<p> Shauna Traxler</p><p>Senior Design II</p><p>Week 3 Demo – 1 Page Summary</p><p>December 16, 2011</p><p>Mini Tank Construction</p><p>What I said I would do:</p><p> Create a ~2’ x 2’ useable model</p><p> o Membrane</p><p> o Plywood</p><p> o Glue (wood)</p><p> o Angle iron</p><p> o Clean-up any failures</p><p> Week 1: all materials on hand</p><p> Week 2: tank built</p><p> Week 3: demo</p><p>What I got done:</p><p> Week 1:</p><p> o Acquire steel (cut to size by SMC)</p><p> o Buy plywood and cut to size</p><p> Week 2:</p><p> o Bottom frame welded</p><p> o Holes drilled with countersinks for fasteners in frame and uprights</p><p> o Acquire additional steel for top frame</p><p> o Begin prepping steel for top frame</p><p> Week 3: o Holes drilled with countersinks for fasteners in top frame</p><p> o Finished welding top frame</p><p> o Welded uprights to bottom frame</p><p> o Welded top rail to rest of structure</p><p> o Fitted plywood panels into structure</p><p> o Cut windows in side and bottom panels</p><p> o Used a router to create “ledge” for Lexan</p><p> o Fit liner into mini tank</p><p> o Water test</p><p> o Fit Lexan windows with liner in tank</p><p> o Silicone windows</p><p> Created a ~2’ x 2’ useable model</p><p> o 2” x 2” x ¼”/3/8” steel angle box</p><p> o Holes in angle to secure plywood and liner to steel frame</p><p> o 5 plywood panels to make up the wall structure, with “window” cut outs</p><p> o 6mm plastic liner as membrane</p><p> o (2) - ¼” Lexan windows</p><p> o Siliconed windows</p><p>What I learned:</p><p> Using machine shop equipment again</p><p> Grinding</p><p> Welding – what a correct weld looks line and what to do if it looks wrong</p><p> Don’t wear anything I don’t want to get dirty when working in the machine shop</p><p> Cut out steel where needed to create a flush surface</p><p> Grind corners that are to be welded at a 45° angle for weld</p><p> For top angles, ends should be cut to a 45° angle for a better weld (consult with other team members prior to cutting 45° angles)  A small block of steel will be drilled and tapped, welded onto the bottom of the tank, for the mounts</p><p> Wood panels will be not be modular, they will be 6’/8’ pieces</p><p> o The windows will be in separate panels</p><p> Use fasteners to attach wood to steel, instead of using “clips” at the top of the tank</p><p> Move full size tank using an equipment dolly, provided by machine shop</p><p>Plan for weeks 4-6:</p><p> Confirm the amount and lengths of steel needed</p><p> Place metal order with SMC – need it in by 1/2/12</p><p> Figure out how many sheets of plywood are needed</p><p> Take apart mini tank</p><p> Use steel and wood from mini tank for final design</p><p> Start constructing final tank 1/2/12-1/6/12</p><p> Tank needs to be complete at the end of week 5</p><p> o Motor, rails, cart, etc. need to be attached to tank during week 6</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us