1 Required to Be Performed During Acceptance Inspections

1 Required to Be Performed During Acceptance Inspections

<p> Denver Fire Department Fire Prevention Division</p><p>PO Box 40385 Denver, CO 80204 p: 720.913.3474 f: 720.913.3596 www.denvergov.org/fire Roped Hydraulic Elevator Safety Test Report Building Name: Manufacturer: Capacity: Facilit y/ Address: State Reg #: Job/Contract#: Gener al City: Install Date: Duty: Passenger Freight Infor matio Zip: Rated Speed: Freight Loading Class: C1 C2 C3 n Circle One 1 Acceptance Category 1 Tests 2 Category 1 and 5 Witnessed Testing Date Tests Performed: Was Inspector Present: Yes No If "Yes" Inspector Must Sign Test Report Piston Diameter: in Relief Valve to be set at 150% or less of Adjustment Needed: Yes No Relief No Load Working PSI: psi the Working Pressure Adjustments Sealed: Yes No Valve 1 Full Load Working PSI: psi Relief Valve Setting: psi Test Tag Installed: Yes No Mechanical and Visual Check of Governor Operation: Pass Fail Governor Tripping Speed: Pass Fail Safeti 2 es Speed at which Governor Tripped: fpm Car Safeties (rated load): Pass Fail /Gov Slack Rope Switch: NA Pass Fail Test Tag Installed: Yes No 2 Plunger Gripper Operational: NA Yes No 2 Overspeed Valve operational: NA Yes No Time Started: Proper Fuses Installed: Yes No Connections Tight: Yes No Powe Time Ended: Controller Clean: Yes No Jumpers Removed: Yes No r Down Elapsed Time: Relay(s) Visually Inspected: Yes No Static Change In Car Position: Yes No If "yes" Distance in Oil Loss Accounted For: Yes No Test NOTE: If any oil loss cannot be accounted for, the elevator must be removed from service and the Authority Having Jurisdiction must be notified. Stop Switches: In Car: Pass Fail Pit: Pass Fail Top Of Car: Pass Fail Safet y Directional Limits: Up: Pass Fail Down: Pass Fail Low Oil Protection: NA Pass Fail Devic es Final Limits: Up: Pass Fail Down: Pass Fail Escape Hatch Contact: NA Pass Fail Low Oil Pressure Switch: NA Pass Fail Car Door Restrictor: NA Pass Fail Closing Force (Max 30lbf): lbf Safety Edge: Pass Fail Door Guides Secure: Pass Fail Doors Closing Time: sec Electronic Edge: Pass Fail Door Interlocks/Gate Switch: Pass Fail</p><p>Emer Phase I Recall: NA Pass Fail Phase I Fire Service Instruction Signage In Place: Yes No gency Phase II Operation: NA Pass Fail Phase II Fire Service Instruction Signage In Place: Yes No Opera tion Emergency Communication: NA Pass Fail Alarm Bell: Pass Fail Emergency Lights: Pass Fail Standby or Emergency Power Operation: NA Pass Fail Logs Properly Maintained: Yes No Logs Updated with this Annual safety test: Yes No Logs Fire service logs maintained: Yes No I certify all statements are true to the best of my knowledge and that all testing was performed according to The Elevator and Escalator Certification Act CRS § 9-5.5, Conveyance Regulations 7 CCR 1101-8 and adopted Codes.</p><p>Mechanic Name: Company Name: Signa tures Signature: Date: StateLicense #: </p><p>Inspector Name: Company Name: </p><p>Signature: Date: State License #: 1 Required to be performed during acceptance inspections 2 Required to be performed during acceptance and Category 1 and 5 witnessed inspections</p><p>6/24/13</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us