Minnesota Department of Transportation s6

Minnesota Department of Transportation s6

<p>Minnesota Department of Transportation Memo Office of Construction and Innovative Contracting 395 John Ireland Blvd St Paul, MN 55155</p><p>, 20 </p><p>TO: Thomas Sorel Commissioner of Transportation</p><p>FROM: Amber Blanchard Design-Build Program Manager </p><p>SUBJECT: SOQ Short-Listing Executive Summary Design-Build Project S.P. </p><p>On , 20 , teams submitted Statement of Qualifications (SOQ) to Mn/DOT for evaluation for the above referenced project. The teams were made up of the following Companies or Joint Ventures</p><p>1. 2. 3. 4. 5. </p><p>On , 20 , the Technical Review Committee received a copy of each team’s SOQ and a copy of the “ SOQ Evaluation Manual”, which had been developed prior to the receipt of the SOQ’s. The Evaluation Manual outlined the procedures and criteria for evaluating the SOQs.</p><p>On , 20 , the Technical Review Committee reconvened to discuss the submitted SOQs and the evaluations performed by each member. After the interviews and discussions, the members finalized their evaluations and scores. Scores were submitted to the Project Manager for recording.</p><p>The teams were evaluated by the following criteria:</p><p>    </p><p>A table showing the Evaluator scoring, average score and final ranking for each team is shown as follows.</p><p>Design-Build Manual (5/11) Form 4.6e Evaluator Total Scoring by Proposer</p><p>Evaluator 1</p><p>Evaluator 2</p><p>Evaluator 3</p><p>Evaluator 4</p><p>Evaluator 5</p><p>Total Average</p><p>Score Final Ranking </p><p>After the technical evaluation process, the Technical Review Committee then discussed the total average scores and whether a logical breakpoint existed for determining the most highly-qualified teams that should be short-listed for this project.</p><p>Based on the final scores, the Technical Review Committee recommendation is to shortlist SOQ submitters. The recommended short-listed teams are:      </p><p>I Concur:</p><p>Commissioner Date FHWA Date</p><p>Design-Build Manual Form 4.6e cc: , Chief Engineer , Engineering Services Division Director , Operations Division Director , District Engineer , Project Manager , State Construction Engineer , Innovative Contracting Director File</p><p>Design-Build Manual Form 4.6e</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us