Before the Uttar Pradesh Electricity Regulatory Commission s3

Before the Uttar Pradesh Electricity Regulatory Commission s3

<p> BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Ref. No. 577 / EO / A (C - 263) dated 16.4.2012</p><p>Present Shri Rajesh Awasthi, Chairman Shri Shree Ram, Member Smt. Meenakshi Singh, Member</p><p>In the matter of: Sub: Petition under section 142 of the Electricity Act 2003 for non compliance of CGRF order in accordance with section 14 of UPERC (Consumer Grievance Redressal Forum & Electricity Ombudsman) Regulation 2007. </p><p>Shri Sunil Kumar Vishkarma S/o Shri Gopal Chandra Vishkarma, Vill – Gurchhapp, Po – Chandopara Handia, Dist.- Allahabad.</p><p>------Petitioner</p><p>Versus</p><p>Executive Engineer, Electricity Distribution Division - II, 57, Jorge Town, Allahabad.</p><p>------Respondent</p><p>ORDER (Hearing on 29.5.2012)</p><p>The petitioner Shri Sunil Kumar filed a complaint under section 142 of the Electricity Act 2003 regarding non compliance of CGRF order dated 15.6.2011 in appeal no. 8/2011. The relevant portion of CGRF’s order is given below: **ifjoknh dk okn Lohdkj djrs gq;s foi{kh dks ;g vknsf”kr fd;k tkrk gS fd og fu.kZ; ds vk/kkj ij iqu% layXud 4 dks la”kksf/kr djrs gq;s le;&le; ij ykxw fo|qr “kqYd ds vk/kkj ij fcy cukdj ifjoknh dks fu.kZ; dh frfFk ls 15 fnu ds vUnj iznku djsaA mDr fcy esa ifjoknh }kjk iznku fd;s x;s :0 11]500@& lek;ksftr gksaxs rFkk tks vf/kHkkj yxk;k x;k gS mls fujLr fd;k tkrk gS rFkk <kbZ o’kZ fcy u nsus ds dkj.k tks isukYVh yxk;h gS mls gLr{ksi djuk vko”;d gS vkSj dqy isukYVh dk 50 izfr”kr jkf”k Hkh U;k;ky; vius foosdk/khu vf/kdkjksa ls ekQ djrh gS vkSj mijksDr vk/kkj ij fcy cuk;k tk;s vkSj ifjoknh nks&nks ekg ds vUrjky ls rhu fd”rksa esa fcy vnk djsxk vkSj igyh fd”r fcy nssus dh frfFk ls ,d ekg ds vUnj ns; gks tk;sxhA foi{kh dks ;g Hkh vkns”k fd;k tkrk gS fd ifjoknh dks fu;fer vUrjky ij fcy nsrs jgsa rkfd ljy Hkqxrku ifjoknh dj lds vkSj “kqYd dk cMk vo”ks’k u cu tk;sA ifjoknh Hkh vius fgr esa ns[ksxk fd ;fn lgh vUrjky ij fcy ugh vk jgk gS rks foi{kh ds ikl fcy cuok ys vkSj vnk dj ns rkfd vo”ks’k u gks vkSj nsus esa leL;k mRiUu u gksA** </p><p>In exercise of powers accorded under section 94 (1) of the Electricity Act 2003 the Commission issued notice dated 15.5.2012 to the respondent to appear before it on 29.5.2012 and substantiate why penal provisions be not enforced against him for non compliance of the CGRF order dated 15.6.2011. </p><p>The petitioner was not present, but the respondent Executive Engineer, was present. The respondent represented by Shri Manoj Kumar Divedi, Advocate whereas the petitioner represented by Shri Sudeep Kumar Mishra.</p><p>The respondent submitted that the order of CGRF has been complied in toto. The petitioner submitted that the connection was sanctioned as PTW for irrigation purposes. Therefore the amended bill is not correct. The respondent submitted that the CGRF order has not directed to change the category of the connection. </p><p>The Commission directed the respondent to submit the office memorandum of the sanction of the connection along with affidavit within fifteen days. </p><p>(Meenakshi Singh) (Shree Ram) (Rajesh Awasthi) Member Member Chairman</p><p>Dated: 12.6.2012</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us