
<p>ERCOT TECHNICAL ADVISORY COMMITTEE (TAC) MEETING ERCOT Met Center / 7620 Metro Center Drive, Austin, Texas 78744 September 7, 2012; 9:30 a.m. – 2:30 p.m. Call-in Number: 1.877.668.4493 Participant Code: 650 921 694</p><p>1. Antitrust Admonition K. Ögelman 9:30 a.m. 2. ERCOT Board Update K. Ögelman 9:35 a.m. 3. Approval of Draft TAC Meeting Minutes (Vote): K. Ögelman 9:40 a.m. June 20, 2012 June 28, 2012 July 9, 2012 4. Wholesale Market Subcommittee Report* J. Bevill 9:45 a.m. Confirmation of WMS Leadership (Vote) 2013 Competitive Constraints (Possible Vote) Protocol Section 4.4.10, Credit Requirement for DAM Bids and Offers, Annual Review (Vote) Release of Historical Number of CRR Transactions as Prescribed in Protocol Section 7.5.2, CRR Auction Offers and Bids (Vote) 5. Protocol Revision Subcommittee Report T. Burke 10:30 a.m. Nodal Protocol Revision Requests (NPRRs) (Vote): o NPRR425, Creation of a Wind Resource Group for GREDP and Base Point Deviation Evaluation o NPRR460, WGR Ramp Rate Limitations o NPRR464, SASM Procurement Reporting o NPRR466, Asset Depreciation Schedule for Capital Contributions o NPRR467, Balancing Account Resettlement due to DAM Resettlement o NPRR470, Real-Time PTP Option Modeling Language Cleanup - URGENT o NPRR472, Implementation Clarifications for Consideration of DC Tie Lines and Outages in CCTs - URGENT o NPRR477, Exception for Block Load Transfers at Presidio - URGENT</p><p> Revisions to Other Binding Documents List: Removal of Power System Planning Charter and Processes/Regional Planning Group (RPG) Processes and Procedures (Vote) 6. Revision Requests Previously Tabled at TAC: K. Ögelman 11:15 a.m. NOGRR086, Clarification of Seasonal Unit Capability Testing Requirements (Vote) NOGRR095, Type 2 Special Protection System Submissions (Vote) NOGRR099, SPS Procedure Changes for Consistency with NERC Reliability Standards – URGENT (Vote) 7. Reliability and Operations Subcommittee Report * B. Williams 11:25 a.m. NOGRR091, Criteria for the Selection of Operators (Vote)</p><p>9/7/12 TAC Public 1 NOGRR093, Synchronization with NPRR365 (Vote) NOGRR096, Clarification of RRS Obligation (Vote) NOGRR097, New Section 8I, Black Start Resource Availability Test Form (Vote) NOGRR098, Change of Facility Submission Time Lines to Align with Protocols (Vote) PGRR018, Clarify the Prerequisites for Adding a New Generation Resource to the Planning Models and Capacity Demand and Reserves Report (Vote) 8. Retail Market Subcommittee Report* R. Bevill 11:55 a.m. 9. Commercial Operations Subcommittee Report* H. Basaran 12:00 p.m. Lunch 12:05 p.m. 10. Market Enhancements Task Force Report* K. Ragsdale 12:30 p.m. 11. ERCOT Operations, Planning, and IT Report 12:45 p.m. Regional Planning Group (RPG) Charter Revisions (Possible J. Billo Vote) J. Billo STEC KEC-MEC Load Addition RPG Project (Possible Vote) J. Billo ERCOT Load Resources – Responsive Reserve Service K. Ragsdale/ Assessment W. Katzenstein Fast Responding Regulation Service (FRRS) Pilot Project (KEMA) (Possible Vote) 12. Other Business 2:15 p.m. Revised TAC Procedures (Vote) K. Hobbs Future Agenda Items K. Ögelman o Annual TAC and TAC Subcommittee Structure Review Adjourn 2:30 p.m. Future TAC Meetings October 4, 2012 November 1, 2012</p><p>Open Action Items from Previous Meeting(s) Responsible Party 8/5/10 – Creation of operational checklist for Resource interconnection. ROS 12/6/10 – Stabilization Action Items: o Review RUC Allocation Methodology & report back to March TAC WMS o Review Market Data Transparency SLA for possible improvements MIS UG (originally assigned to NATF) o Review RUC reporting (originally assigned to NATF) MIS UG 8/4/11 - NPRR340, Introduction and Definition of Duration-Limited TAC Resources (formerly “Unannounced HSL Test for Duration-Limited Resources”) – URGENT, tabled indefinitely to work through language. 11/3/11 - NPRR181, FIP Definition Revision, tabled. TAC 2/2/12 – With the recommended approval of NPRR432, Deployment of PRS Resources to Alleviate Anticipated Emergency Conditions, TAC directed PRS to consider capital contribution refund depreciation schedules. 2/21/12 - During ERCOT Board consideration of NPRR432, TAC was TAC requested to consider language related to repayment of capital contributions. 2/2/12 – Consider parameters for Load Resources that might be contracted to WMS alleviate anticipated Emergency Conditions pursuant to Protocol Section </p><p>9/7/12 TAC Public 2 6.5.1.1, ERCOT Control Area Authority (See NPRR432 discussion). 2/2/12 – Holistic review of Reliability Unit Commitment settlement in light WMS of recent Protocol changes. 4/5/12 – Review process and timelines to review/set CRR transaction limits in WMS future auctions (Related to changes made in NPRR449). 4/5/12 – Review impact to QSE related to individual ERS Resource WMS performance and consider need for data transparency of unit location (Related to changes made in NPRR451). 4/5/12 – Request ERCOT collect and provide data to ROS to analyze ERS ERCOT/ROS impact to system performance. (Related to changes made in NPRR451) 4/5/12 – Review price finalization and correction timelines, procedures and WMS Protocols in light of PUCT decision in Docket No. 39433 Longhorn Energy / West Oaks Energy Appeal and Complaint ERCOT's Decision to Conduct Market Resettlement. 6/7/12 – Discuss Market Participant training needs (what operational training ROS is provided and whether there is a need for a trainers working group to address any gaps). 6/28/12 - NOGRR099, SPS Procedure Changes for Consistency with TAC NERC Reliability Standards – URGENT, tabled. 6/28/12 – Provide by October TAC the following: METF o a recommendation on the scope of work and approach for a project to provide “Enhancements to the Real-Time Market” that . uses the framework of a multi-interval Real-Time Commitment and Real-Time Dispatch . takes into consideration information from the Brattle report and concepts in approved and in-flight NPRRs o a plan for a phased implementation of RTC and RTD features. 7/9/12 – Consider long-term solution for credit requirements in light of WMS revisions to System Wide Offer Cap. 6/28/12 - NOGRR095, Type 2 Special Protection System Submissions, tabled TAC/ROS and referred to ROS.</p><p>9/7/12 TAC Public 3</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-