Risk Management Example: Centenary of Federation

Risk Management Example: Centenary of Federation

<p>Risk Management Example: Centenary of Federation</p><p>Case Study</p><p>Three events for 15,000 people to commemorate the first sitting of Parliament in Australia and staged at The Royal Exhibition Building, Melbourne</p><p>Key Issues</p><p>. The client was the Federal Government</p><p>. This was to be the largest gathering of dignitaries ever assembled in one place in Australia's history</p><p>. The event was to be telecast live on the ABC</p><p>. The ‘proverbial’ would hit the fan in a big way if anything went wrong</p><p>Response</p><p>A management committee was established to oversee the event that included:</p><p>. Federal Parliament Security</p><p>. Federal Police</p><p>. State Police</p><p>. SEPCO</p><p>. Centenary of Federation</p><p>Risk Assessment</p><p>Risk Assessment was critical, as it would influence many aspects of the planning process.</p><p>A specialist company carried out a risk assessment and produced a document that ran to 96 pages and identified 434 issues that had to be addressed including:</p><p>. Terrorist Attack</p><p>. Power Failure</p><p>. Scaffolding Collapse</p><p>. Medical Emergency</p><p>. Fire</p><p>. Demonstrations</p><p>. Drowning in Ponds</p><p>. Weather</p><p>HOW EVENTive! Page 1 . Emergency Evacuation</p><p>Each and every one of the 434 issues had to be assessed and a plan put in place to assign who and how they would be dealt with, for example:</p><p>. Fire risk was assessed by and would be dealt with by the Fire Brigade.</p><p>. Each of the ponds in the forecourt area would have a lifeguard assigned to them.</p><p>. Due to the fact that raked seating was installed in the balconies the consulting engineers recommended that supports be installed under those balconies. This required holes to be cut in the floor to facilitate the installation of suitable concrete footings.</p><p>. Special MICA Ambulances were placed on standby in the case of medical emergency.</p><p>Key Messages</p><p>. Always undertake a Risk Assessment procedure with a qualified company.</p><p>. Make sure all parties are fully aware of the report, including your own company.</p><p>. Don’t take short cuts. Ensure all recommendations are addressed and implemented.</p><p>HOW EVENTive! Page 2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us