Build up Roofing (Bur) Standard Guidelines

Build up Roofing (Bur) Standard Guidelines

<p>075100S01- BUILD UP ROOFING (BUR) STANDARD GUIDELINES</p><p>1. GUARANTY</p><p>BUR roofs shall have a ten year unlimited guaranty with no penal sum.</p><p>2. VAPOR BARRIER</p><p>Should a vapor barrier be required, it shall be an elastomeric membrane of Ethylene Interpolymer (EIP) either mopped down or self adhering installed by manufacturer's instructions.</p><p>3. INSULATION</p><p>Minimum insulation shall be R-20 using industry standard insulation approved by the roofing system manufacturer. Top layer shall have staggered taped joints. On flat roofs, tapered packages shall be designed and installed with minimum of 1/8" per foot fall.</p><p>4. MEMBRANE CONSTRUCTION</p><p>BUR membrane shall have:</p><p>1. 3 plies of type 6 fiberglass membrane with a cap sheet of white Ethylene Interpolymer (EIP) or,</p><p>2. 4 plies of type 6 fiberglass membrane with top 2 coatings of non-fibrated aluminum. The interply adhesive shall be SEBS rubberized asphalt.</p><p>5. FLASHING, BASE AND CURB</p><p>Flashing membrane shall be:</p><p>1. Ethylene Interpolymer (EIP) or,</p><p>2. SBS modified bitumen woven glass reinforced roofing sheet.</p><p>6. DEAD LEVEL ROOF DECKS</p><p>On dead level roof decks, the University may consider a coal tar pitch roof of insulation and 5 roof plies with aggregate surface.</p><p>075100S01- BUILD UP ROOFING (BUR) STANDARD GUIDELINES Page 1 of 2 Dated: 12/2015 Applies to: All Projects University of Kentucky 075100S01- BUILD UP ROOFING (BUR) STANDARD GUIDELINES</p><p>7. COUNTERFLASHING AND SHEET METAL</p><p>Acceptable materials are</p><p>1. 16 gauge copper</p><p>2. 26 gauge galvanized</p><p>3. 26 gauge stainless steel.</p><p>All corners shall be preformed with no joints occurring at corners.</p><p>Metal counterflashing shall be two part with the fixed part set in a reglet with wedges of lead or copper and caulked using urethane caulk. Surface mounted reglets are prohibited.</p><p>All sheet metal work shall be guaranteed for 5 years.</p><p>8. DRAINS, SCUPPERS AND OVERFLOWS</p><p>On roofs with drains and parapet walls, scupper(s) shall be provided for overflow. The amount of water which a scupper shall pond on a roof because of its elevation above the roof deck shall not exceed 75% of the designed live load of the roof deck.</p><p>9. MISCELLANEOUS</p><p>All drains, scuppers, downspouts, gutter beds, parapet walls, coping, water tables, etc., from the roof deck up shall be considered part of any roof project.</p><p>075100S01- BUILD UP ROOFING (BUR) STANDARD GUIDELINES Page 2 of 2 Dated: 12/2015 Applies to: All Projects University of Kentucky</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us