![Press Ctrl + Click HERE To Send Us Comments/Suggestions Regarding This Template](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
<p> State of Michigan (Insert System or Project Name Here) Installation Plan</p><p>General Information</p><p>System or Project Creation Date: ID/Acronym: Client Agency: Modification Date: Author(s): DTMB Authorized by:</p><p>Privacy Information</p><p>This document may contain information of a sensitive nature. This information should not be given to persons other than those who are involved with this system/project or who will become involved during its lifecycle.</p><p>Change Control</p><p>Revision Date Author Section(s) Summary</p><p>Installation Plan 1 of 5 SEM-0702 (Rev. 07/2012) 1. Project/System Information</p><p>1.1 Project Objectives</p><p>1.2 System Description</p><p>1.3 References</p><p>1.4 Outstanding Issues</p><p>1.5 Roles and Responsibilities</p><p>2. Installation Plan</p><p>2.1 Scope</p><p>2.2 Installation Environment</p><p>2.3 Entry and Exit Criteria</p><p>Installation Plan 2 of 5 SEM-0702 (Rev. 07/2012) 2.4 Installation Schedule</p><p>2.5 Backup Entry and Exit Criteria</p><p>2.6 Change Control Procedure</p><p>2.7 Installation Test Procedure</p><p>2.8 Assumptions, Dependencies, Risk</p><p>2.9 Resource Requirements</p><p>Approval Information</p><p>The signatures relay an understanding of the purpose and content of the document by those endorsing it.</p><p>Approve Approve with Modifications Reject</p><p>Comments:</p><p>Approval Signatures</p><p>Installation Plan 3 of 5 SEM-0702 (Rev. 07/2012) Role Name/Title Signature Date Client Sponsor DTMB Sponsor Project Manager</p><p>Installation Plan 4 of 5 SEM-0702 (Rev. 07/2012) </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-