UCLL Co-Location Tie Cable Service

UCLL Co-Location Tie Cable Service

<p>UCLL Co-location Tie Cable Service (ASF-011)</p><p>Please submit this Application Form through Online Ordering & Tracking system (OO&T) using Service Type Co-location and Request Types Footprint & Miscellaneous or Footprint Enhancement.</p><p>Chorus Co-location Provisioning Team to Complete</p><p>OOT Number</p><p>This Section is for the Access Seeker to Complete </p><p>Preferred Chorus Access Seeker Build Handover Date</p><p>Name of Loop Wire Centre</p><p>Instructions: - Complete this form when connection to the HDP is required and the Access Seeker Equipment is not co-located within the exchange - * denotes mandatory fields. Enter N/A when not applicable.</p><p>Tie Cable Requirements - Copper Cables from HDP to Remote Access Seeker Equipment</p><p>Number of Tie Cables *</p><p>Number of Pairs per Tie Cable * (See Notes)</p><p>Chorus to Supply Tie Cables * (Y/N)</p><p>If Access Seeker to Supply Provide Delivery Details * Specify expected delivery date to Chorus for installation</p><p>Specify Location of Access Seekers External Network Delivery Point * Please attach a civils and cabling design to this Order specifying: For Tie Cables requiring entry via the - Exchange Manhole Number (s) to be entered Exchange Manhole * - Access Seeker duct entry design detail - Cable hauling plan to Access Seekers network - Length of tie cable tails to be left in Exchange Manhole to enable haul and jointing to Access Seekers network - Quantity, type, and specification of tie cables to be installed - The Co-location Footprint ID the tie cables are to be terminated in - If tie cables are to be supplied by the Access Seeker include delivery date to Chorus</p><p>31 October 2011 Confidential Page 1 Version 1.1 © Copyright Chorus 2011 UCLL Co-location Tie Cable Service (ASF-011)</p><p>Tie Cable Requirements - Copper Cables from HDP to Remote Access Seeker Equipment Any exchange detail required for the preparation of this design can be obtained by requesting a Full Site Audit. Use Co-location Order Request Type: Detailed Site Audit and submit through OO&T.</p><p>Specify Any Other Requirements</p><p>Notes: - Access Seeker Tie cables must meet the specification ASD-002 Chorus Tie Cable Specification - The number of pairs per Tie Cable determines the optimum size of HDP block to be provided by Chorus</p><p>31 October 2011 Confidential Page 2 Version 1.1 © Copyright Chorus 2011</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us