Service:All Non-Essential Power to the Building

Service:All Non-Essential Power to the Building

<p> REVISED</p><p>Physical Resources Facility Service Disruption Notification Sunday, April 30, 2017 – 7:00am to 7:00pm</p><p>Date Initiated: March 31, 2017</p><p>Service: All Non-essential Power to the Building</p><p>Building(s): The Following Buildings ARE AFFECTED by the Shutdown:</p><p>003 - OVC Main Building Extension 012 - Central Animal Facility 039 - OVC Main Building 040 - OVC Biomedical Science 043 - Canadian Research Institute for Food Safety (CRIFS) 044 - OVC James Archibald Small Animal Clinic 045 - OVC Stewart Building 046 – OVC Former VMI Building 047 - OVC McNabb House 049 - OVC Mona Campbell Centre for Animal Cancer 077 - OVC Lifetime Learning Centre 089 - OVC Pathobiology / Animal Health Labs Building 090 - OVC Large Animal Isolation Building 093 - OVC Hills Pet Nutrition Primary Healthcare Centre 094 - Gnotobiotic Derivation Unit - Portable 095 - OVC Gnotobiotic Laboratory 098 - Portable 123 - Equine Sports Medicine & Reproduction Centre 124 - Equine Manure Holding Facility 165 - OVC Embryo Biotechnology Group 167 - OVC Animal Biotechnology Embryo Laboratory - Portable 174 - OVC Clinical Research 175 - OVC Comparative Clinical Research Facility 183 - OVC Main Animal Holding </p><p>Areas Affected: Entire Buildings</p><p>Contacts: </p><p>Date & Time: Sunday, April 30, 2017 from 7:00am to 7:00pm</p><p>Reason: Maintenance to the Campus Electrical System</p><p>Notes: 1. Non-essential or normal power constitutes the vast majority of power service with-in campus buildings. Essential or emergency power supplies only a small fraction of campus power for important loads such as emergency lighting and critical equipment 2. Buildings listed should be restricted, other than for security reasons. Essential/emergency power and lighting, as provided by the campus essential power system, will not be affected. Heating, ventilation, air conditioning and hot water will not be available during this shutdown. In addition, building elevators will be locked out of service. </p><p>Originator: Justin Selby & Rick Legault</p><p>Extension: 56918 & 52015</p><p>Notification by: </p><p>Contractor: PH Technical Services</p><p>Contractor Email: [email protected]</p><p>Always Email: E-mail: Campus Police ([email protected]) and Contractor(s)</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us