Asb Work Programme

Asb Work Programme

<p>ASB WORK PROGRAMME </p><p>Topic Proposed Secretariat Current status Current action required 2014/15 2015/16 Board member Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p>ASB PROJECTS AND LOCAL INITIATIVES</p><p>Improvements B Colyvas T Tshoke Research Research IPSASB, IASB LED project 2015/16 and internal improvements</p><p>Government L Bodewig T Tshoke Research Draft Directive issued Comments Business Enterprises (Phase II)</p><p>Guideline on A Botha Research OAG agreed to update; PPPs ASB to review</p><p>Principal-agent N Ranchod J Poggiolini & Research Exposure draft issued Comments relationships GRAP T Tshoke</p><p>Natural L Bodewig A Botha Research Discussion Paper issued Comments resources LED</p><p>Post V Jack J Poggiolini implementation review of Standards of GRAP</p><p>“Think V Jack J Poggiolini Research Discussion Paper issued. Comments on paper piece” on materiality</p><p>1 31 July 2014 ASB WORK PROGRAMME </p><p>Topic Proposed Secretariat Current status Current action required 2014/15 2015/16 Board member Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p>Review of R Rasikhinya J Poggiolini Research Research changes Comments GRAP 17, GRAP 16 and GRAP 1: </p><p>- Distincti on betwee n investm ent propert y and PPE</p><p>- Indicato r based approa ch for useful lives</p><p>- Disclos ure of capital work- in- progres s</p><p>- Retain or delete encour aged disclos ures</p><p>2 31 July 2014 ASB WORK PROGRAMME </p><p>Topic Proposed Secretariat Current status Current action required 2014/15 2015/16 Board member Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p>- Amend ments to GRAP 1, repairs and mainte nance </p><p>Interpretatio R Rasikhinya A Botha Research Research proposed ED IGRAP n on the accounting recognition of land</p><p>Guideline on R Rasikhinya A Botha Research Research proposed DG accounting accounting for housing arrangement s</p><p>Treatment of T Coetzer T Tshoke Research Changes agreed by Proposed transaction costs Board; publish as part of changes in relation to next improvements project GRAP 23</p><p>Review of T Coetzer A Botha Research Streamlining Directives DD transitional outlining transitional provisions in provisions. Directives 1 to 4 Monitor IPSAS first time adoption project. </p><p>GRAP Reporting A Botha Research Research FD Framework</p><p>3 31 July 2014 ASB WORK PROGRAMME </p><p>Topic Proposed Secretariat Current status Current action required 2014/15 2015/16 Board member Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p>Binding T Coetzer T Tshoke Research Monitor IPSASB LED arrangements consolidations project which now defines term.</p><p>Review of GRAP J Poggiolini & T Tshoke Research Research Comments 21 and 26 on Impairment of Assets</p><p>Insurance E Swart Research Research contracts in the public sector</p><p>Cash Flow Research Review presentation of Statements grants (separation between capital and operational & capital and operational expenditure on assets)</p><p>Strategy Full board E Swart Develop draft paper for Draft Paper discussion consultation after strategy</p><p>Framework for E Swart Research Project of the trilateral Research whole of government consolidation</p><p>IPSASB CONVERGENC E</p><p>IPSASB’s Active projects</p><p>Improvements B Colyvas T Tshoke IPSAS Improvements issued for Improve-</p><p>4 31 July 2014 ASB WORK PROGRAMME </p><p>Topic Proposed Secretariat Current status Current action required 2014/15 2015/16 Board member Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p> project 2014 ments (convergence) 2015/16</p><p>Public sector R Rasikhinya A Botha Draft Consultation Project re-activated; combinations Paper monitor.</p><p>Reporting on the V Jack J Poggiolini RPG 1 RPG 1 issued. Liaison Long Term with National Treasury on Sustainability of local application. an Entity’s Finances</p><p>Conceptual V Jack J Poggiolini FC Final chapter approved. Analysis framework Phase I</p><p>Consultation V Jack J Poggiolini IED Analysis of comments; Analysis Paper Phase II monitor.</p><p>Consultation V Jack J Poggiolini PFC Provisional approval of Analysis Paper Phase III final chapter.</p><p>Consultation V Jack J Poggiolini PFC Provisional approval of Analysis Paper Phase IV final chapter.</p><p>Reporting of CJ Kujenga J Poggiolini IED CP Draft RPG issued. Service Develop comment letter. Performance Information</p><p>Financial G Paul J Poggiolini RPG 2 Analysis of impact Statement prepared. Discuss with the Discussion and OAG Analysis</p><p>5 31 July 2014 ASB WORK PROGRAMME </p><p>Topic Proposed Secretariat Current status Current action required 2014/15 2015/16 Board member Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p>Consolidations K Kumar A Botha Exposure drafts Analysis of comments; and joint issued monitor. arrangements</p><p>First time L Bodewig A Botha Exposure draft Analysis of comments; adoption of issued. monitor. IPSASs</p><p>IPSASB’s Research project</p><p>Social benefits V Jack J Poggiolini IED Project reactivated IPSASB; monitor. </p><p>Revisions to T Coetzer J Poggiolini - Monitor – Pending IPSAS 23 (Non- completion of IPSASB exchange Conceptual Framework revenue)</p><p>Government L Bodewig T Tshoke IED COP Consultation Paper Business issued. Enterprises</p><p>Public Sector N Ranchod J Poggiolini Research Development of Specific Consultation Paper. Financial Instruments</p><p>Topic Board member Secretariat Current status Current action required 2014/15 2015/16</p><p>Quart 4 Quart 1 Quart 2 Quart 3 Quart 4</p><p>IASB CONVERGENC</p><p>6 31 July 2014 ASB WORK PROGRAMME </p><p>E</p><p>Improvements B Colyvas T Tshoke Research 10/12, 11/13 and 12/14 Improve- project improvements to be ments considered in 2015/16 2015/16</p><p>Interpretations B Colyvas T Tshoke Research Monitor Improve- ments 2015/16</p><p>Consolidations R Rasikhinya A Botha IFRS Monitor IPSASB project (IFRS 10 and (EDs issued) amendments to IAS 27 and 28)</p><p>Joint R Rasikhinya A Botha IFRS Monitor IPSASB project arrangements (EDs issued) (IFRS 11 and amendments to IAS 28)</p><p>Fair value B Colyvas T Tshoke IFRS Consider in context of Analysis measurement Phase 3 of IPSASB (IFRS 13) conceptual framework.</p><p>Revisions of IAS N Ranchod J Poggiolini Revised IAS Revised IAS recently 19 (Employee issued – consider impact Benefits) on public sector</p><p>Revision of IAS L Bodewig A Botha International ED Monitor – Pending 37 finalisation of IPSASB Conceptual Framework Project</p><p>Revenue T Coetzer J Poggiolini IFRS 14 issued Monitor IPSASB Analysis</p><p>Leases G Paul T Tshoke ED Monitor IASB</p><p>Agriculture ED Monitor IASB Research (bearer </p><p>7 31 July 2014 ASB WORK PROGRAMME </p><p> biological assets)</p><p>KEY</p><p>CL Comment Letter ICP International Consultation Paper</p><p>CP Consultation Paper IED International Exposure Draft</p><p>CED Concurrent Exposure Draft FG Final Guideline</p><p>DD Draft Directive GRAP Final Standard of GRAP</p><p>ED Draft Interpretation IAS International Accounting IGRAP Standard</p><p>DG Draft Guideline LED Local Exposure Draft</p><p>FD Final Directive PB Project Brief</p><p>IGRAP Final Interpretation PP Position Paper</p><p>RPG Recommended Practice Guideline</p><p>8 31 July 2014</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us