Debris Recovery Plan

Debris Recovery Plan

<p> DEBRIS RECOVERY PLAN Pre-Demolition/ Pre-Construction</p><p>Project Address: City, Zip: Date: Contractor: Contact: Title: Phone: Email: Project Type: ____ SF Residential-New ____ SF Residential-Remodel ___ Commercial-New ___ Commercial-TI ___ Multifamily </p><p>Specify whether materials will be reused, recycled or disposed by completing the table below. You must recycle at least 50% of all waste generated. Check the designated box and provide the name of each facility or service provider to be used. If the materials are to be reused on site, describe under the facilities/service providers column. For example, wood waste chipped on site for mulch in plant beds. Salvaged materials from deconstruction should be designated as reuse. Material Reuse Recycle Dispose Facility/Service Provider to be used* Asphalt Brick Cardboard Carpet Concrete Dirt/Clean Fill Dry Wall Metal Pallets Plant Debris Plastics Roofing – asphalt composition shingle, tile, wood shake, tar or gravel Wood - clean Wood - treated Other Other DEBRIS RECOVERY STATEMENT – Post Demolition/Construction</p><p>Project Address: City, Zip: Date: Contractor: Contact: Title: Phone: Email: Project Type: ____ SF Residential-New ____ SF Residential-Remodel ___ Commercial-New ___ Commercial-TI ___ Multifamily </p><p>Identify which materials were reused, recycled or disposed by completing the table below. Check the designated box and provide the name of each facility or service provider and weight of materials. If the materials were reused on site, describe the reuse application under the facilities/service providers column. Salvaged materials from deconstruction should be designated as reuse. Attach copies of receipts, gate tags, or other verifying documentation. Material Reuse Recycle Dispose Facility/Service Provider Weight (tons) Asphalt Brick Cardboard Carpet Concrete Dirt/Clean Fill Dry Wall Metal Pallets Plastics Plant Debris Roofing - asphalt composition shingle, tile, wood shake, tar or gravel Wood - clean Wood - treated Other ______Other ______</p><p>MATERIAL GENERATION SYNOPSIS</p><p>A. Total tons of materials generated for the project: B. Total tons of materials disposed (not recycled): C. Total tons of materials salvaged, reused, or recycled: D. Percentage of materials recycled/reused (divide C by A): %</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us