Regional Construction Standards s1

Regional Construction Standards s1

<p> REGIONAL CONSTRUCTION STANDARDS Fifth Edition</p><p>TABLE OF CONTENTS</p><p>Pages PREFACE The Regional Construction Standards i Administrative Structure ii-iii Want to Get Involved? iii Important Notices iv Use of Professional Engineer’s Seal iv</p><p>DIVISION 1 - GENERAL PROVISIONS</p><p>Section 101 - Definitions of Terms</p><p>I General Definitions 101-1 to 101- 4</p><p>Section 102 - Bidding Requirements and Conditions</p><p>I Invitation for Bids 102-1 to 102-3 II Instructions to Bidders 102-4 to 102-11 III Bid Form 102-11 to 102-17 IV Bid Bond 102-18 V Questionnaire 102-19 to 102-23 VI Certification Regarding Debarment 102-24 VII Certification of Compliance with Immigration Laws and Regulations 102-25 to 102-26</p><p>Section 103 - Award and Execution of Agreement</p><p>I Award and Execution of Agreement 103-1 to 103-3 II Notice of Award 103-4 III Agreement 103-5 to 103-9 IV Performance Bond 103-10 to 103-11 V Payment Bond 103-12 to 103-13 VI Notice to Proceed 103-14 VII Notice of Intent to Award 103-15 </p><p>Section 104 - Scope of Work</p><p>I Intent of Agreement 104-1 II Amending and Supplementing Contract Documents 104-1 III Explorations and Reports 104-1 IV Underground Facilities 104-1 to 104-2 V Subsurface Conditions 104-2 to 104-3</p><p>December 2010 Table of Contents - 1</p><p>Project Title Date Owner Bid Number VI Site Security 104-3 VII Clean-up, Disposal and Restoration 104-3 to 104-4</p><p>Section 105 - Control of Work</p><p>I Reuse of Contract Documents 105-1 II Copies of Contract Documents 105-1 III Contract Documents 105-1 IV Shop Drawings and Submittals 105-1 to 105-4 V Record Drawings 105-4 to 105-6 VI Access to Project 105-6 VII Surveys and Reference Points 105-6 VIII Working Hours 105-6 to 105-7 IX Project Coordination 105-7 to 105-9 X Supervision 105-9 XI Uncovering Work 105-9 to 105-10 XII Removal of Unacceptable Work 105-10 XIII Substantial Completion 105-10 to 105-11 XIV Use of Completed Portions 105-11 XV Final Inspection 105-11 XVI Claims 105-11 to 105-13 XVII Engineer’s Status 105-13 XVIII Documentation of Preconstruction Conditions 105-14 XIX Notice to Comply Order 105-15 XX Stop Work Order 105-16</p><p>Section 106 - Control of Material</p><p>I Tests and Inspections 106-1 II Labor, Materials and Equipment 106-1 to 106-2 III Work by Owner 106-2</p><p>Section 107 - Legal Relations and Responsibility to the Public</p><p>I Permits and Regulations 107-1 II Land, Easements, and Rights-of-Way 107-1 to 107-2 III Protection of Work, Property & Persons 107-2 to 107-4 IV Environmental Stipulations 107-5 to 107-7 V Temporary Facilities 107-7 to 107-8 VI Emergencies 107-8 VII Warranty and Guarantee 107-8 to 107-9 VIII. Opening Sections of Projects to Traffic 107-9 IX No Waiver of Legal Rights 107-9 </p><p>Section 108 - Prosecution and Progress of Work</p><p>I Patent Fees and Royalties 108-1 II Taxes 108-1 III Notice to Proceed 108-1 IV Pre-Construction Conference 108-1</p><p>December 2010 Table of Contents - 2</p><p>Project Title Date Owner Bid Number V Construction Progress Schedule 108-1 to 108-2 VI Subcontracts 108-2 VII Commencement and Prosecution of Work 108-2 to 108-3 VIII Suspension of Work 108-3 IX Termination of Agreement 108-3 to 108-5 X Liquidated Damages 108-6 to 108-7 XI Separate Contracts by Owner 108-7 XII Indemnification 108-7 to 108-8</p><p>Section 109 - Measurement and Payment</p><p>I Measurement and Payment Procedures 109-1 to 109-8 II Change Orders and Field Orders 109-8 to 109-9 III Change Order Form 109-10 IV Application for Payment 109-11 V Escrow Agreement 109-12 to 109-14 VI Affidavit of Payment of Claims 109-15 VII Certificate of Substantial Completion 109-16 VIII Statement of Surety Company 109-17 IX Contractor’s Release 109-18 X Manhole/Structure Protective Coating Post Installation Certification 109-19 to 109-20 XI Standard Bid Items and Units 109-21 to 109-27</p><p>Section 110 – Special Provisions</p><p>I. (Added by Locality) 110-1</p><p>DIVISION 2 - PRODUCTS AND MATERIALS</p><p>Section </p><p>200A Division Table of Contents 200A-1 to 200A-2 200 Products and Materials 200-1 to 200-134 </p><p>DIVISION 3 - ROADWAY CONSTRUCTION</p><p>Section </p><p>300 Division Table of Contents 300-1 to 300-4 301. Clearing and Grubbing 301-1 to 301-5 302. Drainage Structures 302-1 to 302-17 303. Earthwork 303-1 to 303-18 305. Subgrade and Shoulders 305-1 to 305-5 309. Aggregate Base Course 309-1 to 309-3 310. Tack and Prime Coat 310-1 to 310-4 313. Asphalt Surface Treatment 313-1 to 313-5 315. Asphalt Concrete Pavement (NON SUPERPAVE) 315-1 to 315-14</p><p>December 2010 Table of Contents - 3</p><p>Project Title Date Owner Bid Number 315A. Asphalt Concrete Pavement (SUPERPAVE) 315A-1 to 315A-14 317 Pavement Patching 317-1 to 317-3</p><p>DIVISION 4 - MISCELLANEOUS</p><p>Section</p><p>400 Division Table of Contents 400-1 406 Reinforcing Steel 406-1 to 406-4 414. Riprap 414-1 to 414-6</p><p>DIVISION 5 - INCIDENTAL CONSTRUCTION </p><p>Section</p><p>500 Division Table of Contents 500-1 to 500-3 501. Underdrains 501-1 to 501-2 502. Concrete Items 502-1 to 502-14 505 Guardrail and Steel Median Barriers 505-1 to 505-4 507 Fences 507-1 to 507-3 510. Relocating or Modifying Existing Miscellaneous Items 510-1 to 510-3 511. Allaying Dust 511-1 to 511-2 512. Maintaining Traffic 512-1 to 512-18 513. Mobilization 513-1 to 513-1 515. Milling Pavement 515-1 to 515-2 521 Pavers 521-1 to 521-13 530. Abandonment of Existing Pipelines and Structures 530-1 to 530-6 </p><p>DIVISION 6 - LANDSCAPING</p><p>Section</p><p>600 Division Table of Contents 600-1 to 600-2 602. Topsoil 602-1 to 602-2 603. Seeding 603-1 to 603-3 604. Sodding 604-1 to 604-2 605. Planting 605-1 to 605-5 608. Mowing 608-1 to 608-2</p><p>December 2010 Table of Contents - 4</p><p>Project Title Date Owner Bid Number DIVISION 7 - TRAFFIC CONTROL DEVICES</p><p>Section</p><p>700A Division Table of Contents 700A-1 700. Traffic Control Devices 700-1 to 700-15 704. Pavement Markings and Markers 704-1 to 704-7</p><p>DIVISION 8 - WATER AND WASTEWATER UTILITIES</p><p>Section</p><p>800 Division Table of Contents 800-1 to 6 801. Water Distribution Systems 801-1 to 801-19 802. Sanitary Gravity Sewer Systems 802-1 to 802-18 803. Sanitary Force Main Systems 803-1 to 803-12 804. Boring and Jacking 804-1 to 804-4 805. Separation of Water Mains and Sewers 805-1 to 805-2 806. Horizontal Directional Drilling 806-1 to 806-10</p><p>Sanitary Sewer Rehabilitation (Sections 810-822) 810. Sewer Line Cleaning 810-1 to 810-6 811. Television Inspection 811-1 to 811-5 812. Bypass Pumping 812-1 to 812-4 813. Pipe Rehabilitation by Cured-in-Place Method 813-1 to 813-11 814. Pipe Rehabilitation by Fold-and-Form Method 814-1 to 814-10 815. Pipe Bursting 815-1 to 815-7 816. Sewer Pipe Joint Testing 816-1 to 816-3 817. Chemical Grouting 817-1 to 817-4 818. Point Repair by Excavation 818-1 to 818-4 819. Insitu Structural Point Repair 819-1 to 819-4 820. Insitu Point Repair by Sectional Lining 820-1 to 820-3 821. Sanitary Sewer Service Reconnections 821-1 to 821-6 822. Manhole Rehabilitation 822-1 to 822-8</p><p>STANDARD DETAILS</p><p>Standard Details Table of Contents SD-1 to SD-2</p><p>December 2010 Table of Contents - 5</p><p>Project Title Date Owner Bid Number</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us