City of Dallas Water Utilities Department

City of Dallas Water Utilities Department

<p> Document Number: DWU-FRM-004-PALS.PTT Revision Number: 1</p><p>Approved By: Maurice Akech Effective Date: 08/24/10</p><p>Description of Last Initial Release Change:</p><p>Document Title: City of Dallas Annual Inspection CITY OF DALLAS WATER UTILITIES DEPARTMENT PRETREATMENT AND LABORATORY SERVICES INSPECTION REPORT</p><p>Inspection Type / Purpose: Unannounced Scheduled New Permitted Company Annual Inspection Violation Review Spill Investigation Follow – Up Other (specify) Date of Current Inspection: Date of Previous Inspection: Time of Current Inspection am pm Time of Previous Inspection: am pm Inspector’s Name: Signature: Date Report Complete: Company name: Code#: </p><p>Service address: </p><p>Mailing address:</p><p>Phone: Fax: MAPSCO: Permit number: Permit expires: Permit Signer: Title: Email: Cell Phone#: Contact’s Name: Title: Email: Cell Phone#: Alternative Contact: Title: </p><p>Type of industry: SIC#: </p><p>Categorical designation: </p><p>Number of employees: Days worked: M T W T F S S</p><p>Number of Days Number of employees per shift Hours worked: worked: </p><p>Account Information</p><p>Type Average Account No. Meter No./ New Meter Y/N/ New No. Meter Size Meter Location (W/S/I) Volume (gpd)</p><p>(W=water, S=sewer, I=surcharge) Recent avg total discharge gpd average total discharge Previous gpd average total discharge Recent avg Process gpd average PROCESS ONLY discharge discharge PALS INSPECTION REPORT Company Name Inspector’s Name Page 2 of 17 Month/Year</p><p>Previous gpd average PROCESS ONLY discharge Sewer lateral location:</p><p>Do lateral services have cleanouts?:</p><p>Sewer main Size: location:</p><p>Treatment Plant: Trunk line: PALS INSPECTION REPORT Company Name Inspector’s Name Page 3 of 17 Month/Year</p><p>Process Description</p><p>List products produced / manufactured: </p><p>General description of process: </p><p>Sources of Process Wastewater: </p><p>Sources of Dilution Wastewater: </p><p>Floor Drains in the Production Area: </p><p>Production rates and verification: </p><p>Additional Info: </p><p>Major changes noted during this inspection (Water Consumption/Discharge, Employee Number, Addition of Processes, Deletion of Processes: </p><p>Sources of Wastewater PALS INSPECTION REPORT Company Name Inspector’s Name Page 4 of 17 Month/Year</p><p>Process Flow Diagram</p><p>PALS INSPECTION REPORT Company Name Inspector’s Name Page 5 of 17 Month/Year</p><p>Process Tanks SITE A - Process Area CODE:SITE DESCRIPTION/CHEMICAL CODE CAPACITY OR METHOD OF FREQUENCY OF CODE B - PretreatmentCONTENT Area TYPE FLOW RATE DISPOSAL DISPOSAL C - Chemical Storage Area (Site Code must match the locator letter for specific areas on Facility Map) </p><p>CODE CD - Continuous discharge TYPE: BD - Batch discharge </p><p>METHOD OF DISPOSAL: PT - To pretreatment</p><p>OD - Off site disposal (transported)</p><p>ND - Not disposed or discharged</p><p>SS - To sanitary sewer</p><p>FREQUENCYOF X - More than once per day DISPOSAL: D - Daily W - Weekly M - Monthly S - Semi-annually (twice per year) A - Annually </p><p>PALS INSPECTION REPORT Company Name Inspector’s Name Page 6 of 17 Month/Year</p><p>Chemical Storage</p><p>SITE CODE DIKED? NO. OF LARGEST CONTAINER CHEMICAL OR MATERIAL HAZARDOUS CODE TYPE Y OR N UNITS STORED OR TOXIC?</p><p>SITE CODE: A - Process Area B - Pretreatment Area C - Chemical Storage Area</p><p>CODE IT - Inside tank farm OTC - Outside tank farm (covered) TYPE: ID - Inside drum storage OTU - Outside tank farm (uncovered) PA - Process area ODC - Outside drum storage (covered) O - Other (describe) ODU - Outside drum storage (uncovered)</p><p>Storage area condition: Satisfactory Unsatisfactory</p><p>Comments : PALS INSPECTION REPORT Company Name Inspector’s Name Page 7 of 17 Month/Year</p><p>Pretreatment Description Pretreatment Type: Neutralization Sludge Press Filtration Reverse Osmosis Metals Precipitation Settling / Clarifier Electrolytic De-plate Solvent Air Stripping Activated Carbon Waste Minimization Interceptor / Trap System Dissolved Air Floatation Evaporative Recovery Electrolytic Recovery Ion Exchange Off Site Disposal No Pretreatment Available Other: </p><p>Pretreatment Process: Continuous Flow Batch Treatment Other(specify) </p><p>General description of pretreatment process: </p><p>General description of pretreatment process: </p><p>Pretreatment Flow Diagram:</p><p>PALS INSPECTION REPORT Company Name Inspector’s Name Page 8 of 17 Month/Year</p><p>SLUG DISCHARGE CONTROL PLAN (SDCP) EVALUATION Description of Discharge Practices, including non-routine batch discharges A. Process Discharge Practices Process Average Maximum Type of Discharge Description Flow (GPD) Flow (GPD (batch, continuous, none)</p><p>B. If you have chemical storage containers bins or ponds in manufacturing area could an accidental spill lead to a discharge to: (Check all that apply).</p><p> onsite disposal system public sanitary sewer system (e.g., through a floor drain) storm drain to ground other; specify ______not applicable, no possible discharge to any of the above routes</p><p>C. Please describe the floor drains in your manufacturing and chemical storage areas. Where do they discharge? ______D. Description of stored Chemicals a. Description of security provisions dealing with chemical storage, treatment, and process control (i.e., overflow alarms on tanks):</p><p> b. Describe chemical storage containers, bins, or ponds, at your facility. Please give description of their location, contents, size, type, and frequency and method of cleaning. Also indicate in a diagram or comment on the proximity of these containers to a sewer or storm drain. Indicate if buried metal containers have cathode protection.</p><p>E. Procedures for Notification and adopted plans in case of a spill a. Notify Company Supervisor b. Notify Emergency Contact Person c. Notify Pretreatment & Laboratory Services Division (Dallas Water Utilities Department), 2626 Lombardy Ln, Suite 105, Dallas, TX 75220, Tel: 214-670-6749, Fax: 214-243-2645 d. Contain the spill as soon as possible e. If it has reached the sanitary sewer, i. Neutralize with chemicals, if possible ii. Contain as much as possible f. Estimate the size of spill and chemicals involved g. Notify PALS immediately but not to exceed 24 hours after becoming aware of the spill h. A written report sent to PALS within 5 days specifying: i. The description and cause of the upset (e.g., whether the slug load or accidental discharge) ii. Where, when (date and time), how much (volume), what concentration, For How Long iii. If noncompliant discharge is continuous, document the actions taken iv. Communication with agencies and affected parties v. Compliance plan to prevent slug, spill PALS INSPECTION REPORT Company Name Inspector’s Name Page 9 of 17 Month/Year</p><p>POLLUTION PREVENTION (P2)</p><p>1. Ask industry to present any pollution prevention measures. Any P2 success story that the industry would like to share with the public.</p><p>2. Inform Industry that awards will be presented during the annual Blue Thumb Award ceremony for pollution prevention initiatives.</p><p>3. Discuss your observation of routine inspection and maintenance of chemical/liquid storage tanks/areas.</p><p>BEST MANAGEMENT PRACTICES (BMP) Discussion</p><p>1. Ask industry to present any Best Management Practices they have implemented a. Waste minimization</p><p> b. Recycling</p><p> c. Water Conservation</p><p>PALS INSPECTION REPORT Company Name Inspector’s Name Page 10 of 17 Month/Year</p><p>Waste Management</p><p>Waste generation YES NO If yes, is waste: Hazardous Non-hazardous </p><p>USEPA/TCEQ Generators ID Number: </p><p>TRANSPORTER: Name: </p><p>Address: </p><p>Phone: ( ) - USEPA ID#: </p><p>DISPOSAL SITE: Name: </p><p>Address: </p><p>Phone: ( ) - USEPA ID#: </p><p>Observation of manifests for last quarter: (or attach copy of manifests) NO.OF TYPE OF DATE WASTE CLASS DESCRIPTION/SOURCE CONTAINERS CONTAINER</p><p>Hazardous Waste Classification Not Applicable Conditionally Exempt Small Quantity Generator (220 lbs or less) 100 kg or less/month Small Quantity Generator (220 lbs or greater) 100 kg or greater or <1000 kg/month Large Quantity Generator (2200 lbs or greater) 1000 kg/month or greater</p><p>Hazardous Waste Handling Does the company handle hazardous waste? Yes No If yes, does the company have: Written procedures for handling hazardous waste? Yes No Periodic training? Yes No Training type: Labeling? Yes No </p><p>SPILL CONTROL</p><p>Does the company need a Slug Control Plan? Yes No If yes, has the plan been submitted? Yes No If yes, Date: Approved? Yes No If yes, Date: </p><p>Toxic Organic Management Plan Does the company have an approved TOMP? Yes No Date approved: </p><p>Comments: PALS INSPECTION REPORT Company Name Inspector’s Name Page 11 of 17 Month/Year</p><p>Facility Layout PALS INSPECTION REPORT Company Name Inspector’s Name Page 12 of 17 Month/Year</p><p>Sample Site Layout Company: Date Code: Address Inspector: Mapsco: Total number of sample sites: Meters to be read (number & size): Meter Location: Sample site location: Type of sample site: Special Instructions: PALS INSPECTION REPORT Company Name Inspector’s Name Page 13 of 17 Month/Year</p><p>Surcharge Information Sheet</p><p>SAMPLE SITE NAME METER NO. % FLOW ACCOUNT NO.</p><p>How were the flow percentages calculated to each sample site? </p><p>Dedicated meter #: </p><p>Estimated by inspector, explain: </p><p>Estimated by company, explain: </p><p>Other: PALS INSPECTION REPORT Company Name Inspector’s Name Page 14 of 17 Month/Year</p><p>Combined Wastestream Formula (CWF) Information (Fill out one sheet for each sample site with combined wastestreams)</p><p>Is CWF Applicable Yes No If No, skip this page. Sample Site: Location: </p><p>Are wastestreams combined before or after treatment?: </p><p>Can a dedicated meter measure the incoming water to this sample site? Yes No</p><p>Inventory below all wastestreams that are represented by this sample site CODE DESCRIPTION Flow Rate (GPD) For NR Flows, Indicate Measurable TYPE Pollutants</p><p>Total flow represented by this sample GPD site:</p><p>CODE TYPE: R – Regulated process NR – non-regulated process D - Dilution flow (sanitary/domestic, boiler blowdown, non-contact cooling water)</p><p>Calculations for dilution contributions: Sanitary/Domestic: x 20 gpd GPD domestic = (# of Employees)</p><p>Boiler Blowdown: x = GPD blowdown (Volume of blowdown) (blowdowns per day) Other Dilution: </p><p>CWF calculated factor: *</p><p>Permitted factor used for Alternative limits: </p><p>Percent difference between calculated and permitted factor: % </p><p>*Total Flow – Dilution Flow Total Flow</p><p>Water usage from latest PCR: Non-contact cooling: Process wastewater: PALS INSPECTION REPORT Company Name Inspector’s Name Page 15 of 17 Month/Year</p><p>Total water used: PALS INSPECTION REPORT Company Name Inspector’s Name Page 16 of 17 Month/Year</p><p>Inspection Summary Is the industry currently in compliance (compliant for 3 consecutive months)? Yes No If no, explain. </p><p>Follow up inspection required for the following items: </p><p>Are the following items included with the Inspection report or located in industry file? Copies of: Holcomb Map REPORT FILE As built Map REPORT FILE Company Emergency Response Plan REPORT FILE Facility blueprints REPORT FILE Plumbing blueprints REPORT FILE Sewer service permit REPORT FILE Schematic of process area REPORT FILE Schematic of pretreatment area REPORT FILE Material Safety Data Sheets REPORT FILE Chemical Inventory REPORT FILE Waste manifests REPORT FILE Water usage records REPORT FILE Logs (operation, pretreatment, REPORT FILE waste disposal, etc.) REPORT FILE</p><p>Were the following areas inspected?</p><p>Process Area Filing Systems/Required Documents Pretreatment Area Chemical Storage Area Waste Storage Area Lateral Services Cleanouts, Manholes, etc. Meters Comments / Recommended Action: </p><p>Pollution Prevention Practices: </p><p>Pollution Prevention Recommendations: </p><p>Suggested sampling frequency and parameters to be sampled: PALS INSPECTION REPORT Company Name Inspector’s Name Page 17 of 17 Month/Year</p><p>SIU Classification Status and Self Monitoring Procedures</p><p>Does the industry fall under categorical or non-categorical user status?</p><p>Categorical Non-Categorical Not Applicable</p><p>IU Fact Sheet Updated Yes Date Updated </p><p>If categorical, list categories: </p><p>List any upcoming categories this industry may fall under? </p><p>What were the determining factors for company’s categorical designation? </p><p>If applicable: Base line report due date: N/A</p><p>90 day compliance report due date: N/A</p><p>Compliance schedule: Yes No Start date: Completion date: </p><p>Final compliance date: </p><p>Other comments/recommendations: </p><p>Does the industry conduct Self Monitoring? Yes No</p><p>Contract Laboratory: Name: </p><p>Address: </p><p>Phone: ( ) - </p><p>Does the industry have written Self Monitoring procedures? Yes No</p><p>Is Self monitoring in accordance with 40 CFR 136 and/or EPA approved methods? Yes No</p><p>If no, explain. </p><p>Other comments/recommendations: </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us