Maputo Municipal Development Program

Maputo Municipal Development Program

<p> PHASE II MAPUTO MUNICIPAL DEVELOPMENT PROGRAM</p><p>PROCUREMENT PLAN ADENDUM # 06</p><p>I. General</p><p>1. Project information:</p><p>Country: Mozambique, Project: Maputo Municipal Development Program (Phase II) Loan/Credit No.: Credit: IDA 48110 MOZ</p><p>2. Bank’s approval Date of the procurement Plan: December 15, 2016</p><p>3. Date of General Procurement Notice: December 2, 2010 4. Period covered by this procurement plan: November 2015 to June 2017</p><p>II. Goods and Works and non-consulting services.</p><p>1. Prior Review Threshold: </p><p>Procurement Method Prior Review Threshold Comments 1. ICB (Goods) >US 3,000,000 All NCB (Goods) < US 3,000,000 Post Shopping (Goods) < US 75,000 Post 2. Consultant Services Firms >US 1,000,000 All IC >US 200,000 All 3. ICB (Works) >US 15,000.000 All NCB (Works) <US 15,000.000 Post Shopping (Works) < US 100,000 Post 4. Direct Contracting (Goods, Works All Prior and No-Consultant’s Services</p><p>2. Prequalification. Not Applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Attached. 5. Any Other Special Procurement Arrangements: None.</p><p>1 6. Procurement Packages with Methods and Time Schedule </p><p>Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) IT Equipment for A-1131/G/01 IDA Shopping No No Post 30 Oct/14 Delivered DMSAS Goods and A-1151/G/01 Equipment for IDA Shopping No No Post 10 Feb/14 Delivered GDEI Logistic for the implementation of 09 A-1321/S/03 the training plan IDA Shopping No No Post Delivered June/15 2015 (lunch and refreshments) Furniture for A-1322/G/01 IDA Shopping No No Post 26 Feb/14 Delivered Training Center IT and Audiovisual A-1322/G/02 Equipments for IDA Shopping No No Post 26 Feb/14 Delivered Training Center Supply and Installation of 06 A-1322/G/03 IDA Shopping No No Post 26 Feb/14 units of A/C – 32 Delivered 000 BTUs Communications Services (Installation) – A-1441/S/03 Contract 1 IDA Shopping No No Post 17 Dec/13 Delivered (Recebedorias and 3 Technical Directorates) Communications Services A-1441/S/04 IDA Shopping No No Post 17 Dec/13 Delivered (Installation) – Contract 2 (14 sites) Networking 18 A-1441/S/05 Installation – Level IDA NCB No No Post Delivered March/14 1, 2 and 3 Networking Installation (optic fiber) for disaster A-1441/S/02a IDA DC No No Post 21 Oct/14 Delivered recovery system at Bank of Mozambique Furniture for Project A-1512/G/06 CMM NCB No No NA 31 Mar/14 Delivered 1,2,3,4 </p><p>2 Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) Furniture for A-1512/G/07 IDA NCB No No Post 31 Mar/14 Delivered Municipal Districts Purchasing of a A-1621/G/01 notebook and a IDA Shopping No No Post 24 Feb/14 Delivered desktop</p><p>Printing Documents for Implementation Waiting the A- approval of of HIV IDA Shopping No No Post 15 Nov/16 1641/OC/01 the Ministry Communication of Health Strategic </p><p>A- Printing of HIV / 20 IDA Shopping No No Post Delivered 1611/OC/01 AIDS Police Marc/14</p><p>Equipment and A-2121/G/01 CMM NCB No No NA 1 Abr/14 Delivered furniture</p><p>Truck - A- desconcentration IDA Shopping No No Prior 12 Dec/14 Delivered 2122/G/08 plan Services to Support A-2131/S/01 CMM NCB No No NA 13 Mar/14 Delivered OP A-2231/G/01 Audio Equipment CMM Shopping No No N.A. 18 Abr/14 Delivered A-2231/G/02 Purchasing Car CMM Shopping No No NA 31 Mar/14 Delivered Communications A-2231/S/02 Services 2014 and CMM NCB No No NA 20 Fev/15 Delivered 2015 Printing of communication A-2241/S/02 CMM NCB No No NA 20 Nov/14 Delivered materials – 2014 and 2015 A-2421/G/01 Purchasing Car CMM Shopping No No NA 20 Nov/14 Delivered A-2432/G/01 Purchasing Car CMM Shopping No No NA 20 Nov/14 Delivered Equipment’s for A-2122/G/10 Desconcentration IDA NCB No No Post 12 Dec/14 Delivered (new domains) 1 Vacuum Truck with Jetting A- Machine (Trailer), 2 IDA NCB No No Post 12 Dec/14 Delivered 2122/G/11a Ton Light Truck and 2 Light Vehicle (Pick up)</p><p>3 Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) A-2122/G/12 15 Re- Photocopier IDA Shoppin No No Post March /16 launched A- Uniforms and Shoppin 15 Re- IDA No No Post 2122/G/11d protective gear (set) March /16 launched A- Hand Tools for Shoppin 15 Re- 2122/G/11d masons March /16 launched IDA No No Post (Ferramentas e Sinais Rodoviarios)</p><p>15 A-2122/G/11 Cortador Asfalto IDA Shoppin No No Post March /16 Re- launched Computer equipment for IPRA B-1112/G/01 IDA Shopping No No Post 17 Feb/14 Delivered and TAE registration Equipments for e- B-1112/G/03 IDA Shopping No No Post 17 Feb/15 Delivered sistafe Concepcao, producao e divulgacao de spots B-1113/S/02 IDA NCB No No Post 28 Oct/14 Delivered de radio e televisao (TAE,IPA,IPRA e IAV) Computer Kit and printer for B-3111/G/01 IDA Shopping No No Post 6 Mar/14 Delivered Procurement / Municipal Districts Equipment for Implementation of the Ecological Direct 10 C-1222/G/01 CMM No No NA Delivered Zoning Plan and Contract Marc/14 Environmental Education Plan Software licenses C-1122/G/01 for SIGEM SSS No No Prior 24 Feb/14 Delivered (maintenance) IDA Printing of 26 C-1141/G/01 communication CMM NCB No No NA Delivered May/14 materials for PPU's Computer equipment for C-1141/G/02 IDA Shopping No No Post 17 Feb/14 Delivered PEUMM / AIs in Karl Marx</p><p>4 Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) Equipment for Tender in C-1142/G/06 SIGEM, DMSI, IDA NCB No No Post 01 Nov/16 evaluation DMI-DUC and DAS Printing Methodology Tender in C-1143/G/06 IDA Shopping No No Post 10 Nov/16 manuals for evaluation DMPUA Computer C-1142/G/03 equipment for IDA Shopping No No Post 19 Mar/14 Delivered DMPUA Equipment and office furniture for C-1142/G/04 IDA Shopping No No Post 17 Feb/14 Delivered PEUMM / AIs in Karl Marx Works Pilot G. C-1214/W/03 IDA NCB No No Post 23 Dec/14 Completed Dimitrov Works Pilot G. Dimitrov C- Direct (Addendum # 01) – IDA No No Post 22 July/15 Completed 1214/W/03-I Contract Additional works due to design issues Works Pilot G. C- Dimitrov Direct IDA No No Prior 15 Jan/16 Completed 1214/W/03-II (Addendum # 02) – Contract New buildings Works Pilot G. Dimitrov (Addendum # 03) – Direct 30 C-1214/W/03 IDA No No Prior Completed to add electricity, Contract May/16 furniture, window w net on the school Construction of Field Office / C- Contract Community Center IDA Shopping No No Post 19 Feb /14 1214/W/04a Completed for Pilot G. Dimitrov Construction of Field Office / C- Community Center IDA DC No No Post 19 Oct /15 Contract 1214/W/04-I Completed for Pilot G. Dimitrov</p><p>5 Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) Works for Contract C-1214/W/05 Chamanculo C IDA NCB No No Post 01 Oct/14 Signed- on (Amaral Matos Av) going Works for C- Chamanculo C Direct Waiting IDA No No Prior 15 Nov/16 1214/W/05-I (Amaral Matos Av) Contract NOB – Tindzau Drainage </p><p>Producao do Video Tender in C-1215/S/06 IDA SH No No Post 19 Oct/16 Obras G. Dimitrov Evaluation Removal of Power Cables on Direct 04 C-1214/S/05 IDA No No Prior Completed Chamanculo C Contract May/16 Works by EDM C- Equipment to Award Direct IDA No No Prior 11 Jan/14 Delivered 1215/G/01b DUATs Contract C- Equipment to Award CMM SSS No No NA 20 Oct/14 Delivered 1215/G/01b2 DUATs C- Customs Services IDA Shopping No No Post 13 Feb/14 Completed 1215/G/01c C- Goods to award 1215/G/01d DUATs (T-Shirts, IDA Shopping No No Post 17 Feb/14 Caps, etc) Delivered Acquisition of 2 Safes to secure C-1215/G/01f topographic IDA Shopping No No Post 27 Oct/14 Delivered equipment in DMPUA Office Implementation of the methodology for massive C-1221/S/01 CMM NCB No No NA 20 Fev/15 Delivered regularization (award of over 20,000 DUATs) Catering Services for the C-1222/G/03 CMM Shopping No No NA 25 Set/14 Regularization of Delivered DUAT Topographical C-1222/G/08 CMM NCB No No NA 26 Jun/14 landmarks Delivered Goods for DUAT C-1222/G/06 CMM NCB No No NA 19 Nov 13 printing Delivered</p><p>6 Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) C-1222/S/01a Services for DUAT CMM ICB No No NA 23 Mar 14 printing and delivery Delivered C-1222/S/01b Equipment for CMM NCB No No NA 23 Mar 14 DUAT printing Delivered C-1222/S/01c Filling Files for CMM Shopping No No NA 20 Nov 14 Delivered DUAT C-1222/S/01d Services to link the power generator to CMM Shopping No No NA 20 Nov 14 Delivered PMPUA Power Network Works for the 2nd Pending D1221/W/01 stage of Julius CMM ICB No No NA 21 Nov/14 BRT Project Nyerere Construction in pave of Rua do Zundape (Chamanculo D-1221/W/02 neighbourhood) - CMM NCB No No NA 20 Nov/14 Stage Rua Irmãos Ruby/ Av. Joaquim Chissano Works for the 1st D1221/W/03 stage of Julius IDA NCB No No Post 18 Feb/15 Completed Nyerere Works for the 1st stage of Julius 03 D1221/W/03 IDA DC No No Post Completed Nyerere – Drainage March/16 Ravina #3 Complementary Waiting Works for the 1st Finalization stage of Julius of D1221/W/03 Nyerere –Ravina #3, IDA DC No No Prior 13 Oct/16 Ressetlment Concrete on Taludes and and Road Contractor quotation sinalization Tender Rehabilitation of 10 Launched D1221/W/04 IDA NCB No No Post Mucoriano Market Nov/16 closing date 26 Jan 2017 Construction of 04 Tender 10 Launched D1222/W/06 Traffic Lights at JN IDA NCB No No Post Nov/16 closing date Avenue 24 Jan 2017</p><p>7 Review Expected Prequalific Domestic by Contract Procurement Bid- Ref. No. ation Preference Bank Comments (Description) Funding Method Opening (yes/no) (yes/no) (Prior / Date Post) Works contract (Rehabilitation of D-1231/W/01 GoM NCB No No NA 26 Jan/14 Completed City Main Paved Roads) Acquisition of Smart Phone for E-1111/G/01 IDA Shopping No No Post 13 Jan/15 Delivered Monitoring Services for GRSU Management SSS to E-1112/S/01 CMM Shopping No No NA 16 Sept/14 intellica Software DMSC signed Reparação da Direct 05 May, E-1112/S/02 Báscula / IDA No No Prior Terminated Contract Weighbridge Repair 2015 Reparação da 20 Aug, Contrcat E-1112/S/03 Báscula / IDA SH No No Post Signed Weighbridge Repair 2016 Obras Para Tender 30 Oct, Launched E-1112/S/06 Colocação de IDA SH No No Post 2016 closing date Lombas na Báscula 27 Jan 2017 Equipment to Capacity Development of 28 E-1112/G/02 IDA Shopping No No NA Delivered Planning and April/15 Monitoring Department Civic education 30 E-1121/S/01c CMM NCB No No NA campaign, - 2015 March/15 Portable equipment with cranes for the Contract E-2122/G/02 IDA Shopping No No Prior 1 Sept/14 maintenance of Signed traffic lights</p><p>8 III. Selection of Consultants</p><p>1. Prior Review Threshold: </p><p>Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) * >US 200,000 All contracts 2. Single Source (Firms) All contracts All contracts 3 Individuals >US 100,000 All contracts</p><p>* The first two contracts estimated to cost less than USD 200.000 will be prior reviewed</p><p>2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 200,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.</p><p>3. Any Other Special Selection Arrangements: None.</p><p>4. Consultancy Assignments with Selection Methods and Time Schedule</p><p>Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date Implementation of the A- Report Card IDA SSS Prior 15 Nov/13 Completed 1111/CS/02 (2013/2014) Improvement of the A- Methodology and IDA IC Post 20 Jan/15 Completed 1121/CS/02 Licensing Procedures for Construction Methodological Support A- for Preparation of IDA IC Post 20 Jan/14 Completed 1132/CS/01 Strategic Plans for Municipal Districts A- Advisor for Planning 1141/CS/02 IDA IC Prior 10 Feb/14 Completed and Monitoring - 2014 -IV A- Advisor for Planning 1141/CS/02 IDA IC Prior 12 Fev/15 Completed and Monitoring - 2015 -V A- Advisor for Planning Contract Addendum 1141/CS/02 and Monitoring – Jan – IDA IC Prior 10 Jan/16 Signed – on going -VI June 2016 A- Consulting Services to IDA IC Post 10 Sept/16 Completed 1141/CS/06 Draft ICR</p><p>9 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date A- Advisor for Planning Contract Signed – 1141/CS/02 and Monitoring – July – IDA IC Prior 10 June/16 on going -VII Dec 2016 A- Advisor for Planning 13 1141/CS/02 and Monitoring – Jan – IDA IC Prior New -IX June 2017 Dec/16 A- Facilitation Services of 1151/CS/01 Phase 2 (2013 and IDA IC Post 31 Oct/13 Completed c 2014) A- Facilitation Services of 1151/CS/01 Phase 2 (2015) - IDA SSS Prior 20 Dez/14 Completed d Addendum A- Director of GDEI 2015 1151/CS/03 CMM SSS NA 06 Feb/15 Completed (Addendum) -I A- Director of GDEI 2016 Contract Signed – 1151/CS/03 CMM SSS NA 06 Feb/16 (Addendum) on going -II A- Financial Manager – IDA IC Prior 14 Fev/16 Completed 1151/CS/04 2014 and 2015 A- Financial Manager – 1151/CS/04 March – June 2016 IDA IC Prior 14 Nov/13 Completed -I (Part Time) A- Procurement Officer – IDA IC Prior 14 Nov/13 Completed 1151/CS/05 2014 - 2015 A- Procurement Officer – 1151/CS/05 IDA IC Prior 12 Dec/15 Completed Jan – June 2016 -I A- Procurement Officer – Contract Signed – 1151/CS/05 IDA IC Prior 14 June/16 July – Dec 2016 on going -II A- Procurement Officer – 1151/CS/05 IDA IC Prior 13 Dec/16 New Jan – June 2017 -III Senior Procurement A- Specialist – Jan 2014 - IDA IC Prior 3 Jan/14 Completed 1151/CS/07 March 2015 A- Senior Procurement 1151/CS/07 Specialist – April 2015 - IDA SSS Prior 3 March/15 Completed - I December 2015</p><p>10 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date A- Senior Procurement 1151/CS/07 Specialist – 60 days IDA SSS Prior 10 Jan/16 Completed - II (Jan – June 2016) A- Senior Procurement 1151/CS/07 Specialist – 53 days IDA SSS Prior 20 June/16 On going - III (July – Dec 2016) A- Senior Procurement 1151/CS/07 Specialist – 53 days IDA SSS Prior 13 Dec/16 New - III (Jan – June 2017) A- Senior Advisor for 1222/CS/01 Institutional IDA IC Prior 10 Fev/14 Completed d Development A- Senior Advisor for 1222/CS/01 Institutional IDA SSS Prior 19 Jan/15 Completed e Development Further Development of A- the management IDA IC Post 17 Nov/14 Completed 1313/CS/03 database system HR Technical A- Consultant for Design Contract Signed – IDA IC Post 22 Sept/16 on going 1313/CS/04 of “Novo Qualificador do CMM” A- Information System IDA IC Post 30 Sept/14 1551/CS/01 Advisor Completed A- (Information System Line to be cancelled 1551/CS/01 Advisor - IS/IT IDA IC Post 20 Nov/16 - I Coordinator) Designer for Construction of a A- Completed medicines and medical IDA CQS Post 14 Dec/14 1611/CS/04 supplies warehouse Project Mid-term evaluation of A- the impact of the HIV / IDA IC Post 18 Feb/15 Completed 1631/CS/01 AIDS program Design of the action A- plan for the IDA IC Post 18 Feb/15 Completed 1641/CS/01 communication strategy for behaviour change Consolidation of the A- Neighbourhoods’ CMM IC N.A. 20 Feb/15 Completed 2141/CS/01 Consultation Councils</p><p>11 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date A- Consolidation of the 20 Feb/15 CMM IC N.A. Completed 2142/CS/01 Community Courts Audit Services for B- Financial Years 3 and 4 IDA LCS Prior 04 Fev/14 Completed 2322/CS/03 (2013 and 2014) Audit Service for B- Financial Year 5 (2015 - IDA LCS Prior 26 Jan/16 Contract Signed 2322/CS/04 2017) Technical Assistance for B- Improving the Financial IDA QCBS Post 29 Jan/14 Contract Signed 2411/CS/02 Management and Internal Control B- Local consulting for CMM IDA CQS Post 15 Nov /16 Line to be cancelled 3221/CS/01 real state assessment Contracts for 60 technical B- registration contracts for IDA SSS Prior 19 March/14 Completed 1112/OC/02 10 months - 2014 3 months extension of 60 IDA B- technical cadastre SSS Prior 12 Dec/14 Completed 1112/OC/02a contracts – Jan – March - 2015 9 months extension of 60 IDA B- technical cadastre SSS Prior 21 April/15 Completed 1112/OC/02b contracts- March – Dec 2015 3 months extension of 30 IDA B- technical cadastre SSS Prior 30 Sept/16 On going 1112/OC/02c contracts- Oct – Dec 2016 Consultor para B- Modernizar a Modalidade IDA IC Post 27 Oct/16 Line to be cancelled 2512/CS/06 de Pagamento IPRA Consultoria para a Implementacao do C- Plano de Zonamento CMM QCBS NA 20 Nov/14 Completed 1222/CS/01e Ecologico e do Plano de Educacao Ambiental C- Socio Economic Study CMM SSS NA 28 Feb/14 Completed 1222/CS/01f for Luis Cabral PPU C- Technical Assistance 1122/CS/03 for the Requalification IDA SSS Prior 04 Feb/14 Completed a of Chamanculo C</p><p>12 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date Consulting for the design and C- communication of the CMM QCBS NA 20 Jan/15 Completed 1112/CS/01 Slopes Maintenance Plan C- Consulting Services to Contract Signed – IDA QCBS Prior 09 Dec/13 1122/CS/01 Expand SIGEM on going Consulting Services to C- Expand SIGEM for Addendum Signed 1122/CS/01 IDA SSS Prior 10 Dec/14 DMF Tax Features – on going I (addendum I) Consulting Services to C- Expand SIGEM for Addendum Signed 1122/CS/01 IDA SSS Prior 02 April/15 DMF Tax Features – On going II (addendum II) Consulting Services to C- Expand SIGEM Addendum Signed 1122/CS/01 IDA SSS Prior 22 Dec/15 (addendum III) – Jan – – On going III June 2016 Consulting Services to Expand SIGEM – C- System delivery and Addendum Signed 1122/CS/01 IDA SSS Prior 30 June/16 Training to CMM Staff – On going IV (addendum IV) – June – Dec 2016 Consulting Services to C- Expand SIGEM 1122/CS/01 IDA SSS Prior 18 Dec/16 New (addendum V) – Jan – V March 2017 C- Consultancy service for Contract Signed – 1122/CS/02 IDA IC Prior 29 Dec/13 supervisor of SIGEM On going b Development of C- Additional SIGEM’s 1122/CS/03 IDA SSS Prior 1 Dec/13 Completed Module for printing b DUATs C- Team for the 1122/CS/01 enlargement of the IDA IC Post 10 Fev/14 Completed b Database of SIGEM Contract Extensions of C- the team for the 1122/CS/01 IDA IC Prior 27 March/14 Completed enlargement of the a Database of SIGEM </p><p>13 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date C- Detailed Plan of Mangal CMM DC NA 20 Oct/14 Completed 1132/CS/07 Costa del Sol Consultancy to Design C- Executive Project for 1212/CS/02 IDA SSS Prior 9 April/14 Completed the works under Basic a Project Consulting services to C- prepare the IDA IC Post 11 Jan/14 Completed 1212/CS/03 Resettlement Action Plan (PAR) C- Coordinator for 1213/CS/01 Integrated Actions – IDA SSS Prior 29 Dec/13 Completed c 2014 and 2015 C- Coordinator of Informal 1213/CS/01 IDA SSS Prior 10 May/14 Completed Settlements -#02 Urban Planning Advisor C- Oct – Dec 2015 (3 IDA SSS Prior 29 Dec/13 Completed 1213/CS/02 months) C- Urban Planning Advisor 1213/CS/02 –Jan – June 2016 IDA SSS Prior 20 Dec/15 Completed - I (addendum I) C- Urban Planning Advisor Addendum Signed 1213/CS/02 –July – Dec 2016 IDA SSS Prior 20 June/16 – On going - II (addendum II) C- Urban Planning Advisor 1213/CS/02 –Jan – June 2017 IDA SSS Prior 13 Dec/16 New - III (addendum III) Assistant Coordinator C- for Integrated Actions - IDA IC Prior 29 Dec/13 Completed 1213/CS/03 2014 C- Assistant Coordinator 1213/CS/03 for Integrated Actions - IDA IC Prior 20 Nov/14 Completed -I 2015 C- Assistant Coordinator 1213/CS/03 for Integrated Actions IDA IC Prior 22 Dec/15 Completed - II (Jan – June 2016) C- Assistant Coordinator Addendum Signed 1213/CS/03 for Integrated Actions IDA IC Prior 22 June/16 – On going - III (July – Dec 2016)</p><p>14 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date Implementation of C- Local development IDA SSS Prior 28 Jan/15 Completed 1214/CS/03 program for G. Dimitrov Implementation of Local development Contract Signed C- program for G. 1214/CS/03 IDA SSS Prior 09 Feb/15 – on going Dimitrov (Addendum I -I – change payment schedule) Implementation of C- Local development Contract Signed 1214/CS/03 program for G. IDA SSS Prior 20 March/15 – on going -II Dimitrov (Addendum II – additional time) Implementation of Local development Completed C- program for G. 1214/CS/03 IDA SSS Prior 10 Feb/16 Dimitrov (Addendum - III III – additional time, until June 2016) Implementation of Local development C- program for G. 1214/CS/03 Dimitrov (Addendum IDA SSS Prior 10 June/16 Addendum Signed - IV IV – social services on – On going markets, waste management education) Implementation of C- Local development 1214/CS/03 CMM SSS NA 28 Jan/15 Completed program for G. a Dimitrov C- Supervision Works for IDIDA IC Post 22 Oct/14 Completed 1214/CS/04 Pilot G. Dimitrov IDA A C- Supervision Works for 1214/CS/04 Pilot G. Dimitrov – 3 IDA IC Post 30 May/16 Completed - I months Addendum C- Supervision Works for 1214/CS/04 Pilot G. Dimitrov – 2.5 IDA IC Post 16 Sept/16 Completed - II months Addendum Supervision Works for C- Contract Signed and Paviment of Amaral IDA IC Prior 22 Oct/14 terminated due to 1214/CS/06 Matos and Drainage bad performance</p><p>15 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date C- Supervision Works for 1214/CS/06 Paviment of Amaral IDA SSS Prior 20 May/16 Completed – Adendum Matos and Drainage I Addendum to C- Supervision Works for 1214/CS/06 Paviment of Amaral IDA SSS Prior 20 Nov/16 On going Addendum Matos and Drainage II (Nov – Dec 16) C- Supervision Works for 1214/CS/06 Paviment of Amaral – IDA SSS Prior 13 Dec/16 New Matos and Drainage – Addendum Jan – April 2017 III Supervision Works for C- Rehabilitation of IDA SSS Prior 24 Oct/16 Waiting Proposal 1215/CS/06 Mucoreano Market (Nov – Dec 16) Consultancy Services to C- develop simplified IDA SSS NA 14 July/14 1214/CS/05 environment study for Completed Chamanculo C Works Extension of contracts C- of 2 Technical Project IDA SSS Prior 20 Oct/14 Completed 1214/CS/07 Team Chamanculo C C- Extension of contract of 1214/CS/07 Technical Project Team IDA SSS Prior 29 Dec/14 Completed -I Chamanculo C - 2015 Coordinator for C- Chamanculo C Projects Completed IDA SSS Prior 19 Nov/15 1214/CS/09 – 2 months – Nov – Dec 2015 Coordinator for C- Chamanculo C Projects On going 1214/CS/09 IDA SSS Prior 19 Dec/15 – 6 months – Jan – June -I 2016 Coordinator for C- Chamanculo C Projects On going 1214/CS/09 IDA SSS Prior 20 June/16 – 6 months – July – Dec -II 2016</p><p>16 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date Coordinator for C- Chamanculo C Projects New 1214/CS/09 IDA SSS Prior 13 Dec/16 – 3 months – Jan – -III March 2017 Civil Engineer for C- Technical Project Team Completed IDA IC Post 25 Feb /16 1214/CS/10 Chamanculo C – March – Sept 2016 C- Addendum I –Project 1214/CS/10 Assistant for Technical On going – Project Team IDA IC Post 15 Oct /16 Addendum Chamanculo C – Oct – I Dec 2016 C- Addendum I –Project 1214/CS/10 Assistant for Technical New – Project Team IDA IC Post 13 Dec /16 Addendum Chamanculo C – Jan– II March 2017 Extension of D- Supervision Services of Completed 1211/CS/01 IDA SSS Prior 20 Oct,14 Julius Nyerere Avenue c (Addendum # 03) Extension of D- Supervision Services of Completed 1211/CS/01 IDA SSS Prior 20 March,15 Julius Nyerere Avenue d (Addendum # 04) Extension of D- Supervision Services of Completed 1211/CS/01 Julius Nyerere Avenue IDA SSS Prior 20 Dec,15 - e (Addendum # 05) - 01 Jan – 30 June, 2016 Extension of Supervision Services of Waiting Proposal D- Julius Nyerere Avenue 1211/CS/01 (Addendum # 05) – IDA SSS Prior 20 Oct,16 - f Ravina 3, Concrete on Taludes and Roads Sinalization Consultoria para D- Verificacao e Avaliacao IDA IC Post 30 Sept/16 On going 1311/CS/06 de Taludes da Av. JN</p><p>17 Review Expected Description of Funding Selectio by Bank Proposals Ref. No. Assignment n (Prior / Submission Comments Method Post) Date Update of the D- Construction Posture IDA IC Post 28 Jan/15 Completed 1311/CS/03 and Regulation for building in Maputo City TA to assist DMS in E- monitoring and IDA SSS Prior 14 Oct/14 Completed 1112/CS/05 supervision of GRSU (2014) TA to assist DMS in E- monitoring and 1112/CS/05 IDA SSS Prior 30 Jan/15 Completed supervision of GRSU a (2015) TA to assist DMS in E- monitoring and 1112/CS/05 IDA SSS Prior 20 May/16 Contract Signed supervision of GRSU b (2016) E- Consultancy Services IDA SSS Prior 30 Oct/16 On going 1112/CS/06 for MOPA Evaluation E- Expansion of MOPA IDA SSS Prior 30 Aug/16 Contract Signed 1112/CS/07</p><p>IV. Training and Capacity Building</p><p>No. Expected outcome / Estimated Start Date Comments Activity Description Duration</p><p>A-1321/T/02 Training services (2011-2014) 2 years Mar/2014 Completed Training of focal points, activists and peer A-1621/T/01 educator for HIV / AIDS fighting – 2014 and 30 days Sept/2014 Completed 2015 Training in monitoring and evaluation of A-1631/T/01 April/2014 Completed HIV / AIDS programs 12 days Payment of procurement training courses (5 B-3121/T/01 84 days April/2014 Completed years) Training for the Communication of the C-1112/T/01 8 days Nov/2014 Completed Slopes Maintenance Plan</p><p>18 No. Expected outcome / Estimated Start Date Comments Activity Description Duration</p><p>Training in SIGEM (ArgGIS for server: (i) Site Configuration and Administration; (ii) Sharing GIS Content on the Web and 15 days Feb/2015 Completed (iii) Building Web Applications Using the ArcGIS® API for JavaScriptTM 8 months of tuition Fess for 10 Technicians 8 months for Master Degree in intervention C1211/OC/02 Feb/2014 Completed methodology in AIs at Architecture Faculty - UEM</p><p>19</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us