Division 100 General Requirements

Division 100 General Requirements

<p> 03USC01/28/13</p><p>ATTENTION</p><p>The following Special Contract Requirements (SCRs) are only a portion of the specifications for this project. These SCRs amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03. The FP-03 U.S. Customary Units is a separately published book. In order to understand the solicitation properly you need to have the FP-03 U.S. Customary Units as well as this packet. Pay particular attention to the provisions of Subsection 104.04 in the FP-03. This Subsection explains how each of the many contract documents fit together. If you would like to view the FP-03 U.S. Customary Units electronically, go to: https://flh.fhwa.dot.gov/resources/specs/fp-03/</p><p>If you would like a printed copy of the FP-03 U.S. Customary Units, contact the:</p><p>Contracts Section Federal Highway Administration Western Federal Lands Highway Division 610 East Fifth Street Vancouver, WA 98661 Phone: 360-619-7520 Fax: 360-619-7932 E-mail: [email protected] (printed copies of the FP-03 will be distributed to the successful bidder)</p><p>SCRs Table of Contents Project: [INSERT Project number, name] SCRs TABLE OF CONTENTS</p><p>SPECIAL CONTRACT REQUIREMENTS (SCRs) The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) U.S. Customary Version, U.S. Department of Transportation, Federal Highway Administration.</p><p>DIVISION 100 GENERAL REQUIREMENTS Section 101 Terms, Format, and Definitions...... E- Section 102 Bid, Award, and Execution of Contract...... E- Section 103 Scope of Work...... E- Section 104 Control of Work...... E- Section 105 Control of Material...... E- Section 106 Acceptance of Work...... E- Section 107 Legal Relations and Responsibility to the Public...... E- Section 108 Prosecution and Progress...... E- Section 109 Measurement and Payment...... E-</p><p>DIVISION 150 PROJECT REQUIREMENTS Section 151 Mobilization...... E- Section 152 Construction Survey and Staking...... E- Section 153 Contractor Quality Control and Assurance...... E- Section 154 Contractor Sampling and Testing...... E- Section 155 Schedules for Construction Contracts...... E- Section 156 Public Traffic...... E- Section 157 Soil Erosion Control...... E- Section 158 Watering for Dust Control...... E-</p><p>DIVISION 200 EARTHWORK Section 201 Clearing and Grubbing...... F- Section 202 Additional Clearing and Grubbing...... F- Section 203 Removal of Structures and Obstructions...... F- Section 204 Excavation and Embankment...... F- Section 205 Rock Blasting...... F- Section 206 Reserved Section 207 Earthwork Geotextiles...... F- Section 208 Structure Excavation and Backfill for Selected Major Structures...... F- Section 209 Structure Excavation and Backfill...... F- Section 210 Permeable Backfill...... F- Section 211 Roadway Obliteration...... F- Section 212 Linear Grading...... F- Section 213 Subgrade Stabilization...... F-</p><p>SCRs Table of Contents Project: [INSERT Project number, name] DIVISION 250 STRUCTURAL EMBANKMENTS Section 251 Riprap...... F- Section 252 Special Rock Embankment and Rock Buttress...... F- Section 253 Gabions and Revet Mattresses...... F- Section 254 Crib Walls...... F- Section 255 Mechanically Stabilized Earth Walls...... F- Section 256 Permanent Ground Anchors...... F- Section 257 Alternate Retaining Walls...... F- Section 258 Reinforced Concrete Retaining Walls...... F- Section 259 Soil Nail Retaining Walls...... F- Section 260 Rock Bolts...... F- Section 261 Rock Dowels...... F-</p><p>DIVISION 300 AGGREGATE COURSES Section 301 Untreated Aggregate Courses...... F- Section 302 Treated Aggregate Courses...... F- Section 303 Road Reconditioning...... F- Section 304 Aggregate Stabilization...... F- Section 305 Aggregate-Topsoil Course...... F- Section 306 Dust Palliative...... F- Section 307 Reserved Section 308 Minor Crushed Aggregate...... F- Section 309 Emulsified Asphalt Treated Base Course...... F-</p><p>DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS Section 401 Asphalt Concrete Pavement By Gyratory Mix Design Method...... F- Section 402 Hot Asphalt Concrete Pavement By Hveem or Marshall Mix Design Method...... F- Section 403 Hot Recycled Asphalt Concrete Pavement ...... F- Section 404 Minor Hot Asphalt Concrete...... F- Section 405 Open-Graded Asphalt Friction Course...... F- Section 406 Reserved Section 407 Reserved Section 408 Cold Recycled Asphalt Base Course...... F- Section 409 Asphalt Surface Treatment...... F- Section 410 Slurry Seal...... F- Section 411 Asphalt Prime Coat...... F- Section 412 Asphalt Tack Coat...... F- Section 413 Asphalt Pavement Milling...... F- Section 414 Asphalt Pavement Crack and Joint Sealing...... F- Section 415 Paving Geotextiles...... F- Section 416 Continuous Cold Recycled Asphalt Base Course...... F- Section 417 Minor Cold Asphalt Mix...... F-</p><p>SCRs Table of Contents Project: [INSERT Project number, name] DIVISION 500 RIGID PAVEMENTS Section 501 Rigid Pavement...... F- Section 502 Rigid Pavement Restoration...... F-</p><p>DIVISION 550 BRIDGE CONSTRUCTION Section 551 Driven Piles...... F- Section 552 Structural Concrete...... F- Section 553 Prestressed Concrete...... F- Section 554 Reinforcing Steel...... F- Section 555 Steel Structures...... F- Section 556 Bridge Railing...... F- Section 557 Timber Structures...... F- Section 558 Dampproofing...... F- Section 559 Waterproofing...... F- Section 560 Removal of Concrete by Hydrodemolition...... F- Section 561 Reserved Section 562 Temporary Works...... F- Section 563 Painting...... F- Section 564 Bearing Devices...... F- Section 565 Drilled Shafts...... F- Section 566 Shotcrete...... F-</p><p>DIVISION 600 INCIDENTAL CONSTRUCTION Section 601 Minor Concrete Structures...... F- Section 602 Culverts and Drains...... F- Section 603 Structural Plate Structures...... F- Section 604 Manholes, Inlets, and Catch Basins...... F- Section 605 Underdrains, Sheet Drains, and Pavement Edge Drains...... F- Section 606 Corrugated Metal Spillways...... F- Section 607 Cleaning, Reconditioning, and Repairing Existing Drainage Structures...... F- Section 608 Paved Waterways...... F- Section 609 Curb and Gutter...... F- Section 610 Horizontal Drains...... F- Section 611 Water Systems...... F- Section 612 Sanitary Sewer Systems...... F- Section 613 Simulated Stone Masonry Surface...... F- Section 614 Lean Concrete Backfill...... F- Section 615 Sidewalks, Drive Pads, and Paved Medians...... F- Section 616 Slope Paving...... F- Section 617 Guardrail...... F- Section 618 Concrete Barriers and Precast Guardwalls...... F- Section 619 Fences, Gates, and Cattle Guards...... F- Section 620 Stone Masonry...... F- Section 621 Monuments and Markers...... F-</p><p>SCRs Table of Contents Project: [INSERT Project number, name] Section 622 Rental Equipment...... F- Section 623 General Labor...... F- Section 624 Topsoil...... F- Section 625 Turf Establishment...... F- Section 626 Plants, Trees, Shrubs, Vines, and Groundcovers...... F- Section 627 Sod...... F- Section 628 Sprigging...... F- Section 629 Rolled Erosion Control Products and Cellular Confinement Systems ...... F- Section 630 Reserved Section 631 Reserved Section 632 Reserved Section 633 Permanent Traffic Control...... F- Section 634 Permanent Pavement Markings...... F- Section 635 Temporary Traffic Control...... F- Section 636 Signal, Lighting, and Electrical Systems...... F- Section 637 Facilities and Services...... F-</p><p>DIVISION 700 MATERIAL Section 701 Cement...... G- Section 702 Asphalt Material...... G- Section 703 Aggregate...... G- Section 704 Soil...... G- Section 705 Rock...... G- Section 706 Concrete and Plastic Pipe...... G- Section 707 Metal Pipe...... G- Section 708 Paint...... G- Section 709 Reinforcing Steel and Wire Rope...... G- Section 710 Fence and Guardrail...... G- Section 711 Concrete Curing Material and Admixtures...... G- Section 712 Joint Material...... G- Section 713 Roadside Improvement Material...... G- Section 714 Geotextile and Geocomposite Drain Material...... G- Section 715 Piling...... G- Section 716 Material for Timber Structures...... G- Section 717 Structural Metal...... G- Section 718 Traffic Signing and Marking Material...... G- Section 719 Reserved Section 720 Structural Wall and Stabilized Embankment Material...... G- Section 721 Electrical and Illumination Material...... G- Section 722 Anchor Material...... G- Section 723 Reserved Section 724 Reserved Section 725 Miscellaneous Material...... G-</p><p>SCRs Table of Contents Project: [INSERT Project number, name]</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us