Project Name> - SDM Integration System Test Report

Project Name> - SDM Integration System Test Report

<p><Project Name> - SDM Integration System Test Report Last Updated: <Insert Date></p><p>03/10/2016</p><p>Integration System Test Report Template Page 1 of 7 <Project Name> - SDM Integration System Test Report Last Updated: <Insert Date> Integration Test Results</p><p>Results <Document the results of the Integration Test.</p><p>Enhancements Duplicates Exit Defects Found Approved INT Results (On Hold) (Withdrawn) Criteria Critical High Medium Low Total</p><p>Analysis <Provide a complete analysis of the test results to confirm that the test phase has met the exit criteria as listed in the Test Plan.></p><p>Integration System Test Report Template Page 2 of 7 <Project Name> - SDM Integration System Test Report Last Updated: <Insert Date> General System Test Results</p><p>Results <Document the results of the System Test.</p><p>Enhancements Duplicates Exit Defects Found Approved SAT Results (On Hold) (Withdrawn) Criteria Critical High Medium Low Total</p><p>Analysis <Provide a complete analysis of the test results to confirm that the test phase has met the exit criteria as listed in the Test Plan.></p><p>Integration System Test Report Template Page 3 of 7 <Project Name> - SDM Integration System Test Report Last Updated: <Insert Date> Regression Test Results</p><p>Results <Document the results of the Regression Test.></p><p>Enhancements Duplicates Exit Defects Found Approved SAT Results (On Hold) (Withdrawn) Criteria Critical High Medium Low Total</p><p>Analysis <Provide a complete analysis of the test results to confirm that the test phase has met the exit criteria as listed in the Test Plan.></p><p>Integration System Test Report Template Page 4 of 7 <Project Name> - SDM Integration System Test Report Last Updated: <Insert Date> Load Test Results</p><p>Results <An integrated load test combines scripts from the application to place a normal user load on the enterprise server infrastructure that simulates production conditions on the average day. The number of and types of users are estimated by the application teams and consistent with the expected sustained load of the system.></p><p>Number of Process and Objective User Behavior Users/Data Volume < List the process that the load test was <Enter the number of <Describe the function that performed on and indicate the objective of users simulated as using the simulated user/role was that test.> the application for this performing. For example, load test. For batch “cashier”, “data entry clerk”.> processes or when otherwise relevant, indicate the data volume for the test.></p><p>Ramp Up Time <Enter the number of simulated users per period of time to demonstrate the ramp up time.> Total Load Test Time <Enter the total amount of time the load test was performed.></p><p>Number of Users <Total the number of simulated users in the load test></p><p>Data Volume <Enter the Data Volume in the load test></p><p>Throttling <List the throttling speeds for the load test based on the network connection speed tested.></p><p>Integration System Test Report Template Page 5 of 7 <Project Name> - SDM Integration System Test Report Last Updated: <Insert Date> Analysis <Provide a complete analysis of the test results to confirm that the test phase has met the exit criteria as listed in the Test Plan.></p><p>CPU Usage <Discuss the CPU usage percentage for the load tests.></p><p>Processor Time <Discuss the percent of elapsed time that a process engages the CPU to perform work.></p><p>Memory Leak <Describe any instances of memory leaks and any list any potential problems and/or solutions to these.></p><p>Processor Queue <Discuss the queue lengths for processor usage.></p><p>Memory Usage <Discuss the memory usage percentage for the load tests.></p><p>Errors <Describe any errors that occurred in the load tests and how they were resolved for future reference.></p><p>Conclusion <Draw conclusions from the load test for the deployment of the application.></p><p>Integration System Test Report Template Page 6 of 7 <Project Name> - SDM Integration System Test Report Last Updated: <Insert Date> Acceptance Test Results</p><p>Results <Document the results of the Acceptance Test.></p><p>Enhancements Duplicates Exit Defects Found Approved SAT Results (On Hold) (Withdrawn) Criteria Critical High Medium Low Total</p><p>Analysis <Provide a complete analysis of the test results to confirm that the test phase has met the exit criteria as listed in the Test Plan.></p><p>Integration System Test Report Template Page 7 of 7</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us