Continuing Education Courses Technical Sessions

Continuing Education Courses Technical Sessions

<p>Time Gas-Lift Continuing Education Courses Wed. Technical Sessions – Feb. 3, Thurs. Technical Sessions – Feb. 4, Monday & Tuesday, Feb. 1 & 2, 2010 2010 2010 8:00 Gas-Lift Design, Artificial Lift Dual Gas-Lift, Sub-Sea, Sub-Sea Single Point New and Gas-Lift Valve Installed with Gas-Lift Selection, Gas-Lift Deep Water, Injection Emerging Tractor Valve Performance Gas-Lift Overview Operations, TLP SPT Group Gas-Lift Aker, StatoilHydro 8:30 Prod. Facilities Gas-Lift Clean Up Technology Paradigm Shift in Gas-Lift One Two-Day Automation Co-Chairs: Dynamic Simulation Analysis Course One Two-Day And Optimization Wayne SPT Group Chair: eP/Weatherford 9:00 Course Mabry Gas-Lift Valve Barrier Bryan Unique Wellhead Safety Instructors: Two One-Day and Mike Testing Freeman Valve System Joe Clegg Instructors: Courses Johnson StatoilHydro PTC Norway 9:30 Ken Decker Mike Johnson New GL Valve Tech. for Continuous GL Opt. with Cleon Dunham John Martinez Instructors: Deep Water Generic Algorithms Tom Nations Cleon Dunham PTC Norway Petrobras 10:00 --- Break ------Break ------Break --- 10:30 Sid Smith Tom Ryan Dual Gas-Lift Well Analysis High Angle Water Flood in Ron Schmidt ExxonMobil Alaska Schlumberger 11:00 WellTracerTM Solution for Future of Intelligent Agents Well Optimization in Gas-Lift Weatherford Intelligent Agent Corp. 11:30 Panel Session Panel Session 12:00 --- Lunch ------Lunch ------Lunch --- 12:30 --- Keynote Address ------Visit the Exhibits --- 1:00 From 12:45 – 1:30 1:30 Gas-Lift SPE Petroleum Engr. Hand Field World Class GL Design: Book Reviews, Management in PDO Oman Single, Consultant – Joe Clegg Recom- PDO Oman 2:00 Dual, Inter- GL Design with Valve mended Okume Gas-Lift Project mittent Performance Models Practices Hess Decker Technology 2:30 Chair: History, Summary of Valve Chair: Status of API and ISO Gas- Greg Perf. Clearing House Keith Lift Work Stephenson Decker Technology Fangmeier Schlumberger 3:00 --- Break ------Break ------Break --- 3:30 Design Solution for Unique Real-Time GL Optimization Gas-Lift Application in Offshore Dubai Weatherford Smart Zone Solutions 4:00 Panel Session Gas-Lift Dewatering Method Field Study Altec 4:30 Four Concurrent Breakout Sessions Panel Session 5:00 --- Classes End at 5:00 pm --- See Next Page Summary of Breakouts 5:30 Monday Evening Free Tuesday Evening --- Sessions End at 5:30 pm --- Workshop Ends at 5:30 --- 6:00 Reception in Exhibit Area 6:30 From 5:15 – 6:30 pm General Workshop Reception for All Attendees, Steering Committee Dinner from 6:00 – 8:00 7:00 Open for All Continuing Education Sponsored by Weatherford, upstairs on Veranda 7:30 and Workshop Attendees from 5:45 – 7:00 Workshop Dinner from 7:00 – 8:30 Continuing Education Courses Technical Sessions - 2 Days --- Gas-Lift Design, Gas-Lift Valve Performance - Sub-Sea Gas-Lift, Deep Water Gas-Lift, TLP’s - 2 Days --- Artificial Lift Selection – Gas-Lift, ESP, PCP, Sucker Rod, Prod. Facilities - Gas-Lift Design for Singles, Duals, Intermittent Gas-Lift - 1 Day --- Dual Gas-Lift Issues, Design, Operations - New and Emerging Gas-Lift Technology - 1 Day --- Gas-Lift Operations, Gas-Lift Automation & Optimization - Field Reviews, Recommended Practices</p><p>Breakout Sessions API Meetings - Deep water, sub-sea, TLP gas-lift design and operations. - Meeting of API RP 19G13 Work Group on Friday from 8:00 – 10:00 - Gas-lift design. - Meeting of API RP 19G Task Group on Friday from 10:00 – 12:00 - Gas-lift HSSE (Health, Safety, Security, Environment) - Meeting of API RP 19G12 Work Group on Friday from 1:00 –3:00 - Gas-lift field trip to a local gas-lift shop. Will return in time for reception and dinner. - Meeting of API RP 19G11 Work Group on Friday from 3:00 – 4:00</p><p>Technical Presentations</p><p>Sub-Sea, etc. Gas-Lift Design - SPT Group --- Sub Sea Single Point Injection - Clegg --- SPE Petroleum Engineering Handbook - SPT Group --- Clean-Up, Dynamic Simulation - Decker --- Gas-Lift Design with Valve Performance Models - StatoiHydro --- Gas-Lift Valve Barrier Testing - Decker --- History, Summary, Cases with VPC - PTC Norway --- New Gas-Lift Valve Technology for Deep Water - Weatherford --- Completion Design for Unique Gas-Lift Application - ExxonMobil --- Dual Gas-Lift Well Analysis - Weatherford --- WellTracerTM for Gas-Lift Optimization</p><p>New and Emerging Technologies Field Reviews, Recommended Practices - Aker, StatoiHydro --- GL Valve Installed with Tractor - Petroleum Development Oman --- Update on GL Surveillance - eP, Weatherford --- Paradigm Shift in GL Analysis - Hess --- Okume Gas-Lift Project - PTC Norway --- Unique Wellhead Safety Valve Systems - Schlumberger --- Status of API and ISO Gas-Lift Work - Petrobras --- Gas-Lift Optimization with Generic Algorithms - Smart Zone Solutions --- Real-time GL Optimization in Dubai Offshore</p><p>- Intelligent Agents Corp. --- The Future of Intelligent Agents in Gas-Lift - Altec --- Gas Well De-Watering Method Field Study - Schlumberger --- High Angle Water Flood</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us