Audit Checklist After Asbestos Removal

Audit Checklist After Asbestos Removal

<p> LAB REF:</p><p>SAMPLE TYPE: SITE INSPECTION ASBESTOS – BEFORE REMOVAL</p><p>CLIENT: CLIENT REF: COPY TO: E. Robson</p><p>UNIT: ASBESTOS DATE TAKEN: TAKEN BY: CEF NUMBER:</p><p>SITE NAME: TMS CODE:</p><p>SAMPLE POINT: PLAN DATE:</p><p>CBR NUMBER: TRAVEL/ON-SITE TIME:</p><p>Asbestos Contractor: ..…………………………………………………….. Tel: ……………………… Supervising Contractor: ………………………………………………... Tel: ……………………… Operatives on site:………………………………………………………………………………………. Estimation of Work Area Size: …………………………………………………………………………. Brief Description of Works: ……………………………………………………………………………. ……………………………………………………………………………………………………………</p><p>Site Checks Prior to Works:  /  Contractors Licence to Work on Site ? Medical Certificate for Contractors on Site ? Appropriate Equipment With Test Certification Present ? PPE Present with Appropriate Certification ? Method Statement Present and Unaltered ? Enclosure Present Showing Good Integrity ? Covering of Equipment Within Enclosure Satisfactory ? 3 – Stage Airlock Present ? Primary Decontamination Facilities Present ? Hazard Warning Signs Present ? Satisfactory Negative Pressure Unit ? Negative Pressure Visually Observed ? Flow Rate Measured Across Face of Negative Pressure Unit (m/s) Satisfactory Smoke Test ? Volume Flow Satisfactory (see over) ? Suitable Decontamination Unit (Connected, Warning Signs, Cleanliness, Position, Operational) ? Waste Disposal Facilities Present (Position, Lockable) ? Polythene Thickness Satisfactory (see over) ?</p><p>Additional Comments: ……………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………… ……………………………………………………</p><p>OVERALL ASSESSMENT No issues to resolve Acceptable Issues noted which have been resolved Improvement required Significant issues requiring formal action Substantial improvement required</p><p>Signature Print Name</p><p>Issue Date: July 2005 Authorised by: NW Form/issue no: 57/08 Page 1 of 2 PLAN OF ENCLOSURE AND SURROUNDING AREA:</p><p>Equipment Inventory Numbers: Polythene Thickness Measurements (Micrometer Units): Rotary Vane Anemometer: Micrometer: Tape Measure: Average Polythene Thickness (Micrometer Units):</p><p>CALCULATIONS: Area of Circle = πr2 </p><p>Volume Flow: Cross Sectional Estimated Volume Flow = Area of NPU Outlet X Mean Face Velocity (M 3/S) (M2) (M/S)</p><p>Estimation of Enclosure = Estimated Length X Estimated Width X Estimated Height Volume (M3) of Enclosure (M) of Enclosure (M) of Enclosure (M)</p><p>100M 3 Estimated Volume Estimated Volume Flow (M 3/S) X Estimation of Flow Per 100 M3 = Enclosure Volume 3 3 3 M /S / 100M (M )</p><p>Minimum Volume Flow = >0.1 M 3/S Per 100M3 (Area of a circle = r2)</p><p>Polythene Thickness:</p><p>Average thickness of polythene (m) = Micrometer units X 10 microns (m)</p><p>1000 gauge  250 microns (m)  25 micrometer divisions 500 gauge  125 microns (m)  12.5 micrometer divisions</p><p>Measurements recorded up to 10% below specified gauge can be accepted.</p><p>Issue Date: July 2005 Authorised by: NW Form/issue no: 57/08 Page 2 of 2</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us