General Scenario Information

General Scenario Information

<p> FINANCIAL ANALYSIS Runway Improvements</p><p>TASK: Determine correct colors of money.</p><p>OBJECTIVE: The objective is to provide sound business advice to the CE Shop on the proper type of money and most effective contracting tool to accomplish the runway improvements.</p><p>SITUATION: The site commander has requested that an aircraft arresting system be purchased and installed. The arresting system includes cables, nets, and the control devices associated with them. Concrete foundations and the connecting utilities are also required. The quickest installation will be through local labor. What funds will be utilized for the purchase and construction of this system? It has been estimated that the total cost for this system is $860K. The concrete foundation and connecting utilities portion will cost $351K.</p><p>PROPS: None</p><p>ROLE PLAYERS: Customer (Sgt Mule), AFO member (as needed)</p><p>SUGGESTED OUTCOME: Provide funding appropriation for CE resource advisor. Tell SSgt Whoa U. Mule that military construction funds will be used for the concrete foundations and connecting utilities. The arresting equipment must be purchased with common support equipment funds ( 57*3080). The installation expense will also be charged to common support equipment funds ( 57*3080). Ref AFI 65-601 Vol I para 8.20.8.1 ROLE PLAYER’S COPY</p><p>TITLE: Runway Improvements</p><p>SITUATION: The site commander has requested that an aircraft arresting system be purchased and installed. The arresting system includes cables, nets, and the control devices associated with them. Concrete foundations and the connecting utilities are also required. The quickest installation will be through local labor. What funds will be utilized for the purchase and construction of this system? It has been estimated that the total cost for this system is $860K. The concrete foundation and connecting utilities portion will cost $351K.</p><p>SCRIPT FOR THE CUSTOMER: SSGT Whoa U. Mule: " I’m Sgt Whoa Mule, from the CE shop. The commander has ordered us to purchase and install an aircraft arresting system. The system includes cables, nets, and control devices. We will be using local labor for installation of this system. Can you give me the funding appropriation for this type of project? We estimated that the total cost for this system is 860K. The concrete foundation and connecting utilities portion will cost 351K.”</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us