Board of Education of Harford County s1

Board of Education of Harford County s1

<p> BOARD OF EDUCATION OF HARFORD COUNTY</p><p>MONTHLY REPORT ON CONTRACTS SIGNED BY THE SUPERINTENDENT</p><p>NOVEMBER, 2011 — DECEMBER 12, 2011 BOARD OF EDUCATION BUSINESS MEETING</p><p>*Signed by Board President. Date Funds Signed Location/Purpose Amount Available Contact 11/02/11 Forest Hill Annex – Electrical Upgrades Project: X* Harry Miller Key Systems, Inc. – Electrical Upgrades Project, including Alternate #1: provide $ 237,250 Power Panel “K” and associated Feeder. 11/14/11 Havre de Grace High School – HVAC Replacement – Phase I – Change Order: X Harry Miller 2 – G. E. Tignall – P.R.#5: electrical inspector comments [$3,701]; P.R. #6: 10HP to $ 6,115 15HP VFD [$446]; P.R. #7: 8” condenser water line repair [$962]; P.R. #8: gym boiler room flue cap [-$88]; P.R. #9: chiller room ceiling [-$2,010]; P.R. #10: tempering value corrections [$3,349]; P.R. #11: AHU 3&4 circuit breakers [$2,135]; backcharge for Saturday overtime [-$2,380]. 11/14/11 Edgewood High Replacement School – Change Order: X Harry Miller 4A-9 – George Moehrle Masonry – Unused allowance. $ 37,891 11/16/11 Dublin Elementary School: X Jeff LaPorta Action Electrical Contractors, Inc. – Fire alarm system replacement. $ 43,700 11/21/11 Red Pump Elementary School – Change Orders: X Charles Grebe 5A-1 – Kinsley Construction – Install one layer of ¾” plywood in computer lab in lieu $ 1,432 of metal decking. 5A-2 – Kinsley Construction – Roof access modification. 1,454 6A-10 – MRP Contractors – Loading dock bumpers. 1,180 ______TOTAL $ 1,202 11/21/11 North Harford High School: X Jeff LaPorta Professional Startup Services, Inc. – Water Treatment Chemical Feed System. $ 16,650 11/21/11 Hickory Annex Facility: X* Jeff LaPorta Frank Goettner Construction Co., Inc. – Parking Lot Resurfacing Project per Harford $ 259,434 County Bid #11-150. 11/21/11 Hickory Annex Facility: X* Jeff LaPorta American Bus Sales, Inc. – Five 2500 Sprinter vans per State Contract BPO $ 222,621 #001B1400385. 11/21/11 William S. James Elementary School: X* Jeff LaPorta GameTime, Inc. – Furnish, deliver and install a playground per U. S. Communities $ 114,999 Contract #RFP 269-2010-183. 1 Date Funds Signed Location/Purpose Amount Available Contact 11/23/11 Havre de Grace High School HVAC Replacement – Phase 1—Change Order: X Harry Miller 3 – G. E. Tignall – Boiler No. 1 and 2 circuit breakers and wiring and AHU-2 3P, 60A $ 1,494 circuit breaker. 3P, 70A circuit breaker from AHU-2 to be used for AHU-1.</p><p>RMT/nw 11/29/11</p><p>2 Date Funds Signed Location/Purpose Amount Available Contact</p><p>*Signed by Board President.</p><p>RMT/nw -- 11/15/11</p><p>3</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us