A Case Study of the Design, Installation, and Early Performance of a Nineteen-Millimeter

A Case Study of the Design, Installation, and Early Performance of a Nineteen-Millimeter

<p>A CASE STUDY OF THE DESIGN, INSTALLATION, AND EARLY PERFORMANCE OF A NINETEEN-MILLIMETER SUPERPAVE MIX Maupin, GW, Jr</p><p>Abstract</p><p>An attempt was made to design and construct a coarse matrix high binder (CMHB) mix. When the design of the CMHB mix was unsuccessful a coarse 19.0-mm Superpave mix was substituted. This report describes the attempted design of the CMHB mix, as well as the design, construction, and early performance of the Superpave mix. Construction problems with the Superpave mix included low gyratory voids on field samples and tenderness during compaction. Mix adjustments in the gradation and asphalt content failed to remedy the problems. The tenderness also contributed to inadequate pavement density. Although field samples indicated low gyratory voids, no overconsolidation as would be evidenced by bleeding has been observed. Therefore, it appears that this mix was able to contain more asphalt than was predicted by the gyratory voids. The average rut depth of all sections was about 4 mm after 27 months.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us