Utility Relocation Cover Sheet

Utility Relocation Cover Sheet

<p> UTILITY RELOCATION COVER SHEET Date: MassDOT Project File No: Project Description: Utility : Design Submittal: Submitted By: Name: Tel. #: Temporary Relocations Included Email: Sketches Attached Estimated Labor Cost: Facility Betterment Estimated Material Cost: Estimated Equipment Cost (if applicable): (If CHECKED, provide brief explanation) Estimated Police Details / Traffic Protection Cost: Estimated SUB CONTRACTOR Cost (if applicable): Estimated Salvage Value (to be subtracted from total): Estimated TOTAL Cost: If NO salvage value included, provide brief explanation: </p><p>Aerial Relocations: Total Number of poles necessitating relocation (even if utility is NOT installing the pole): Total amount of wire / cable for relocation (in feet): Brief Explanation of Scope of Work / Other Remarks:</p><p>Underground Relocations: Total Number of pipe or conduit for relocation: Total amount of manholes for RELOCATION (Adjustments not included): Brief Explanation of Scope of Relocation Work / Other Remarks: </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us