<p> Petition No. 1149 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 15.03.2017 PRESENT:</p><p>1. Hon’ble Sri Desh Deepak Verma, Chairman 2. Hon’ble Sri S.K. Agarwal, Member</p><p>IN THE MATTER OF: For seeking relaxation for evacuation line of MSW based plant.</p><p>AND</p><p>IN THE MATTER OF</p><p>M/s Accord Hydroair (SWM) BBK (P) Ltd., 28 A, Vidhan Sabha Marg, Burlington Crossing, Lucknow-226001 ------Petitioner AND</p><p>1. UP Power Corporation Ltd., 14th Floor, Shakti Bhawan Extn., 14-Ashok Marg, Lucknow</p><p>2. Madhyanchal Vidyut Vitran Nigam Ltd., 5-A, Gokhle Marg, Lucknow-226001 ------Respondent</p><p>Following were presents: 1. Sri R.P. Singh, SE, EDC, BBK 2. Sri R.K. Srivastava, EE, EDD, BBK 3. Sri N.K. Dubey, Accord Hydroair 4. Sri Ajai Vikaram Singh, Advocate, Accord Hydroair</p><p>ORDER</p><p>Page 1 of 2 (Date of Hearing 08.02.2017)</p><p>1. The petitioner, M/s Accord Hydroair (SWM) BBK (P) Ltd., has RDF based 2.5 MW plant at village Hasanpurn Banwa in Distt: Barabanki under the Solid Waste Management scheme of Swachh Bharat Mission.</p><p>2. The petitioner approached UPPCL in December 2015 to enter into PPA for this plant. The plant was expected to be commission by January15, 2016.</p><p>3. The petitioner submitted that the 33KV bay provided to it for termination of evacuation line is almost 20 km away from its site. The cost of constructing such a long transmission line is prohibitive and making project unviable.</p><p>4. Under clause 36 of CRE Regulations, 2014, the evacuation from above plant should take place at 33 KV. However, the petitioner has sought relaxation in this provision and prayed for allowing him to evacuate power at 11KV.</p><p>5. The Commission directed MVVNL to check feasibility of transmission system so that project could be viable. MVVNL is directed to make its submission within a month.</p><p>6. The hearing is adjourned with next date of hearing fixed on 21.03.2017.</p><p>(S.K. Agarwal) (Desh Deepak Verma) Member Chairman </p><p>Place: Lucknow Dated: 15.03.2017 </p><p>Page 2 of 2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us