Sample Technical Field Rating Sheet Properties

Sample Technical Field Rating Sheet Properties

<p> Texas Weatherization Assistance Program Technical Field Rating Sheet March 2010</p><p>Program Year ______Date ______House # ______$______</p><p>______Dwelling Type Job # ______Single Family Assessor Name: ______Mobile Home Contractor/Crew Address ______Multi Family Final Inspector ______Funding Source______</p><p>Assessment  Improvement needed  Acceptable  Unacceptable  Call Back required  Final Inspection  Improvement needed  Acceptable  Unacceptable  Call Back required  Health & Safety Assessment Work Final Inspection Smoke Detector – CO Detector- LSW – Gas Stoves------Comments:</p><p>Diagnostics – (Blower Door/Air Sealing) Pre Weather @ 50Pa ______Assessment Work Final Inspection Intermediate @ 50Pa ______Post Weather @ 50Pa ______Target ______Could Not Perform ______BTL ______Stories ______Comments: </p><p>Attics Unfinished – Finished Kneewall –------Assessment Work Final Inspection Insulation – Vents (High-Low) – Adequate Ventilation-- Hatch Boxed – Barriers--Insulation Cert. Posted – Knob and Tube Comments:</p><p>Walls Assessment Work Final Inspection Insulation -- Knob and Tube ------Comments:</p><p>Foundation - (Floor) Assessment Work Final Inspection Insulation –Crawl-Vapor Barrier-Slab--Repairs-Crawl-Scuttle Door Adequate Ventilation Comments: </p><p>Windows Pane/Frame Caulk – Glass Replacement-Glazing-Adjust Sash Lock- Assessment Work Final Inspection Glass Replacement –Replacement-Storm Windows Comments:</p><p>Windows-Mobile Home Assessment Work Final Inspection Drip Cap- Insider Storm-Replacement ------Comments: Doors Assessment Work Final Inspection Weatherstrip-Sweep-Pane/Frame Caulk-Replacement------Lock-Set-Hinges-Adjustment Striker Plate- Comments:</p><p>Furnace Assessment Work Final Inspection Clean & Tune – Replacement-Repair- Thermostat ------Gas Shutoff-LP Gas Line-(Black or Copper)- Comments:</p><p>Water Heater Assessment Work Final Inspection Gas Shutoff-Replacement-Discharge Pipe------Revent W/H-Elec. Comments:</p><p>Baseload Measures Assessment Work Final Inspection CFL’s- Refrigerators- Water Savers------Comments:</p><p>Air Conditioning Assessment Work Final Inspection Duct System- Filters- Return Air Comments:</p><p>Energy Repair Assessment Work Final Inspection Roof ------Electrical------Repair ------Other------Comments:</p><p>Audit Priority List</p><p>Program Officer: ______Date:______</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us