TEAM Will Be an Integrated, Engineering-Driven, Design and Manufacturing Company Providing

TEAM Will Be an Integrated, Engineering-Driven, Design and Manufacturing Company Providing

<p> QUESTIONNAIRE EXAMPLE</p><p>This questionnaire was designed collaboratively by a workforce organization, their business client, and staff of the Aspen Institute Workforce Strategies Initiative during the development of the Business Value Assessment toolkit. Visit www.aspenwsi.org for more information about the Business Value Assessment project.</p><p>This assessment questionnaire was used by the workforce organization and their business partner to assess the business value of a specific workforce initiative. In most cases, it is not appropriate to adopt this example without modification. We recommend that this example serve as a springboard for your business value assessment, and be adapted for your specific assessment. WSI is not responsible for the correctness of the information collected using the Business Value Assessment tools. NOTE: This questionnaire was designed to evaluate a Kaizen Event in support of a workforce development program in lean manufacturing. This questionnaire is not appropriate for exact reproduction in a different type of training environment, although it is being reviewed for use in Six Sigma context.</p><p>TEAM Industries Lean Manufacturing Training Survey </p><p>This survey is being conducted to help TEAM Industries evaluate the effectiveness of and improve upon its training events. In order to do so, we need your help. This is a confidential survey; in no way will your identity be revealed during the data analysis and reporting process. </p><p>1. My department (check that which best describes your department)</p><p>Mill Tooling Deburring</p><p>Lathe Forklift/Housekeeping Engineering</p><p>Grinding/Heat Treat Quality Office/IS</p><p>Roto-Flo Maintenance Shipping/Receiving</p><p>Scheduling/ Tool Crib Other Purchasing</p><p>2. My position (check that which best describes your position)</p><p>Supervisor Direct Labor Administrative</p><p>Manager Indirect Labor Other</p><p>3. Total length of time you have worked for TEAM Industries (check one)</p><p>0-6 Months 1-3 Years 6-10 Years</p><p>7-12 Months 4-5 Years More than 10 Years</p><p>4. Your shift (check one) Days Nights</p><p>Lean Manufacturing Training Survey (rev. 1/12/05) 1 Copyright 2005 by WSI, a project of the Aspen Institute NOTE: This questionnaire was designed to evaluate a Kaizen Event in support of a workforce development program in lean manufacturing. This questionnaire is not appropriate for exact reproduction in a different type of training environment, although it is being reviewed for use in Six Sigma context.</p><p>5. Thinking about your work environment: Rate how much you agree or disagree with the statement and indicate whether or not your response reflects a change that has taken place in the last 3 months. </p><p>Strongly Strongly Disagree Agree Change? Disagree Agree </p><p>(a) Continuous learning is Yes No expected and encouraged. </p><p>(b) Management supports the notion that employees are in the best position to Yes No make decisions that relate to their work. </p><p>(c) There is openness to taking on new or added Yes No responsibilities. (d) We work together well by listening, coaching, Yes No letting go, and giving feedback. (e) The need for specialized skills is Yes No emphasized. </p><p>(f) Employee performance goals don’t seem to match Yes No up with the goals of the organization. </p><p>(g) Individual roles and responsibilities are clearly Yes No understood. </p><p>(h) Individual achievement Yes No is valued the most. </p><p>(i) Work groups effectively work together to solve Yes No problems and improve the process. </p><p>(j) There is a resistance to and lack of commitment to Yes No change.</p><p>Lean Manufacturing Training Survey (rev. 1/12/05) 2 Copyright 2005 by WSI, a project of the Aspen Institute NOTE: This questionnaire was designed to evaluate a Kaizen Event in support of a workforce development program in lean manufacturing. This questionnaire is not appropriate for exact reproduction in a different type of training environment, although it is being reviewed for use in Six Sigma context.</p><p>6. Think about your training experiences and the value of training to you in general. With respect to training experiences and the possibility of participating in future training events, read each statement carefully and check the box that indicates how strongly you agree or disagree. </p><p>Neither Strongly Strongly Disagree Agree nor Agree Disagree Agree Disagree</p><p>(a) I think that it is interesting. </p><p>(b) Everyone is supposed to do it.</p><p>(c) It is good for me. </p><p>(d) I’m not sure if it’s worth it.</p><p>(e) I think it is fun. </p><p>(f) Participation should be a personal decision.</p><p>(g) I don’t have a choice.</p><p>(h) I don’t see what training does for me.</p><p>(i) I feel good after a training event. </p><p>(j) It is important to me.</p><p>(k) I feel like it is something that I have to do.</p><p>(l) I do it, but I don’t think it’s for everyone. 7. Have you ever participated in a Kaizen event? Yes No</p><p>If you answered yes to question 7 then please take another minute to answer questions 8 and 9, otherwise you are done—Thank you!</p><p>8. Please check the box that best reflects your agreement with each statement that completes the sentence “The Kaizen event helped me… “ </p><p>Lean Manufacturing Training Survey (rev. 1/12/05) 3 Copyright 2005 by WSI, a project of the Aspen Institute NOTE: This questionnaire was designed to evaluate a Kaizen Event in support of a workforce development program in lean manufacturing. This questionnaire is not appropriate for exact reproduction in a different type of training environment, although it is being reviewed for use in Six Sigma context.</p><p>Neither Strongly Strongly Disagree Agree nor Agree Disagree Agree Disagree</p><p>(a) To appreciate the need to serve as a resource for others. </p><p>(b) To recognize the need to focus on the entire process. </p><p>(c) To realize my role in contributing to the success of the organization. </p><p>(d) To be more open to a process of continuous learning and skill development.</p><p>(e) To understand the benefits of a team-based approach. 9. Would you recommend participation in a Kaizen event to others? </p><p>No, not at all Moderately, not sure Yes, very much so</p><p>THANK YOU FOR YOUR HELP</p><p>Lean Manufacturing Training Survey (rev. 1/12/05) 4 Copyright 2005 by WSI, a project of the Aspen Institute</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us