3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #130

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #130

<p> 3GPP2 Access Network Interfaces Technical Specification Group A00-20110124-002r0 Seattle, WA January 24, 2011</p><p>3GPP2 TSG-A: Access Network Interfaces Meeting Summary #136 – Honolulu, Hawaii</p><p>DATE: December 6 - 10, 2010 LOCATION: Honolulu, Hawaii PRESIDING: Dr. Xiaowu (Frankle) Zhao, Chair</p><p>OPENING PLENARY</p><p>1. TSG-A Opening Remarks by TSG-A Chair The TSG-A Chair, Dr. Xiaowu (Frankle) Zhao, conducted the Access Network Interfaces TSG (TSG-A) plenary meeting sessions as follows (times are in local time):  Opening plenary 09:00 - 10:50, Monday, December 6, 2010.  interim plenary 16:00 - 16:15, Wednesday, December 8, 2010.  Closing plenary 15:30 - 15:50, Thursday, December 9, 2010.</p><p>2. Introduction and Attendance Registration Dr. Zhao conducted a roll call of member companies. 14 of 14 quorum members responded as present, for 100% quorum. Refer to the quorum list in section 12 for details. The electronic sign-in roster was recorded as follows.</p><p>Company Name E-mail Alcatel-Lucent Mike Dolan [email protected] Alcatel-Lucent Satish Kanugovi [email protected] China Telecom PeiRong Xie [email protected] Eileen McGrath Communications Eileen McGrath [email protected] Ericsson Ahmad Muhanna [email protected] Hitachi Ltd. Shiro Mazawa [email protected] Huawei Zhiming Li [email protected] KDDI Masaaki Obara [email protected] Motorola Scott Marin [email protected] Motorola India Naveen Arulselvan [email protected] NEC Tatsushi Yagi [email protected] Nokia Siemens Networks Victor Coello [email protected] Qualcomm Peerapol Tinnakornsrisuphap [email protected] Qualcomm Masa Shirota [email protected] Qualcomm David Ott dott@qualcomm Samsung Daegyun Kim [email protected] Sprint Nani Blake [email protected] Tatara Systems Phil Brown [email protected] Unicom Consulting Jake Wolski [email protected] Verizon Jingyi Zhou [email protected] ZTE Corporation Xiaowu Zhao [email protected] ZTE Corporation Yuanfang Yu [email protected] </p><p>3. Numbering of Contributions The following A00-20101206-xxx documents were numbered and assigned to the listed agenda items, as follows:</p><p>1 3GPP2 Access Network Interfaces Technical Specification Group A00-20110124-002r0 Seattle, WA January 24, 2011</p><p># xxx Title Source Item Plenary Action/Decision 001r1 Agenda Chair 4 R1 approved, R8 provided as FYI 002r0 Meeting Summary V Chair 5 Approved as Official Summary of Tampa Meeting 003r0 WIs 276-279 TSG-S 6 Remanded to WG1 004r0 Liaison Report for Oct/Tampa TSG-S 6 FYI 005r1 Liaison Report for Oct/Tampa TSG-C 6 FYI 006r0 Document Status Table for October TSG-S 6 Remanded to WG1, FYI 2010 007r0 Corr. to TR45.8 on S.R0117-A v1.0, TSG-S 6 FYI MMPS SRD 008r0 Corr. to the 3GPP2 SC on 3GPP2 TSG-S 6 FYI System Release 6 009r0 Corr. to TSG-C on WI 3GPP2- TSG-S 6 FYI 00263 Architectural Impacts 010r0 Corr. to TSGs on SC.P2006-002-0 TSG-S 6 Remanded to WG1 v0.27, SRG for Rel 6 011r0 Corr. to TSG-S on SRG WI and doc TSG-C 6 FYI association 012r0 Corr. to 3GPP2 PMT Coord. on TSG-C 6 FYI TSG-C review of work plan 013r0 Corr. to TSG-A on RAN support for TSG-C 6 Remanded to WG3 EVRC-NW, SO 73 014r0 Corr. to TSG-A on RAN support for TSG-X 6 Remanded to WG3 EVRC-NW, SO 73 015r0 Corr. to TSG-S on review TSG-X 6 FYI comments 016r0 Corr. to 3GPP2 on MEF 22.1 (2nd MEF 6 FYI, to be discussed at Chair’s meet- draft) ing with TSG-C re: air interface impacts 017r0 Corr. to BBF responding to BBF TSG-X 6 FYI email questions 018r0 Corr. to TSGs on ITU-T security TSG-S.4 6 Remanded WG2 & WG3 standard 019r1/A/B/C Corr. to TSGs on SC.P2006-002-0 TSG-S 6 Remanded to WG1 v0.27, SRG Rel 6 + text 020r0 Corr. to MEF on MEF 22.1 phase 2 VC/QC Approved for transmittal approved draft 2. 021r0 Corr. to 3GPP2 SC on TSG-S 6 FYI recommendations for SRG for Rel 6 022Br0 SO73 LS response to TSG-C & X TSG-A.3 6 Approved for transmittal 023r0 A.S0004-C v0.2 R&F text TSG-A.3 8C Approved for R&F, comments due Dec. 8 024r0 Corr. to ITU-T SG17 on TSG-X 6 FYI X.oacms, ... message spam 025r0 Corr. to 3GPP2 TSG-C & S on 3GPP 6 FYI Spurious Emissions Require. 026r0 ZTE TSG-A Chair nomination ZTE 8A Re-approved as Chair 027r0 Qualcomm TSG-A Vice Chair QC 8A Re-approved as Vice-Chair nomination 028 A.S0022-A v0.2 R&F Comments ALU 7A Remanded to R&F ad hoc group 029r0 PMT 6 Remanded to WG1 TSG-A Workplan Files Manager 030 ZTE 7A Remanded to R&F ad hoc group A.S0022-A v0.2 R&F Comments</p><p>2 3GPP2 Access Network Interfaces Technical Specification Group A00-20110124-002r0 Seattle, WA January 24, 2011</p><p># xxx Title Source Item Plenary Action/Decision 031 Qualcomm 7A Remanded to R&F ad hoc group A.S0022-A v0.2 R&F Comments 032r1 TSG-S 6 Remanded to WG1 Additional Work Items 033/A 3GPP2 6 FYI 3GPP2 Team Building Details Secretariat 034r3 3GPP2 10 FYI January Meeting Announcement TSG-A Secretariat 035 Incoming from ITU-T WP5A re: ITU-T WP 6 Carried Forward to January Liaison statement to External 5A organizations on “wide area sensor and/or actuator network (WASN) systems” & cover 036 Incoming from ITU-T WP5A re: ITU-T WP 6 Carried Forward to January Liaison statement to ITU-R 5D Working party 5D, ITU-T Study groups 12, 15 and 16, and External organizations on “QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR wireless access systems” 037r1 TSG-A email to TSG-S on 1x IOS WG2 8E R1 Approved for transmittal at Interim femto LS Plenary 038r1 Response to TSG-S WG4 WG3 8D R1 Approved for transmittal at Interim correspondence Plenary 039 A.S0022-A v0.3 E-UTRAN – TSG-A R&F 8B Approved for V&V, comments due eHRPD IOS VnV text January 24, 2011 Opening Plenary 040 A.S0004-C v0.3 TFO VnV text TSG-A R&F 8G Approved for V&V, comments due January 24, 2011 Opening Plenary 041 Outgoing Correspondence to TSG-S WG1 6 Approved for Transmittal on WIs, Stage 1 042 A.S0024-A v0.7 RnF.doc WG2 8F Approved for R&F, comments due January 24, 2011 Opening Plenary 043 Outgoing Correspondence to TSG-C WG3 6 Approved for Transmittal LS TCH SMS support for 1x- EUTRAN Interworking.doc 044 A.S0008-C v3.1 RnF.doc WG3 8H Approved for R&F, comments due January 24, 2011 Opening Plenary 045 A.S0009-C v3.1 RnF.doc WG3 8I Approved for R&F, comments due January 24, 2011 Opening Plenary 046 A.S0008+9-C v3.1 Annex F.doc WG3 8H, 8I Approved for R&F, comments due January 24, 2011 Opening Plenary</p><p>The following A00-20100913-xxx documents were carried forward from the September /Fukuoka, Japan meeting. 015 LS to 3GPP2 on MEF 22.1 MEF 6 Closed</p><p>4. Agenda Review & Approval  A00-20101206-001r1 was approved as modified, r8 was provided as FYI. </p><p>5. Meeting Summaries Review and Approval  A00-20101206-002r0: the TSG-A October Meeting Summary was approved as written. </p><p>3 3GPP2 Access Network Interfaces Technical Specification Group A00-20110124-002r0 Seattle, WA January 24, 2011</p><p>6. Correspondence and Liaisons The following correspondences and liaisons were discussed at the meeting:  A00-20100913-015  A00-20101206- contributions: 03, 04, 05, 06, 07, 08, 09, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24, 25, 29, 32, 33, 35, 36, 41, 43.</p><p>The following correspondence were approved for transmission:  A00-20101206-020Br0: TSG-A correspondence to MEF, re: MEF 22.1 response.  A00-20101206-022Br0: TSG-A correspondence to TSG-C & TSG-X, re: RAN support for EVRC-NW, SO 73 (0049H).  A00-20101206-041r0: TSG-A correspondence to TSG-S, re: WIs, Stage 1  A00-20101206-043r0: TSG-A correspondence to TSG-C, re: TCH SMS support for 1x-EUTRAN Inter- working. Refer to Section 3 for additional actions/decisions.</p><p>7. Unfinished Business 7a. A.S0022-A v1.0 R&F:  A00-20101206-028, 30, 31: R&F comments from ALU, ZTE and QUALCOMM, respectively, were remanded to R&F ad hoc for R&F processing. David Ott (QUALCOMM) was appointed ad hoc Chair.</p><p>8. New Business 8a. TSG-A Chair / Vice Chair election was presented, based upon the following contributions:  A00-20101206-026: Nomination for Dr. Xiaowu (Frankle) Zhao for TSG-A Chair, by ZTE was presented. Dr. Zhao was re-approved as Chair for TSG-A.  A00-20101206-027: Nomination for David Ott for TSG-A Vice-Chair, by QUALCOMM was presented. Mr. Ott was re-approved as Vice-Chair for TSG-A. 8b. A.S0022-A v1.0 V&V:  A00-20101206-039r0: A.S0022-A v0.3, E-UTRAN - eHRPD IOS: approved for V&V. Comments are due back to the January 24 TSG-A opening plenary. 8c. A.S0004-C v1.0 R&F:  A00-20101206-023r0: Approved for R&F comment collection this week. 8d. Feedback to TSG-S WG4 on ITU-T Security Framework (WG2 & WG3):  A00-20101206-038r1: TSG-A correspondence to TSG-S.4. re: ITU-T security std response, was approved for transmission. 8e. Decision on TSG-S WG4 re: generation of global RAND value and additional liaison to TSG- S WG4:  A00-20101206-037r1: TSG-A correspondence to TSG-S, re: 1x IOS femtocell security evaluation, was approved for transmission. 8f. A.S0024-A v0.7 R&F:  A00-20101206-042r0: A.S0024-A v0.7, Femtocell IOS: approved for R&F. Comments are due back to the January 24 TSG-A opening plenary. 8g. A.S0004-C v1.0 V&V:  A00-20101206-040r0:A.S0004-C v0.3, CDMA TFO: approved for V&V. Comments are due back to the January 24 TSG-A opening plenary. 8h. A.S0008-C v3.1 R&F:  A00-20101206-044r0 & 046r0: A.S0008-C v3.1, HRPD IOS (SC/MM in the AN) & Annex F: approved for R&F. Comments are due back to the January 24 TSG-A opening plenary. 8i. A.S0009-C v3.1 R&F:  A00-20101206-045r0 & 046r0: A.S0008-C v3.1, HRPD IOS (SC/MM in the PCF) & Annex F: approved for R&F. Comments are due back to the January 24 TSG-A opening plenary.</p><p>4 3GPP2 Access Network Interfaces Technical Specification Group A00-20110124-002r0 Seattle, WA January 24, 2011</p><p>9. Review Assignments  2 assignments: ITU-T contributions (1206-035 & 1206-036) under consideration.</p><p>10. Next Meeting Schedule:  A00-20101025-034r3: the January meeting announcement for Seattle was presented, FYI. </p><p>11. Open Discussion  None.</p><p>12. Adjournment The TSG-A Closing Plenary was adjourned at 15:50 local time on Thursday, December 9, 2010. At the closing of TSG-A meeting #136, the quorum list included 14 companies. They are listed as follows: Company Name Attended Fukuoka Attended Attended Honolulu Tampa 1 Alcatel-Lucent #134 #135 #136 2 China Telecom #134 #135 #136 3 Ericsson #134 #135 #136 4 Hitachi #134 #135 #136 5 Huawei Technologies #134 #135 #136 6 KDDI #134 #135 #136 7 Motorola #134 #135 #136 8 NEC #134 #135 #136 9 Nokia Siemens Networks #135 #136 10 Qualcomm #134 #135 #136 11 Sprint #135 #136 12 Tatara Systems #134 #135 #136 13 Verizon Wireless #134 #135 #136 14 ZTE Corporation #134 #135 #136</p><p>Note: Nokia Siemens Networks and Sprint were present during a quorum call for a second consecutive occurrence.</p><p>5</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us