controlled • Using a flow-modulated PRV allows the water pressure to vary according to the demand • This ensures adequate water pressure during high demand periods and for fire fighting, while reducing excessive night time pressures</p><p>Advantages • Reduced consumption due to repair of leaks • Reduced consumption due to lower pressure • Reduced water main and property service breaks • Improved customer service • Longer asset life • Reduced maintenance and renewals costs for water mains and property services</p><p>Negative Impacts • Potential problems with internal plumbing, hot water services or irrigation systems due to reduced water pressure • Potential water quality problems associated with more ‘dead ends’ in the water network</p><p>Environmental and Social Impacts • Benefits associated with deferring or reducing the need for additional capacity in the water supply system • Low cost option • Negligible energy consumption and Greenhouse Gas generation</p><p>Burleigh Waters Pilot Trial • DMA created which incorporates 3,310 connections • Single water main supplies the area at the corner of Deodar Drive and Symonds Road • Flow meter and flow-modulated PRV installed at the same location</p><p>• Reduction in background leakage of 2.95L/second (0.25ML/day) – 48% reduction to the minimum night flow in the area • Pilot trial results significantly better than expected at the start of the trial • Additional water savings due to consumption reduction are expected but have not been quantified</p><p>Citywide Implementation • 2 additional pilot trials are to be undertaken in Beenleigh and Eagleby • Planning phase for Citywide implementation approved by Council • 108 permanent DMAs planned for the existing areas of the City (highrise strip to be excluded) • Future development areas to have water supply networks designed as DMAs</p><p>Citywide Water Savings • Conservative estimate of savings for leakage and pressure management adopted in current water balance – 20ML/day • Based on a reasonable estimate of leakage per DMA, extrapolated across existing and future areas of the City • Implementation will occur over a period of time. • More conservative timeframe adopted than is included in current construction plan • Capital cost to implement in existing areas is $6.5million • Ongoing costs associated with maintenance, and leakage detection and repair • Reduced revenue will be offset by reduced water treatment and asset renewals costs, and deferral of headworks Conclusions • Leakage and pressure management presents the opportunity for significant water savings at low cost • Suggested that the Advisory Committee adopt a conservative estimate in the order of 20ML/day to be saved by 2056, and that this figure be revised as further information becomes available</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us