Fume Extraction Scrubber System

Fume Extraction Scrubber System

<p> Products & Services: Envergy Projects Ltd. . STP & ETP-Turnkey Projects . Biogas Turnkey Projects Turnkey Solutions in Environment & Energy . Mini Wind Mill . Waste to Energy . Vermicomposting . Organic Waste Converter . Solar Dryers/Ovens VAT TIN NO: 27820671513 V / CST TIN NO: 27820671513 C . Solar UPS & Lighting . Rain Water Harvesting (RWH)</p><p>Doc. No.: EPL/ V/ STC/02</p><p>Rev. No.: 00 Questionnaire For Boiler Exhaust Effective Date: 01/01/2009</p><p>Page No.: Page 1 of 2</p><p>A General Information Detail Details 1 Representative Name 2. Address 3. Contact</p><p>B Boiler Description Details 1 Boiler Make and Modal detail 2. Btu/Hr Input / BHP / PPH Steam</p><p>C Boiler/Burner/Water Flow System Details 1 Steam Boiler Operating Pressure 2. Burner Type 3. Existing Boiler Feed System Type (If Steam boiler)</p><p>D Heat Sinks Details Details 1 Boiler feed water 2. Boiler makeup water 3. Hot water return loop 4. Process water 5. Potable water 6. Swimming pool water E Exhaust Stack Description Details 1 Vertical/Horizontal gas flow direction 2. Economizer Space Limitations 3. Stack Size</p><p>F Fuel Details Details 1 Type of Fuel Burned 2. Flow rate 3. Pressure 4. If any Standby Burner it’s type 5. Flow rate and Pressure</p><p>G Exhaust Gas Flow Entering Details Details 1 Max. Pressure drop @ 100% load 2. Temperature 3. Flow rate of flue gas 4. Desired outlet Temperature 5. O2 % Content 6. CO2 % Content 7. Excess Air % Content 8. Thermal Efficiency % 9. Load % of input 10. Hours of operation Per Load</p><p>H Liquid Flow Entering Details 1 Max. Pressure drop @ 100% load 2. Temperature 3. Flow rate 4. Desired outlet temperature</p><p>I Liquid Flow Entering Details 1 Max. Pressure drop @ 100% load 2. Temperature</p><p>J Desired Btu/Hr Recovery: ______</p><p>Note: The above information shall be used only for preparation of our proposal & not for any other purpose. Please forward this questionnaire duly completed to:</p><p>Envergy Projects Ltd. Turnkey Solutions in Environment & Energy For any further information/clarification,</p><p>Phone – 0265 – 2358018 / 2358037 (R&D Baroda) Email: [email protected] / [email protected] / [email protected]</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us