Individual Aviator Training Checklist

Individual Aviator Training Checklist

<p> ANNEX G</p><p>INDIVIDUAL AVIATOR TRAINING CHECKLIST LOCAL ORIENTATION BRIEFING ______</p><p>Name______Rank______SSN______</p><p>A. Initial Briefing: Date Completed:______IP Initials:______1. ATM Records Review. ______2. Flight Records Review. (within 14 Days) ______3. Initial RL Classification. (if more than 180 Days – (Rl3) ______4. Reading File. ______5. Aircrew Show time. ______6. Flight Scheduling Procedures. ______7. Medical Up Slip 4186. ______8. Unit ALSE. ______9. Altitude Chamber Currency. ______10. SOP’s (AASF, OSACOM, DET45) ______11. Force Protection ______12. OPSEC/EEFI ______13. Secret (or as required) Clearance Requirements (personal responsibility and actions, see DET 45 SOP)</p><p>B. Airfield Operations And Procedures: Date Completed:______IP Initials:______1. Airfield SOP/Regulations. ______2. Flight Planning Facilities. ______3. Flight Planning Aids. ______4. Base/Airfield Operations. ______5. Flight Kitchen. ______6. Passenger Waiting Area. ______7. Weather Facilities. 8. Procedures For: ______A. Obtaining NOTAMs. ______B. Obtaining Maps, Charts, And DOD Flip. ______C. Filing Local And Cross Country Flight Plans. ______D. Ensuring Operations Security Of The Airfield. ______E. Obtaining Security Of The Airfield. ______F. Obtaining Weather Information. ______G. Authorizing Flights Outside The Local Flying Area. ______H. Review of VFR And Special VFR Requirements. ______I. Review of IFR/Instrument Recovery Procedures.</p><p>C. Review of the Local Area Map: Date Completed:______IP Initials:______1. Navaids ______2. Boundaries. ______3. Flight Corridors. ______4. Reporting Points. ______5. Airfield Security. ______6. Tactical Training Area. ______7. Noise Abatement Area. ______8. Prominent Terrain Features. ______9. Maintenance Test Flight Area.</p><p>A-G-1 ______10. Obstacles Or Hazards To Flight. ______11. Restricted Areas And No Fly Areas. ______12. Airfields, Helipads, And Frequently Used Lz’s.</p><p>D. Airfield Layout and Facilities: Date Completed:______IP Initials:______</p><p>______1. Ramp and Taxi Procedures. ______2. Aircraft Parking Areas. ______3. Crash Rescue Facilities. ______4. Wash Rack Operations. ______5. Passenger Loading Area. ______6. Obstacles or Hazards To Flight. ______7. Navaids and Control Facilities. ______8. Classroom and Computer Training. ______9. Organizational and Support Maintenance Areas. ______10. Facilities for POL Products.</p><p>E. Initial Environmental Factor Training: Date Completed:______IP Initials:______1. Cold Weather Operations. ______2. Desert and High Density Altitude Operations. ______3. Turbulence Operations. ______4. Thunderstorm Operations. ______5. Night Operations. ______6. Jungle Operations. ______7. Mountainous and High Altitude Operations.</p><p>F. Initial Flight Orientation: Date Completed:______IP Initials:______1. Departure Procedures. ______2. Local Flight Plans. ______3. TOLD Card Requirements. ______4. DD175-1. ______5. Local Area Flight Orientation. ______6. Traffic Pattern. ______7. Reporting Points. ______8. Restricted Areas And No Fly Areas. ______9. Filing Procedures. ______10. Crew Responsibilities during Training. ______11. Obstacles or Hazards to Flight (HIRTA). ______12. Mission Briefing Procedures. ______13. Noise Abatement Procedures & Quiet Hours. ______14. Local Airspace. ______15. Navaids. ______16. Boundaries. ______17. Flight Corridors. ______18. Tactical Training Areas. ______19. Prominent Terrain Features. ______20. Maintenance Test Flight Areas. ______21. Instrument Recovery Procedures. ______22. Local Airfields. ______23. ASE</p><p>G. After Mission Requirements: Date Completed:______IP Initials:______1. Mission Sheet, Debriefings, And Gradeslip Requirements. ______2. Unit Aircraft Movement (Ground Handling) Procedures.</p><p>H. Rl 1 Designation Briefing: Date Completed:______IP Initials:______</p><p>A-G-2 ______1. Commander’s Task List. ______2. Annual Training Certification. ______3. Semi-Annual Training Program. ______4. No-Notice Evaluation Program. ______5. APART Requirements. (must be met in the last 12 months) ______6. PC Progression. ______7. Commanders Eval. (within 45 Days)</p><p>Aviator’s Signature and Date of Completion:</p><p>______Date:______Instructor’s Signature and Date of Completion:</p><p>______Date:______</p><p>A-G-3 THIS PAGE INTENTIONALLY LEFT BLANK</p><p>A-G-4</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us