Natural Resource Project Inventory (NRPI) s10

Natural Resource Project Inventory (NRPI) s10

<p> Last Updated 06/03/18 CONTRACT SUMMARY This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below).</p><p>Use the "tab" and arrow keys to move through the form. If field is not applicable, please put N/A in block. Date filled out: 6/10/04 </p><p>A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type. 1. Contract Number: 03-169-559-0 2. Project Title: Restoration and Recharge in the San Diego River Park: A Demonstration Project 3. Project Purpose – Problem: (problem being addressed) Surface Water Quality 4. Project Goals: a. Short-term Goals: Create a constructed wetland for surface water treatment. b. Long-term Goals: To provide the Riverview Water District with a better quality of water in their well field. 5. Project Location: (lat/longs, watershed, etc.) San Diego River in Lakeside - N 32° 51' 22 W 116° 56' 24 a. Physical Size of Project: (miles, acres, sq. ft., etc.) 5 acres b. Counties included in the project: San Diego c. Legislative Districts: (Assembly and Senate) Senate District 36, Assembly District 77, US Congressional District 52 6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies. _X_ Prop 13 ___ EPA 319(h) ___ Other </p><p>B) Contract Contact: Refers to contract project director. Name: Robin Rierdan Job Title: Project Manager Organization: San Diego River Park Lakeside Cons Webpage Address: www.lakesideriverpark.org Address: 11769 Waterhill Road, Lakeside, CA 92040 Phone: 619-443-4770 Fax number: 619-443-4740 Email: [email protected] C. Contract Time Frame: Refers to the implementation period of the contract. From: May 1, 2004 To: March 31, 2006 </p><p>D) Project Partner Information: Name all agencies/groups involved with project. N/A E) Nutrient and Sediment Load Reduction Projection (if applicable): /A </p><p>PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us