<p> EMPLOYMENT RESUME</p><p>NEVILLE PASCOE</p><p>MARRIED - 2 CHILDREN</p><p>OUTLINE: -</p><p>Started Draughting in 1967 Has been with Western Mining since June 1981 on both contract and staff Project Section Leader on Mt Charlotte Crushing Plant Long Shaft CNGC Wash Plant Hill 50 Treatment Plant KNO CIP Plant KNO Foster Shaft KMA CIP Plant VJV Headframe VJV Treatment Plant St Ives Gold Plant Hill 50 Gold Plant Emu Gold Plant Nifty Copper Project</p><p>MicroStation CAD Section Leader & CAD Support since 1990</p><p>Developed Standard WMC Command Menus WMC Digitizer Menus WMC Standard Barmenu Side Bar Menus Cell Libraries User Commands MDL Applications Customized Systems WES CAD Guidelines & Procedures WMC CAD Engineering Standard ST43 WMC Best Practices & Guide Lines relating to the use of CAD</p><p>Training MicroStation 1 MicroStation 2 MicroStation 3d MicroStation 3d Advanced PDS Equipment Modeling Train the Trainer Paradox Database Basic Word 6 Basic Excel 5 Trouble Shooting & Supporting PC Systems Construction Simulation C Programming – Basic C Programming - Intermediate</p><p>Trained WES Staff and Contract Staff in MicroStation</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 1 of 10 PERSONAL PROFILE</p><p>Neville began his career in drafting in 1967 and since then has gained a broad range of experience across a number of industries. He is competent Designer in the following disciplines:- Layouts & Conceptual Design, P&ID’s & PEFS, Civil, Mechanical, Structural – Concrete & Steel, Piping, Tankage and has experience with Electrical Schematics & Instrument Loop Diagrams</p><p>Since 1981, he has worked for the Western Mining Corporation initially as Senior Design Draftsperson, progressing to CAD Support Officer for Projects and Engineering. During that period Neville was Project Lead Draftsperson for St Ives Gold Plant with a drafting team of 15 in all disciplines and Project Lead Draftsperson for Hill 50 Gold Mine, Checkers Plant with a drafting team of 12 in all disciplines.</p><p>As CAD Support Officer, Neville has customized the use of MicroStation to suit WMC Engineering Drafting and established CAD drafting standards in engineering for WMC. He has given MicroStation CAD training and support to Adelaide, Kalgoorlie Nickel Smelter, Kwinana Nickel Refinery, Kambalda, Leinster and Mt Keith personnel and when required provided support and direction to external consultants providing services to Projects and Engineering.</p><p>Neville is a competent user of Jacobus Technology’s Viewer and Construction Simulation Packages and has trained engineers and construction planners in its use.</p><p>Since leaving Western Mining Corporation he has established his own business providing CAD Support and draughting services. He has also become a user of AutoCAD R14 and can configure and customize AutoCAD menus and lisp and script files.</p><p>CAD SUPPORT</p><p>April ’97 Commenced trading as Nifty CAD Support Centre – Providing Consultant CAD Support Services Current Clients for CAD Support include: - Metplant Engineering Services WMC Kwinana Nickel Refinery WMC Kalgoorlie Nickel Smelter Lycopodium Pty Ltd GHD Engineering</p><p>Provide Support for following software: - MicroStation on DOS, Win95, WinNT 3.51 & NT4 AutoCAD R14 – menus, lisp, script files Microsoft Office 97 Applications</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 2 of 10 SEPTEMBER 98 -- PRESENT CLOUGH ENGINEERING GROUP</p><p>Mechanical Designer - CONTRACT – BSP Industries Pty Ltd</p><p>SMRC Waste Plant Prepare construction drawings for 350,000 tpa feed for waste recycling AutoCAD R14 plant. Structural, Mechanical, arrangements & details</p><p>Cape Lambert Jetty Upgrade Construction arrangements for erection jigs & welding platforms. AutoCAD R14 Crane lift arrangements & erection skid frames for conveyor installation </p><p>Cairn Energy – India Structural Arrangement & details for Compressor building pipe & service Frameworks racks, site drainage</p><p>Cairn Energy – India Structural Arrangement & details for offshore platform, heli-deck safety AutoCAD R14 nets & solar panels</p><p>SMRC Waste Plant Prepare tender proposal for 350,000 tpa feed for waste recycling plant. MicroStation 2D Structural, Mechanical, Piping, Earthworks & Roadworks drawings.</p><p>KNPC - New Oil Pier Prepare tender proposal drawings for 2.5km pier & berthing facilities with 48m bridge spans for pipe rack & road access.</p><p>KNPC Coke Calcining Plant Material handling layouts to existing Coke shipping facilities to upgarde to Coke Calcining, stacking & reclaiming to 80 000t storage building, infrastructure building layouts</p><p>Jimblebar Iron Ore Project Mechanical/Civil/Structural Layout drawings for new installation of AutoCAD R14 upgrade to crushing & screening plant </p><p>AUGUST 98 – SEPTEMBER 98 METPLANT ENGINEERING SERVICES PTY LTD</p><p>Mechanical Designer - CONTRACT – Direct</p><p>Bogoso Gold Project Mechanical/Civil/Structural/Piping design drawings for new carbon - MicroStation 2D safety screen to upgrade & replace existing carbon safety screen </p><p>MAY 98 – AUGUST 98 MINENCO –KAISER/BECHTEL JOINT VENTURE</p><p>Mechanical Designer - CONTRACT – BSP Industries Pty Ltd</p><p>Hindalco Alumina Complex Smelter plant layouts, Potline Building layouts, Paste Plant & Anode India Handling, Rodding Shop layout and Casthouse layouts plus Admin & - MicroStation 2D & 3D Services buildings and materials handling layouts</p><p>FEBRUARY 98 – APRIL 98 FLUOR DANIEL ENGINEERING</p><p>Structural Designer - CONTRACT – Tekton Resources</p><p>HI – Yandi Project Civil/Structural design drawings for YCV05/YCV06 conveyor transfer - MicroStation 2D</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 3 of 10 DECEMBER 97 – JANUARY 98 BHP ENGINEERING PORT HEDLAND</p><p>PDS Drafter - CONTRACT – Technical Resources</p><p>HBI – DRI Plant 3D snapshots with PDS Design Review to locate & label piping - PDS Design Review 3D sections in MicroStation to detail pipe supports for the Hot Briquette - MicroStation 3D Iron, Direct Reduced Iron Project</p><p>NOVEMBER 97 – DECEMBER 97 GHD ENGINEERING PTY LTD</p><p>CAD Training –CONTRACT -DIRECT</p><p>MicroStation 2D Provide Basic MicroStation Training to 10 Staff & Contract Personnel</p><p>APRIL 97 – DECEMBER 97 JR ENGINEERING PTY LTD</p><p>Senior Design Draughtsman –CONTRACT -DIRECT</p><p>Western Metals Zinc NL Pillara Project - MicroStation 2D Preliminary Plant Layout -AutoCAD R13 Plant Layout Concentrate Storage Building Feed & Tripper Conveyors</p><p>Gold Ridge Mining Plant Layouts - AutoCAD R13 Leach Tank Platform Heavy Mineral Separation Building Gold Room Layout</p><p>NOVEMBER 94 – APRIL 97 WESTERN MINING CORPORATION - PROJECTS AND ENGINEERING</p><p>MicroStation CAD Support MicroStation CAD Network Administrator PDS Equipment Modeling JSpace Viewer & Plant Space Modeler JSpace Construction Simulation & Statusing Beta Test & Evaluation of JSpace P&ID and ODBC Database Beta Test TeamMate & TeamMate95 with ODBC Beta Test & Evaluate MicroDocs Link with MicroStation and DocsOpen Developed WMC CAD Engineering Standard ST43 with consultation of WMC’s Major Engineering Operations Developed MicroStation Productivity tools, User Commands, Basic Macro’s, modified MDL Applications Developed Best Practices and Guide Lines for the Production of CAD Drawings Liased with WMC Engineering Consultants, Setup WMC Workspace Provided On Site Training to Consultants with the WMC Standards and WMC Barmenu QA & QC Checked Consultant produced MicroStation Design files conform to WMC ST43 Provided Visual Presentations to WMC’s Engineering Alliance Partners Responsible for transferring CAD files Between P&E, Consultants, & WMC Operations Provided Back Up support to PDS Administrator Member of the Drawing Office Management Team</p><p>JUNE 81 - NOVEMBER 94 WMC ENGINEERING SERVICES PTY. LIMITED</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 4 of 10 Senior Design Draughtsman - STAFF</p><p>Mt Keith Project - Plant Layouts - MicroStation - Grinding Circuit Layout - MicroStation 3d Model Flotation Layout - MicroStation 3d Model Overland Conveying - MicroStation 3d Model CAD Support for Project Engineering CAD Support – on site for “As Building”</p><p>Nifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks & Drainage</p><p>Kwinana Nickel Refinery - Larox Filter Installation - MicroStation 3D Model</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 5 of 10 Hill 50 Gold Plant - Preliminary Layouts and Design Installation of Roxon Jaw Crusher 12,000 T Live Stockpile and Reclaim Tunnel and Conveyors Grinding Circuit -Sag Mill & Ball Mill CIL Circuit Reagents Handling Tails Dams and Water Recovery Dams Slurry and Chemical Pump Installations Slurry, Chemical & Process Piping Power Station Installation - Earthworks & Foundations Fuel Storage & Transfer Piping Control Room Layout & Ancillaries</p><p>St Ives Gold Plant - Preliminary Layouts and Design Installation of 60" Gyratorary Crusher 12,000 T Live Stockpile and Reclaim Tunnel and Conveyors Grinding 'ABC' Circuit -Sag Mill, 2 Ball Mills and Crusher CIL Circuit Reagents Handling Tails Treatment and Water Recovery Belt Filters Tails Dams and Water Recovery Dams Slurry and Chemical Pump Installations Slurry, Chemical & Process Piping</p><p>Senior Design Draughtsman - CONTRACT - DIRECT</p><p>Emu Gold Plant - Gold Process Plant - Grinding Plant Supervise Refurbish of Secondhand Mill at Mitchell Cotts Engineering Install New Hydraulic Lube System Grinding & Screening Layouts & Details Slurry & Service Piping CIL Tanks Layouts & Details CIL Slurry & Service Piping Trash Screen Layouts Reagents Storage & Handling Power Station Layouts Fuel & Fire Suppression Piping</p><p>Vatukoula Joint Venture - CIL Tank Installation - Preliminary Layouts and Design Existing Plant Upgrade Earthworks & Drainage Foundations Structural & Mechanical Arrangement</p><p>Phillip Shaft - Headframe & Winder Layouts Headframe Design - Shaft Sinking & Production Surface Ore Handling</p><p>Kalgoorlie Mining Associates - - CIP Plant - Plant Layouts & Design Desorption Building Design Desorption Building Details Desorption Building Piping & Iso’s Process & Service Piping Reagents Handling Plant</p><p>Hill 50 Gold Mine - - Morning Star Shaft - New Crushing, Screening & Conveying Circuit Resume – Neville Pascoe Printed - 07-04-18 Page 6 of 10 Plant Layouts 'Sink-On' Winder Installation Winder Brake Upgrade - Conversion to Hydraulic</p><p>Olympic Dam Project - - Whenan Shaft - Headframe Modifications Surface Ore Handling - Proposal Copper Smelting Options - Plant Layouts Gold & Uranium Plant - Upgrade Plant Layouts</p><p>Kambalda Nickel Operations - - No 1 Crushing Plant - Preliminary Layouts & design New Conveyors & Mod's. to Existing Vibrating Feeder Installation</p><p>- CIP Plant - Piping Modifications - Pilot Plant Installation</p><p>- Foster Shaft - Headframe Arrangement - Design & Detail Surface Layout Surface Ore Handling Headframe Modifications - Fixed Guides to Rope Guides</p><p>MARCH 81 - JUNE 81 ALCOA OF AUSTRALIA - PINJARRA</p><p>Senior Design Draughtsman - CONTRACT - BSP</p><p>Workshop Layouts & Extensions Process Piping Lake Water Piping P & I D</p><p>FEB 79 - MARCH 81 WMC ENGINEERING SERVICES PTY. LIMITED</p><p>Senior Design Draughtsman - CONTRACT - DIRECT</p><p>Kambalda Nickel Operations - - CIP Plant - Plant Layout & Details Earthworks, Roadwork’s & Drainage Tank Area Foundations Derrick Screen Installation Support Structure, Platforms & Walkways Elution Building Piping & Iso’s</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 7 of 10 Hill 50 Gold Mine - Water Tank Hill - New Skip & Cage</p><p>-Morning Star Shaft - Winder Building Extension Refurbish Headframe</p><p>- Treatment Plant - Thickener Earthworks & Installation Browns Tanks & Circuit Tanks Filter Build & Tank Area Civils Crushing & Screening Plant Civils Process & Service Piping Refurbish Existing Conveyors Refurbish Existing Crushing & Screening Buildings</p><p>Central Norseman Gold Corporation - New Wash Plant - Plant Layout & Details Road Hopper, Apron Feeder, Jaw Crusher, Conveyors, Wash Trommel, Flotation Cells, Pumping & Piping - Fine Ore Bin Upgrade - New Super Structure & Conveyor Mod's. Gold Circuit Upgrade</p><p>Kalgoorlie Research Plant Plant Earthworks, Roads & Drainage Chemical Area Civils Pipe Supports, Platforms & Walkways</p><p>SEPT 78 - FEB 79 BSP INTERNAL DRAWING OFFICE</p><p>Senior Design Draughtsman - CONTRACT</p><p>Redbank Power Station Checking Detail & Workshop Drawings</p><p>FEB 77 - FEB 79 WMC ENGINEERING SERVICES PTY. LIMITED</p><p>Senior Design Draughtsman - CONTRACT -BSP</p><p>Kambalda Nickel Operations - Long Shaft - Headframe Modifications Skip Dumping Ore & Mullock Bin Supports Skip Changing</p><p>- Mt Charlotte - Crushing & Screening Plant Layouts Symons Crusher Installation & Civils Conveyors, Screens, Belt Feeders, Dust Collection, Service Piping</p><p>Kalgoorlie Nickel Smelter -Smelter Expansion - Structural Design & Details Service Piping Chain Conveyors Reagents & Cons Storage Bins</p><p>OCT 76 - FEB 77 BSP INTERNAL DRAWING OFFICE</p><p>Senior Design Draughtsman - CONTRACT Resume – Neville Pascoe Printed - 07-04-18 Page 8 of 10 Whiteman Brick Conveyor Design & Detail Drawings</p><p>JULY 76 - OCT 76 RON JOHNSON PTY LTD</p><p>Senior Detail Draughtsman - CONTRACT – DIRECT</p><p>Preparing Workshop Drawings for Industrial & Commercial Buildings and Government Buildings</p><p>MAR 74 - JULY 76 SELTRUST ENGINEERING AUSTRALIA PTY. LTD</p><p>Senior Design Draughtsman - CONTRACT - DIRECT</p><p>Agnew Mining Company Plant Layouts, Earthworks, Roads & Drainage Crushing Plant Installation (Crusher, Apron Feeder & Conveyors) Haulage Headframe & Winder Arrangement & Details</p><p>Spargoville Mining Underground Ore Haulage System Skips & Cages Surface Layouts</p><p>NOV 73 - MAR 74 PERTH DRAFTING COMPANY PTY LTD</p><p>Senior Detail Draughtsman - CONTRACT - DIRECT</p><p>Preparing Workshop Detail Drawings -CBH Grain Terminal Conveyors, Industrial & Commercial Buildings</p><p>SEPT 73 - NOV 73 MINENCO ENGINEERING PTY LTD</p><p>Senior Design Draughtsman - CONTRACT - BSP</p><p>Port Hedland Facilities Dust Collection Layouts New Conveying System</p><p>JAN 73 - SEPT 73 AUSTRALIAN SELECTION PTY. LTD - (SELTRUST AUSTRALIA)</p><p>Senior Design Draughtsman - CONTRACT - BSP</p><p>Agnew Mining Company - Nickel Process Plant - Plant Layouts Service Buildings Workshop Layouts</p><p>OCT 72 - JAN 73 MOBIL AUSTRALIA</p><p>Design Draughtsman - CONTRACT - BSP</p><p>Service Station Site Layouts & Details Country Fuel Depot Site Layout & Details Tank Farm Layouts Resume – Neville Pascoe Printed - 07-04-18 Page 9 of 10 Piping Installations, Modifications & Additions</p><p>SEPT 72 - OCT 72 JANDAKOT WOOL SCOURERS</p><p>Design Draughtsman - CONTRACT - BSP</p><p>Jandakot Wool Store Earthworks, Roads, Car Parks & Drainage</p><p>AUG 72 - SEPT 72 WESTERN MINERAL SANDS - CAPEL</p><p>Design Draughtsman - CONTRACT - BSP</p><p>Capel Treatment Plant Detail 20m Heavy Mineral Launder Tower</p><p>JULY 72 - AUG 72 J F THOMPSON</p><p>Design Draughtsman - CONTRACT - BSP</p><p>Modifications to Tank Detail Drawings Quantities Take-Off for Price Inquiry</p><p>MAY 71 JAN 72 The STRUCTURAL ENGINEERING COMPANY of WA PTY LTD</p><p>Detail Draughtsman - STAFF</p><p>Hamersley Iron Paraburdoo Construction Site Supervision of Installation of Secondary & Tertiary Crushers, Scalping & Fines Screens, Vibrating Feeders, Conveyors & Take Up and Transfer Towers</p><p>MAY 67 JAN 71 The STRUCTURAL ENGINEERING COMPANY of WA PTY LTD</p><p>Detail Draughtsman - STAFF</p><p>Preparing Workshop Detail Drawings of Commercial & Industrial Buildings, Portal Framed & Trussed Buildings, 100 ft Barge for Cape Lambert, Conveyors, Take Up & Transfer Towers for Hamersley Iron Paraburdoo, 3 months workshop training.</p><p>Resume – Neville Pascoe Printed - 07-04-18 Page 10 of 10</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages10 Page
-
File Size-