<p>ERCOT TECHNICAL ADVISORY COMMITTEE (TAC) MEETING ERCOT Met Center / 7620 Metro Center Drive, Austin, Texas 78744 December 1, 2016 / 9:30 a.m. – 12:00 p.m. http://ercot.webex.com Meeting Number: 628 110 549 Meeting Password: TAC Audio Dial-In: 1.877.668.4493</p><p>1. Antitrust Admonition A. Brandt 9:30 a.m. 2. Approval of TAC Meeting Minutes (Vote) A. Brandt 9:35 a.m. October 27, 2016 3. Protocol Revision Subcommittee Report A. Frazier 9:40 a.m. Confirmation of 2016 PRS Chair/Vice Chair (Vote) Revision Requests for Consideration (Vote): NPRR792, Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) NPRR803, Remove Grey-boxed Language from NPRR439, Updating a Counter-Party’s Available Credit Limit for Current Day DAM Other Binding Document List 4. Revision Request Previously Tabled by TAC (Possible Vote) A. Brandt 10:00 a.m. NPRR773, Broadening Scope of Acceptable Letter of Credit Issuers PGRR051, Alignment with NPRR792, Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) NOGRR164, Alignment with NPRR792, Removing Special Protection System (SPS) and adding Remedial Action Scheme (RAS) – URGENT Appeal of NOGRR149, Revision to Definition of Transmission G. Nunan/T. Operator Anson</p><p>5. Reliability and Operations Subcommittee Report A. Bern 10:20 a.m. NOGRR162, Process for Resolving Real-Time Data Discrepancies (Vote) PGRR042, Regional Transmission Plan Model Reserve Requirement and Load-Generation Imbalance Methodology (Vote) 6. Wholesale Market Subcommittee Report J. Carpenter 10:40 a.m. SMOGRR018, EPS Metering for Three-Wire Wye Configurations (Vote) SMOGRR019, Clarifications and Updates to Paralleling Current Transformers, Instrument Transfer Name Plate Photos and Loss Potential Event Logging Requirements (Vote) 2016 CRR Activity Calendar (Vote) Market Continuity Updates to TAC 7. Commercial Operations Subcommittee Report M. Trenary 11:00 a.m. Confirmation of 2016 COPS Vice Chair (Vote) COPMGRR044, Alignment with NPRR794, Relocation of </p><p>1 Unregistered DG Reporting Requirements (Vote)</p><p>8. Retail Market Subcommittee Report K. Scott 11:20 a.m. Market Continuity Updates to TAC</p><p>9. ERCOT Operations, Planning, and IT Report 11:40 a.m. DAM Make-Whole Calculation Issue M. Ruane</p><p>10. Other Business A. Brandt 11:50 a.m.</p><p>Adjourn 12:00 p.m.</p><p>Future TAC Meetings Possible TAC Email Votes January 28, 2017 February 23, 2017</p><p>Open Action Items from Previous Meeting(s) Responsible Party</p><p> 2/27/14 – Review Operating Procedure that ERCOT uses to determine when ERCOT they need RUC (specifically RUC for bad weather) 4/24/14 – Evaluate concerns with bringing RUC units earlier than required ROS/WMS because of start-up failures 5/29/14 – Review post NPRR589 SASM Performance ERCOT 9/25/14 – Voltage Reduction – assess cost issues and applicability to loads as ROS/WMS well as market impacts 12/18/14 – Consider alternative implementation options for automation of WMS NPRR664, Fuel Index Price for Resource Definition and Real-Time Make- Whole Payments for Exceptional Fuel Cost Events. (Report back to TAC in March 2015) 1/28/16 – Annual RUC Reporting – report on market impact component of ERCOT RUC. Appeal of NOGRR149, Revision to Definition of Transmission Operator – Tabled TAC until December 1, 2016 TAC meeting.</p><p>2</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-