Appendix 11 Electrical Inspection and Test Plan

Appendix 11 Electrical Inspection and Test Plan

<p> Appendix 11 – Electrical Inspection and Test Plan</p><p>Client: Project: Site address: Contact number: Operation or Stage of Work Inspection: What/Who Stage/ Frequency Records Requirement Stan- Acceptance Criteria Inspection/test Ref Description Characteristics dard/ specification procedure Worker Service Customer Provider</p><p>Incoming materials inspection Conform to order Each delivery Delivery Dock- Orders as placed Specification and codes Check against H S 1 ets orders</p><p>Storage and protection As specified Each week Visual Protected from Safe, secure/adequate Visual X S S 2 weather protection Preliminary activities Task completion Each work Hazard Assess- Specification, as All tasks completed Visual H W S 3 area ment procedure attached Fencing / signage/ Pre-start Ready to start work Each work Protective As per site specific To authority requirements Checked H W S 4 area clothing procedure</p><p>Carry out work To trade codes & Each Checklist Specification as per Checklist and test panel Checked H (A) W S authority sequence SWMS attached 5 requirements Conduit installation To trade codes & Each Checklist SWMS002 Checklist Checked X W S authority sequence 5a requirements Cable installation To trade codes & Each Checklist SWMS012 Checklist Checked X W S authority sequence 5b requirements Earth test report Cable connections To trade codes & Each Checklist SWMS013 Checklist Checked X W S authority Sequence 5c requirements HV test report Wiring Pre-handover activities All matters Each work diagrams/ Specification, as All items completed to Final inspection H H H finalised, clean area checklist attached specification 6. and tidy W = Witness A ‘witness point provides a party (such as the customer, service provider and regulatory authority) with the opportunity to witness the inspection or test or aspect of the work, at Point their discretion.</p><p>A ‘hold’ point defines a point beyond which work may not proceed without the authorisation of a designated service provider or authority. This ‘designated service provider or H = Hold Point authority’ might be an agency or other customer’s representative/ authorised person, or a regulatory authority (such as Integral Energy, Sydney Water, Council and/or WorkCover etc.) representative, or it may be the service provider inspecting its service provider or worker.</p><p>H (A) = Inspection/test by authority X = Self inspection by worker performing the work</p><p>Electrical work to AS3000:2007 and Installation and Wiring Rules unless otherwise required.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us