<p> MUNICIPAL CORPORATION OF DELHI OFFICE OF THE EX. ENGINEER (CWG)-VI ZONAL OFFICE BUILDING: NARELA DELHI-110040</p><p>STATUS OF VARIOUS PROJECTS UNDERTAKEN</p><p>1. Works costing upto Rs. 2.00 lac (As on 29.12.08)</p><p>S.No Name of the Project alongwith brief details Cost of the Date of award Date of starting of Date of Present status Project/work of work work completion of work 1 Const. of 7 Nos. class rooms in M.C. Pry. School, Singhola in 1,67,950/- 31.3.08 9.4.08 8.5.08 Completed. Narela Zone. SH: Soil investigation & consultancy services. 2 Const.of drain from Hari Kishan house to transformer in village 1.72,491/- 31.3.08 9.4.08 8.6.08 Work completed. Katewra in Narela Zone. 3 Const. of culvert on main road opp. M.C. Pry. School, Bajitpur in 1,58,800/- 31.3.08 9.4.08 8.6.08 Completed. Narela Zone. 4 I/S of road from Ram Dev Chowk to Singhu Border. 1,95,506/- 28.3.08 6.4.08 5.7.08 Yet to start. SH: Imp. to intersection by pdg. Bitumen mastic in Narela C-1 in Narela Zone. 5 Const.of drain and providing CC in lane of Mukhtiyar Marg in 1,99,606/- 3.1.08 12.1.08 11.4.08 Work completed. village Majra Dabas in Narela Zone. 6 Improvement of Swatantar Nagar main road by pdg. RMC from 1,99,700/- 28.3.08 6.4.08 05.07.08 In progress. Gali No.21 to Narela Bawana Road C-1. 7 Construction of retaining wall near cremation ground in village 50,798/- 24.06.08 04.07.08 03.08.08 Completed. Bankner in C-2, (Remaining Work) 8 Improvement of road from Mundka Karala Road to Fauji Electrical 1,98,700/- 24.06.08 03.07.08 02.09.08 Work completed. in village Karala 9 Providing PVC Storage Tank & Misc. Work in Zonal office 1,08,555/- 08.07.08 18.07.08 17.08.08 Work in progress. Building, Narela. 10 Providing brick flooring from Sureha house to Plot to Canal in 1,40,689/- 21.8.08 30.8.08 29.10.08 Yet to start. Notice village Nangal Thakran. issued to the contractor. 11 Construction of 7 nos. class rooms, 1 computer room, 2 HM room, 1,96,041/- 19.9.08 28.9.08 27.10.08 In progress. 2 Stores, 2 Science rooms, 1 Hall and 4 Toilet Block in M.C. Pry. School, Narela Colony SH: Soil investigation & Consultancy Services. 12 Construction of 12 Nos. class rooms, 1 Computer room, 2 HM 1,94,070/- 19.9.08 28.9.08 27.10.08 In progress. rooms, 2 Stores, 2 Science rooms, 2 sports room and 4 Toilet Block in M.C. Pry. School, Pana Paposian. SH: Soil investigation & Consultancy Services. 13 Improvement of Lane by providing B/F from Drain to Balram 1,94,232/- 25.9.08 4.10.08 3.12.08 Completed. house in village Mungeshpur in Narela Zone. 14 Improvement of lane by providing B/F from Lakhi house to Prem 1,94,040/- 25.9.08 4.10.08 3.12.08 Completed Patwari house in village Mungeshpur C-28 15 Improvement of Lane by providing B/F from Main Road to 1,93,852/- 25.9.08 4.10.08 3.12.08 Completed. Randhir house in village Mungeshpur C-28 16 Consultancy services for design & drawing for const. of RCC Box 90,500/- 20.11.08 21.11.08 14.12.08 In progress. Type drain on Narela –Alipur road from Narela to Bawana escape phase-II (from Narela Complex Bhorgarh to Cremation ground).</p><p>MUNICIPAL CORPORATION OF DELHI OFFICE OF THE EX. ENGINEER (CWG)-VI ZONAL OFFICE BUILDING: NARELA DELHI-110040</p><p>STATUS OF VARIOUS PROJECTS UNDERTAKEN</p><p>2. Works costing more than 2 lac upto Rs. 10.00 lacs (As on 29.12.08).</p><p>S.No Name of the Project alongwith brief details Cost of the Date of award of Date of starting of Date of Present status Project/work work work completion of work 1 Construction of fire fighting tank in Zonal Office Building at 5,08,000/- 31.3.08 9.4.08 8.7.08 Completed. Narela. 2 Construction of 10 Nos. class rooms in M.C. Pry. School, A-6, 2,68,000/- 17.4.08 26.4.08 25.7.08 Work in progress. 90% Pocket-5, Narela. work completed. SH: Construction of static tank and pump house. 3 Construction of 5 Nos. class rooms in M.C. Pry. School, B- 2,68,000/- 17.4.08 26.4.08 25.7.08 Work in progress. 90% 4 Pocket-7, Narela. work completed. SH: Construction of static tank and pump house. 4 I/S of Ram Dev Chowk to G.T. Road in Narela Zone. 5,75,762/- 31.3.08 9.4.08 8.6.08 In progress (60%) SH: Imp. to intersection by mastic. 5 Stg. of T.B. Ward in PHC Narela C-1 in Narela Zone. 2,14,565/- 31.3.08 9.4.08 8.6.08 Completed. 6 Const.of drain and road from Suresh house to Mukhtiyar house 6,35,000/- 31.3.08 9.4.08 8.7.08 Completed. and Ishwar house to main road in village Punjab Khore. 7 Const.of Zonal Office Building at Narela in Narela Zone. 4,97,700/- 31.3.08 9.4.08 8.7.08 Completed. SH: Pdg. RMC in LHS compound. 8 Const. of drain on road from Bankner to Narela Bawana Road 7,01,436/- 4.2.08 13.2.08 12.6.08 70% completed. 210 Mtr. from RD-1200 to RD-1500 in C-2 in Narela Zone. drain completed. 9 Improvement of road berms by providing brick pavement along 2,85,938/- 6.12.07 15.12.07 14.2.08 Completed. Bankner to Bawana Road from Bankner Park to Rameshwar tubewell in C-2.</p><p>10 Improvement of road from Ghoga village & Daryapur, Ph-I 6,21,691/- 14.9.07 23.9.07 22.12.07 Completed. (From Ghoga to Air Force Station road by providing metalling and premixing. 11 Const. of drain on main road Swatantar Nagar from Narela 6,50,775/- 9.5.08 18.5.08 17.8.08 Yet to start. Bawana Road to Narela Lampur Road. SH: Pdg. mastic concrete over drain from Shiv Properties to Krishna Building Material in Swatantar Nagar. 12 Const. of drain on main road Swatantar Nagar from Narela 6,89,200/- 9.5.08 18.5.08 17.8.08 Completed. Bawana Road to Narela Lampur Road, Ph-I (From RD-1100 to RD-1490). SH: Pdg. mastic concrete over drain. 13 Const.of Zonal Office Building at Narela in Narela Zone 6,62,500/- 29.5.08 7.6.08 6.9.08 Completed. (Remaining work). SH: Pdg. RMC infront of compound. 14 Const.of drain on main road Swatantar Nagar from Narela 7,56,300/- 9.6.08 18.6.08 17.9.08 Yet to start. Bawan Road to Narela Alipur Road, Ph-I. SH: Pdg. mastic concrete over drain from Krishna Building Material Supplier to Bhola Jewelers in Swatantar Nagar. 16 Construction of drain from Police Booth to Hanuman Mandir in 6,56,700/- 24.06.08 04.07.08 03.10.08 Completed. Narela in Narela Zone. 17 Construction of drain from Dr. Deepak Bansal to Airtel Office in 6,66,900/- 08.07.08 18.07.08 17.10.08 Completed. C-1, Narela Zone. 18 Construction of Court Room in Zonal Office Building at Narela 6,50,033/- 11.07.08 21.07.08 20.10.08 In progress. (90%) in Narela Zone. 19 Construction of road by providing M/P from M.C. Pry. School to 4,94,000/- 29.07.08 07.08.08 06.12.08 Completed. Ved house in village Tatesar in Narela Zone. 20 Construction of road by providing RMC from Tara Singh house 4,85,100/- 29.07.08 07.08.08 06.12.08 Completed. to Rajinder Chhikara house in village Tatesar in Narela Zone. 21 Construction of road by providing RMC from Rajinder house to 4,62,905/- 29.07.08 07.08.08 06.12.08 Completed. M.S. Chhikara Field in village Jaunti in Narela Zone. 22 Improvement of road by providing C:C from Transformer to 4,66,167/- 29.07.08 07.08.08 06.12.08 Completed. Rajinder house in village Qutabgarh in Narela Zone. 23 Improvement of road from Roshan house to Jagdish house & 4,63,422/- 29.07.08 07.08.08 06.12.08 Completed. Side Lane by providing C:C in village Qutabgarh in Narela Zone. 24 Construction of road by providing M/P from Rambir house to 4,76,500/- 29.07.08 07.08.08 06.12.08 Completed. Jagbir house in village Majri in Narela Zone. 25 Construction of drain from Pond to Culvert in village Nangal 3,60,000/- 29.07.08 08.08.08 07.10.08 Completed. Thakran in Narela Zone. 26 Construction of drain along community Hall in village Bankner 5,35,800/- 29.07.08 08.08.08 07.12.08 Completed. in Narela Zone. 27 Construction of road by providing metalling premixing from 2,52,100/- 29.07.08 07.08.08 06.12.08 Completed. sach furniture to Partap house in village Majri in Narela Zone. 28 Providing metalling premixing of road from M.C. Pry. School to 4,94,500/- 29.07.08 07.08.08 06.12.08 Completed. Raj Singh house in village Kanjhwala in Narela Zone. 29 Construction of road by providing M/P from Mahabir house to 4,78,300/- 29.07.08 07.08.08 06.12.08 Completed. M.C. Pry. School in village Jaunti in Narela Zone. 30 Improvement of chowk near pond by providing RMC in village 4,99,300/- 6.8.08 15.8.08 14.10.08 Completed. Qutabgarh in C-28 Narela Zone. 31 Construction of polyclinic at village Kanjhawala in Narela Zone. 2,12,298/- 18.8.08 27.8.08 26.9.08 Completed. SH: Engaging 1 no. JCB with 2 truck for 30 days. 32 Construction of road by providing M/P from Mandu Mandir to 8,65,000/- 21.8.08 30.8.08 20.11.08 Being dispute of Sultanpur Road in village Karala in Narela Zone. demarcations heldup. 33 Providing CC and construction of drain in lanes Dhare & 3,83,865/- 22.8.08 1.9.08 30.11.08 Completed. Rohtash in village Nangal Thakran in Narela Zone. 34 Providing CC and construction of drain in lanes Takchand and 3,24,998/- 22.8.08 1.9.08 30.11.08 Completed. Ram kumar in village Nangal Thakran C-28. 35 Development of lanes Prem Chand, Rampal, Sukhbir, Dharm, 3,14,742/- 22.8.08 1.9.08 30.11.08 Site to be changed. Ishwar, Mange and Sher Singh by providing CC and drain in village Katewra in Narela Zone. 36 Development of road/lane by providing RMC Ajit, Ram 4,53,960/- 22.8.08 1.9.08 30.11.08 In progress. (75%) Chander, Anil and Jagdish in village Chandpur in Narela Zone. 37 Providing CC and drain in lanes Jahib and Anup in village 2,46,994/- 22.8.08 1.9.08 30.11.08 Completed. Dariyapur (C-28). 38 Improvement of side berms by providing RMC from 4,42,444/- 22.8.08 1.9.08 30.11.08 Completed. Transformeer to Bhushan house and lane Ramphal in village Dariyapur in Narela Zone. 39 Providing CC and Construction of drain in lanes Jaswant house 3,96,183/- 22.8.08 1.9.08 30.11.08 Yet to start. Notice issued to Raj house and Rajj, Joginder, Ramphal Ajit in village to the contractor. Mungeshpur. 40 Development of lanes Rajvir, Ram Chander, Naresh, Nanak and 4,19,919/- 22.8.08 1.9.08 30.11.08 In progress (75%) Rambir by providing CC and drain in village Katewra.</p><p>41 Providing CC and Construction of drain in lanes Delip, Hawa 2,95,314/- 22.08.08 1.9.08 30.11.08 In progress (75%) Singh, Ramphal and Jai Chand in village Mungeshpur in Narela Zone. 42 Consultancy services for design of drawing for installation of 6,40,000/- 1.9.08 10.9.08 9.1.09 In progress. ETP at Ghoga Dairy Colony, Phase-I. 43 Providing CC and Construction of drain from Main Road to 4,19,985/- 3.9.08 12.9.08 11.12.08 In progress (75%) Rajesh house in village Mungeshpur. 44 Providing CC and Construction of drain in lanes Bajit, Rajinder, 4,00,019/- 5.9.08 14.9.08 13.12.08 Yet to start. Notice issued Jite and Ramphal in village Dariyapur. to the contractor. 45 Providing brick flooring in lanes Sripal, Jaipal, Bhim and Nasib 3,33,920/- 5.9.08 14.9.08 13.11.08 In progress. (90%) in village Sultanpur Dabas. 46 Providing CC from Dayanand Dharmashala to Sat Narain house 2,01,246/- 5.9.08 14.9.08 13.12.08 Completed. in village Pooth Khurd. 47 Construction of outfall drain (remaining portion) from Road 6,35,674/- 5.9.08 14.9.08 13.01.09 Completed. No.3 to FCD drain village Punjab Khore in Narela Zone. 48 Development of Dairy Colony at Ghoga in Narela Zone. SH: 5,22,864/- 10.9.08 19.9.08 18.3.09 In progress. Engaging 24 nos. Guards for watch and ward for 6 months. 49 Construction of road by providing RMC from Parkash house to 4,32,900/- 15.9.08 24.9.08 23.01.09 Completed. Anup Singh House in village Majri. 50 Improvement of Palla Bakhtawarpur road by Patch repair from 3,43,400/- 15.9.08 24.9.08 23.10.08 Completed. G.T. Road to Subhash Chowk (C-4) 51 Providing brick flooring in lanes, Tarief, Lekh Ram & 3,20,726/- 25.9.08 4.10.08 3.12.08 Completed. Rameshwar in village Sultanpur Dabas in C-28. 52 Providing RMC and drain from Main Road to FCD drain in 8,93,000/- 6.10.08 15.10.08 14.1.09 In progress. (80%) village Mungeshpur in C-28, Narela Zone. 53 Providing premixing on Phirni Road (Barwala side) towards 4,96,700/- 29.10.08 8.11.08 7.01.09 Completed. DSIDC (RD-0 to RD-500) in village Pooth Khurd in Narela Zone. 54 I/S of road from Kanjhawala to Prem Piao in Narela Zone. SH: 4,91,485/- 29.10.08 8.11.08 7.01.09 Completed. Imp. of damaged portion between Prem Piao to Chandpur. 55 Improvement of lane by providing RMC from main Alipur Road 4,94,100/- 10.12.08 19.12.08 18.3.09 In progress.(2%) to Master Shyam House in Alipur Village in C-3 56 Construction of drain along Phirni Road from Anil House to FC 4,35,700/- 10.12.08 19.12.08 18.3.09 In progress.(5%) drain No.6 in village Singhu in C-4. 57 Construction of outfall drain (remaining portion) from Pond to 7,58,033/- 11.12.08 20.12.08 19.4.09 In progress.(5%) FC drain in village Bajitpur. 58 Improvement of drain & Xing from Allahabad Bank to Farm 4,61,400/- 19.12.08 28.12.08 27.3.09 In progress. (10%) Road in Alipur in Narela Zone. 59 Improvement of lane by providing RMC from Ashok House to 4,79,800/- 19.12.08 28.12.08 27.3.09 In progress. (5%) Dharambir House in Alipur village in C-3 60 Improvement of lane by providing RMC from Farm Road to 3,35,800/- 24.12.08 2.1.09 1.3.09 In progress. (2%) drain in Alipur village in C-3</p><p>MUNICIPAL CORPORATION OF DELHI OFFICE OF THE EX. ENGINEER (CWG)-VI ZONAL OFFICE BUILDING: NARELA DELHI-110040</p><p>STATUS OF VARIOUS PROJECTS UNDERTAKEN</p><p>3. Works costing above Rs.10.00 lacs (As on 29.12.08).</p><p>S.No Name of the Project alongwith brief details Cost of the Date of award of Date of starting of Date of Present status Project/work work work completion of work 1 Construction of road by providing RMC from culvert towards 19,94,000/- 17.4.08 26.4.08 25.8.08 Completed. M.C. Pry. School, Karala in Narela Zone. 2 I/S of road from Lampur Road to Bawana Road Y-Point on main 23,50,000/- 1.5.08 10.5.08 9.8.08 Completed. road, Narela 3 Construction of drain and approach road from main road to school 15,46,00/- 31.3.08 9.4.08 8.7.08 In progress. in village Pooth Khurd in Narela Zone. 4 I/S of road from Road No.3 (From Kanjhawala Chowk to Jaunti 39,38,257/- 27.2.08 7.3.08 6.8.08 Completed. village) in Narela Zone. SH: Construction of drain. 5 I/S of road from Jaunti to FC drain Punjab Khore, Phase-II. 16,97,165/- 22.2.08 2.3.08 1.7.08 Completed. SH: Construction of drain. 6 I/S of road from Khera Kalan via Khera Khurd, Naya Bans & 1,16,02,181/- 30.1.08 9.2.08 8.8.08 Completed. Holambi Khurd, Ph-I (From Khera Kalan Railway Xing to Holambi Khurd in Narela Zone. SH: Stg. of carriageway. (BM & AC) 7 Construction of 13 Nos. class rooms, 1 computer rooms, 1 HM 1,21,79,875/- 30.1.08 9.2.08 8.8.09 Work in progress 80% work room, 1 store, 1 library, 1 sports room, three toilet blocks and one completed. Structural work English toilet block i/c demolition of old existing structure in M.C. completed. Pry. School, Kureni in Narela Zone.</p><p>8 Construction of Polyclinic at village Kanjhawala in Narela Zone. 2,05,37,305/- 28.1.08 6.2.08 5.6.09 Work in progress (7%). Initial delay due to change in layout plan to avoid tree cutting. Dismantling of old structure complete. 9 Construction of Polyclinic at village Karala in Narela Zone. 1,81,20,261/- 16.1.08 25.1.08 24.7.09 75% work completed. 10 I/S of road from Pooth Khurd to Prem Piao via village Sultanpur 37,71,814/- 30.11.07 9.12.07 8.3.08 Work completed. Dabas in Narela Zone. SH: Const. of drain and improvement of road by RMC. 11 C/o out fall drain from Durga Hardware shop upto outfall at FCD 65,04,012/- 22.2.07 3.3.07 2.7.08 Work completed. in village Pooth Khurd. 12 I/S of Road No.3, Ph-I from Auchandi Border to Qutabgarh in 1,92,22,600/- 28.11.07 6.12.07 7.6.08 Completed. Narela Zone. SH: Stg. of carriageway. 13 I/S of road from Daryapur crossing to Kanjhawala Auchandi Road 1,26,03,400/- 28.11.07 6.12.07 7.4.08 Completed. (Road No.3) via Nangal Thakran, Bajitpur & Katewra in Narela Zone. SH: Stg. of carriageway. 14 I/S of road from Khera Kalan to Holambi Kalan via Khera Khurd, 1,70,81,720/- 18.9.07 27.9.07 26.9.08 84% work completed. Delay Naya Bans, Holambi Khurd, Ph-I (From Khera Kalan Railway in execution due to late Xing to Holambi Khurd) in Narela Zone. receipt of design. SH: Construction of drain. 15 Construction of existing damaged outfall drain from village Nangal 1,25,06,000/- 6.9.07 15.9.07 14.6.08 Work completed. Thakran to FCD drain of village Nangal Thakran in Narela Zone. 16 Widening of road from Madanpur turning to Kirari Railway Xing. 1,38,82,725/- 9.7.07 18.7.07 17.7.08 Initial delay of 4 months due SH: Construction of drain. to late receipt of design from DEMS and later on due to slow progress by the contractor. Penalty imposed on the contractor due to slow progress and show cause notice under clause-3 issued.</p><p>17 Construction of outfall drain from M.C. Pry. School to culvert at 70,67,000/- 29.5.07 7.6.07 6.12.07 95% work completed. Work FCD at Auchandi Border of village Auchandi. held up due to permission from Haryana Irrigation Deptt. to crash the drain canal. 18 I/S of Narela Bawana Road from Ghoga Sanoth Xing to Railway 33,36,725/- 29.5.07 7.6.07 6.11.07 Completed Xing, Ph-II. SH: Construction of drain.</p><p>19 Construcstion of 45 Nos. of class rooms, 2 offices, 2 stores, 2 toilet 2,10,47,000/- 24.5.07 2.6.07 1.10.08 96% Completed. blocks in M.C. Pry. School, Nithari. 20 Raising of boundary wall and development of ground in M.C. Pry. 13,92,736/- 16.4.07 25.4.07 24.8.07 Finishing of B/wall in School, Alipur Garhi in Narela Zone. progress. (75%) 21 Const. of Phirni Road, Ph-I by pdg. WMM from Shivam Properties 98,46,000/- 2.1.06 11.1.06 10.1.07 Case closed being under at Auchandi road to M.C. Store in village Pooth Khurd head of A/c XL-VIII-E. (GSB, WMM and premixing.)</p><p>22 Const. of 6 Nos. class rooms, 1 store, 1 office, 1 science rooms, 1 46,34,000/- 26.7.06 4.8.06 3.7.07 Completed. library and toilet block in M.C. Pry. School, Qutabgarh (Girls) in Narela Zone. 23 Construction of Polyclinic at Bawana in Narela Zone. 1,41,42,000/- 10.6.05 19.6.05 18.12.06 Structure complete. Plaster and flooring in progress. 24 I/S of road from Nizampur to Bahadurgarh Border in Narela Zone. 36,52,000/- 12.6.08 21.6.08 19.9.08 In progress. 70% completed. SH: Stg. of carriageway. 25 I/S of road from village Pooth Khurd to Prem Piao via village 88,06,000/- 26.8.08 3.9.08 2.3.09 In progress (50%) Sultanpur Dabas in Narela Zone. 26 I/S of Narela Alipur Road from M.C.Pry. School to Holambi Kalan 1,12,05,000/- 27.8.08 6.9.08 5.2.09 In progress (80%). turning in C-3 27 Construction of 7 Nos. class rooms, 1 computer room, 2 HM 1,64,52,264/- 1.9.08 10.9.08 9.12.09 Demolition work Completed. rooms, 2 Science rooms, 1 Hall and 4 Toilet Block in M.C. Pry. School Narela Colony in C-1</p><p>28 Construction of 12 Nos. class rooms, 1 computer room, 2 HM 1,61,50,002/- 1.9.08 10.9.08 9.12.08 Demolition work Completed. room, 2 Stores, 2 Science rooms, 2 Sports room, and 4 Toilet Block in M.C. Pry. School, Pana Paposian in C-1 i/c demolition of old existing structure. </p><p>29 Construction of Storm water drain on Narela Alipur Road from 1,81,26,209/- 1.9.08 10.9.08 9.6.08 In progress. (20%) Narela to Bawana escape, Ph-II (From DSIDC complex Bhorgarh to cremation ground) in C-2</p><p>30 Construction of drain from Divya Jyoti Centre to Culvert and 31,52,000/- 5.9.08 14.9.08 13.12.08 Drain work in progress providing RMC on road berms of Road No.3 near Jatkhore in (20% complete) Narela Zone.C-27</p><p>31 Construction of Mundka Karala Road from Road No.3 to Shanti 37,30,500/- 19.9.08 28.9.08 27.3.09 In progress (50%) Service Station in C-29 in Narela Zone.</p><p>32 Construction of road by providing RMC from Sultanpur Road to 1,25,28,000/- 22.9.08 1.10.08 1.2.09 In progress (60% complete) Culvert and Polyclinic to Sr. Sec. School in village Karala in C-29</p><p>33 I/S of Ram Dev Chowk to G.T. Road in Narela Zone. SH: 14,28,600/- 30.9.08 9.10.08 8.1.09 In progress. (60%) Improvement of side berms.</p><p>34 I/S of road from Prem Piao to village Majra Dabas in Narela Zone. 98,97,520/- 30.9.08 9.10.08 8.2.09 Completed.</p><p>35 Stg. of carriageway from Bawana Auchandi Road to Border in 42,73,873/- 30.9.08 9.10.08 8.2.09 Completed. village Harewali in Narela Zone. 36 Stg. of carriageway from Road No.3 to Sohti (Haryana Border) in 47,41,500/- 30.9.08 9.10.08 8.2.09 Yet to start. Narela Zone.</p><p>37 I/S of Road from Narela Alipur Road to Holambi Kalan in Narela 59,73,654/- 30.9.08 9.10.08 8.2.09 In progress (50%) Zone. 38 Improvement of road by providing RMC and Construction of 24,94,000/- 6.10.08 15.10.08 14.2.09 Completed. Drain from Jagbir house to Chopal in village Qutabgarh in Narela Zone.</p><p>39 Construction of outfall drain (remaining portion) from Phirni Road 16,44,000/- 13.10.08 22.10.08 21.2.09 In progress (15%) to Culvert in village Pooth Khurd.</p><p>40 Construction of 7 Nos. Class rooms, 1 computer room, 1 HM 1,20,28,804/- 30.10.08 9.11.08 8.9.09 Yet to start. room, 1 Sports room, 1 Science room & 4 Toilet Blocks in M.C.Pry. School, Singhu. </p><p>41 I/S of roads in Narela Zone. (i) Stg. of Narela Alipur Road from 1,24,54,655/- 19.11.08 28.11.08 27.4.09 Yet to start. Letter sent to DDA office to Y-Point & upto Railway Xing in Narela Zone. CRRI for party checking (ii) Stg. of Ram Dev Marg from Ram Dev Chowk to DDA Flats. 42 Strengthening of Road from village Bawana to Dariyapur in Narela 1,64,93,240/- 19.11.08 28.11.08 27.5.09 Yet to Start. Zone. 43 Construction of outfall drain from Ram Dev Chowk to Flood drain 1,40,60,000/- 25.11.08 4.12.08 3.8.09 Yet to Start. Letter sent to on Kanya Gurukul Road in Mamurpur Village in C-1. NCCBM for design mix.</p><p>E.E.(CWG)-VI</p><p>E.E.(CWG)-VI E.E.(CWG)-VI</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-