Risk Management Worksheet

Risk Management Worksheet

<p> RISK MANAGEMENT WORKSHEET 1. Organization and Unit Location: 2. of Page</p><p>3. Mission/Task: 4. DTG Begin: 5. DTG End: 6. Date Prepared: </p><p>7. Operational Phase in which the Mission/Task will be conducted:</p><p>8. Prepared by: (Name/Rank/Duty Position)</p><p>9. Identified Hazards: 10. Assess 11. Developed Control Measures for Identified 12. Make Risk 13. How to Implement 14. Supervision and 15. the Hazards: Hazards: (Specific measures taken to reduce the Decisions: the Controls: Evaluation by: Controls Initial Risk: probability and severity of a hazard) Remaining (Include SOPs and (Continuous, Leader Effective (Must Be Filled Risk: (Must Be References, PCI, etc.) Checks, Buddy ? In By Hand) Filled In By System, SITREP, etc.) Y/N Hand) (Be Specific) L M H E (Be Specific) L M H E (Be Specific) (Be Specific)</p><p>16. Remaining Risk Level After Countermeasures Are Implemented: LOW MEDIUM HIGH EXTREMELY HIGH (CIRCLE HIGHEST REMAINING RISK LEVEL) Must be General Officer  17. RISK DECISION AUTHORITY: (Approval Authority Signature Block)(If Initial Risk Level High or Extremely High, Brief Risk Decision Authority at that level on Controls and Countermeasure used to reduce risks.) (Signature indicates only that the appropriate risk decision authority was notified of the initial risk level, control measures taken and appropriate resources requested) RISK MANAGEMENT WORKSHEET *Risk Decision Authority: Low Risk – Company Commander or Leader at execution level; Medium Risk – Battalion Commander or first LTC (05) in the chain of command; High Risk – Brigade/Group Commander or first COL (06) in the chain of command; Extremely High Risk – First General Officer in the chain of command. RISK MANAGEMENT WORKSHEET</p><p>1. Organization and Unit Location: 2. of Page 3. Mission/Task: 4. DTG Begin: 5. DTG End: 6. Date Prepared: </p><p>7. Operational Phase in which the Mission/Task will be conducted: Execution 8. Prepared by: (Name/Rank/Duty Position)</p><p>9. Identified Hazards: 10. Assess 11. Developed Control Measures for Identified 12. Make Risk 13. How to Implement 14. Supervision and 15. the Hazards: Hazards: (Specific measures taken to reduce the Decisions: the Controls: Evaluation by: Controls Initial Risk: probability and severity of a hazard) Remaining (Include SOPs and (Continuous, Leader Effective (Must Be Filled Risk: (Must Be References, PCI, etc.) Checks, Buddy ? In By Hand) Filled In By System, SITREP, etc.) Y/N Hand) (Be Specific) L M H E (Be Specific) L M H E (Be Specific) (Be Specific)</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us