<p>Saudi Aramco BOP Equipment Failure Report (EFR) Drilling Equipment Monitoring & Repair Unit (EFR# (ASSIGNED BY DEMRU @ 876-3185) 1. Rig Name: 2. Well Number: 3. Rig Foreman (Print): 4. Tool Pusher (Print):</p><p>5. Equipment Manufacturer: 6. S/Aramco C# or Contractor Asset#: 7. Manufacturer Part Number: 8. Contractor Owned Equipment</p><p>Yes No 9. Pressure Rating: 10. Size: 11. Actual Pressure At Failure: 12. Actual Well Fluids:</p><p>13. Primary Assembly Equipment Description: 14. Duration in Service:</p><p>15. Description of Assembly or Spare Part that Failed: 16. Defective Part Number:</p><p>17. Material Being Returned or Replaced?: 18. If Yes, When?: 19. Returned To Where?: (NOTE: Show EFR# On All Returned Material) Yes No 20. Describe (With Narrative And/or Pictures / Sketches) The Failure and Circumstances. Use Additional Pages if Necessary:</p><p>21. Was Field Action Necessary?: 22. If Yes, Describe:</p><p>Yes No</p><p>23. S/A Drilling or Contractor Rig Supt. Name: 24. Superintendent Phone#: 25. Date of Defect:</p><p>26. Submitted By (Print Name): 27. Signature & Badge#: 28. Date:</p><p>INVESTIGATION ASSIGNMENT 29. Assigned to: 30. Title & Badge: 31. Date Assigned: 32. Due Date: 33. Engineering Contact:</p><p>REASSIGNMENT (AS REQUIRED) 34. Reassigned to: 35. Title & Badge: 36. Date Reassigned: 37. Due Date: 38. Reassigned By:</p><p>INVESTIGATION FINDINGS & CONCLUSIONS 39. Investigation Findings: (Use Additional Pages If Necessary):</p><p>40. Superintendent DRSD (Print): 41: Signature: 42: Badge #: 43. Date:</p><p>INSTRUCTIONS: Complete this form for ANY BOP equipment related failures, whether CONTRACTOR or Saudi Aramco owned Equipment. After completion, fax it to the DEMRU Foreman @ 876-1401, DRSD Superintendent @ 876-1948 and the assigned Rig Superintendent for follow-up.</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-