Golden Plains Planning Scheme

Golden Plains Planning Scheme

<p> GOLDEN PLAINS PLANNING SCHEME</p><p>12/03/2009 C14 SCHEDULE TO THE FLOODWAY OVERLAY</p><p>Shown on the planning scheme map as FO.</p><p>1.0 Permit requirement 12/03/2009 C14 A permit is not required to construct or carry out the following:</p><p>Works</p><p>. Repairs and routine maintenance that do not affect the height, length or location of a levee, embankment or road. . Works associated with vine or horticultural trellises or watering systems. . Sports grounds with no grandstands or raised viewing areas, playgrounds, picnic shelters and barbeques.</p><p>. Open type rural fencing (This does not include solid fences, such as wooden or metal paling fences, solid walls, such as brick, stone, concrete or earthen walls, or cyclone type mesh fences).</p><p>. Cycle or pedestrian tracks where there is no increase in the natural ground level. A permit is required to construct or carry out the following:</p><p>Works</p><p>. Buildings and works associated with mineral exploration.</p><p>FLOODWAY OVERLAY – SCHEDULE 1 PAGE 1 OF 1</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us