Cleaner and Safer Environments: Striving for Cleaner, Greener and Attractive Public

Cleaner and Safer Environments: Striving for Cleaner, Greener and Attractive Public

<p>Cleaner and safer environments: Striving for cleaner, greener and attractive public environments across the District</p><p>Direction of Travel PIs</p><p>Quarter 1 Quarter 2 Quarter 3 Annual Target</p><p>Percentage of household waste recycled 57.61% 54.22% Residual household waste collected 4718 Tonnes 4656 Tonnes Strategic Objective</p><p>Striving for cleaner, greener and attractive public environments across the District Action +Progress Update Outcomes Q1 Q2 Rating Rating Procure a single contract for the delivery of all Waste Collection Services  Provide a cost effective waste which;- collection service.  Meets current service standards  Encourage recycling of  Ensures a minimum 50% rate of recycling household waste.  Is within existing budgetary provision</p><p>The contract has been written and tendered with a start date of 1st April 2016. Three compliant submissions (including the in-house team’s bid) have been received and subjected to evaluation by Council officers. Officers’ recommendations were received by Cabinet on 12th November 2015. </p><p>Deliver the Bus Shelter Replacement and Refurbishment Programme  Improve the appearance of the “gateways” into the District All programmed bus shelter (6) replacement for 2015/16 have been  Ensure the safety of residents completed by the end quarter 2. The refurbishment programme is ongoing  Reduce crime and vandalism into quarter 3. Action +Progress Update Outcomes Q1 Q2 Rating Rating To progress the provision of additional burial space in the south of the Site secured to ensure future District burial spaces for residents of the District Quarter 1 – To specify, issue tenders and appoint a contractor to undertake due diligence tests on preferred site before purchase.</p><p>The location for the preferred new cemetery site is in the former “Bleak House” site in Norton Canes and during the first quarter of 2015-16 a number of due diligence tests including a phosphates study, gas monitoring and a mining risk assessment have been started as planned. </p><p>Quarter 2 – To complete due diligence tests </p><p>All due diligence checks have been completed and the results analysed and reviewed by Environmental Health. The purchase of the site is on track to be completed in Quarter 3.</p><p>Project Project on Project Project Project completed target scope/target requires aborted/ date requires amendment. closed attention. Alterations Alterations considered . considered by Cabinet. by leadership team.</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us