DETE - Safe Operating Procedure s4

DETE - Safe Operating Procedure s4

<p>Website link to this SOP document: http://education.qld.gov.au/health/safety/hazards/equip-resources.html </p><p>DOWELING MACHINE DOWELING MACHINE</p><p>Students must read this important OPERATIONAL SAFETY CHECK information before using the equipment Never operate a faulty Power Tool Has your teacher given you instruction on the – Report it to your teacher – safe use & operation of this equipment ? 1. Use a vice or clamp to securely hold the workpiece and support any over-hanging portion. Has your teacher given permission for you to 2. Do not hold your workpiece by hand. use this equipment ? 3. Set fence heights and all stops to assure the correct, accurate position and depth for drilling. 4. Keep both hands on the dowelling machine while Approved safety glasses must be worn at drilling. all times in all ITD workspaces. 5. Keep the sole plate pressed firmly on the workpiece. 6. Do not apply excessive force – this could cause the drill Appropriate protective footwear with bit to burn the workpiece. substantial uppers must be worn in all ITD workspaces. 7. Before cleaning away waste material and inspecting the results of the drilling process, always bring the machine to a complete stop and keep hands away from Rings & jewellery must NOT be worn when the drill. using this portable power tool. 8. If any unforeseen problems arise while drilling, stop immediately, switch off and report it to your teacher. 9. Turn off immediately after use. Do not place the machine down until the drill has stopped rotating.</p><p>PRE-OPERATIONAL SAFETY CHECKS Adjust fences and depth gauges accurately 1. Ensure this power tool has a suitable safe work area. HOUSEKEEPING 2. Select the correct size drill bit to suit the dowel 1. Return this tool to the appropriate storage cupboard. pins to be used. 2. Leave the work area in a safe, clean, & tidy condition. 3. Ensure all safety guards are serviceable & in place. POTENTIAL HAZARDS AND RISKS 4. Make all machine adjustments with the power lead disconnected from the AC isolating switch. ■ Moving, rotating & sharp parts ■ Electricity 5. Ensure adequate dust ventilation or extraction. ■ Noise ■ Excessive dust ■ Eye injuries</p><p>Front Reverse</p><p>Assembly Instructions: Carefully fold this page in half vertically down the centre line; This should align “Front” & “Reverse” sides, then glue the halves back to back; Cut out the “Tag” shape along the RED dotted outlines indicated on the “Front” side; Laminate & trim to size with a clear 2 mm border; Securely fasten an 8mm (ID) brass eyelet & washer where indicated.</p><p>Page 1 of 1 Reviewed: November 2013. V3 Organisational Health Unit Uncontrolled </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us