<p> US DEPARTMENT OF TRANSPORTATION – FEDERAL HIGHWAY ADMINISTRATION Construction Inspection Checklist Section 606 Corrugated Metal Spillways</p><p>Tracs No.: District: Org: Contract Name: Contractor: Subcontractor: Inspection Date: Inspector: Inspector Office: Lot Boundaries: Sample No.: Completion Date: Pipe Size: Sample Location:</p><p>Conformance CHECKS (characteristics) Yes No N.A. Placing Corrugated Metal Spillways 1. Were spillway inlet assemblies installed as shown on the plans? (606.03)</p><p>2. Was spillway outlet pipe laid according to Section 602? (606.03)</p><p>3. Was the spillway anchored as shown on the plans? (606.03)</p><p>4. </p><p>5. </p><p>6. </p><p>Percent Conformance Yes (100) = (100) = % Conformance Calculations Yes + No</p><p>Comments:</p>