<p> NORTH WESTERN RAILWAY</p><p>CHIEF ENGINEERS OF CONSTRUCTION DEPARTMENT</p><p>S.No. Officer & Works assignments 1. Sh.Anil Kumar ,CE/C/I All works entrusted Construction with in territorial juridiction of JP Division. Work of Bhiwani bye-pass. Civil Engineering works of replacement of Signaling and Electronic equipments of Bhiwani & Satroad stations. RUB works at LC Nos.53B,54A&80 in RE-HSR Section. He will assisted by Dy.CE/C/I/II/III/IV/Survey /JP for above works. He will be assisted by Dy.CE/C/P&D in HQ office. Any other works entrusted by CAO(C). 2. Sh.A.K.Gupta, Chief Engineer /C/II All works entrusted to Construction between BEC JN (Ex.) to HMT (Excl.) of AII Division. Work of DNRP-RTM new line. He will will be assisted by Dy.CE/C/UDZ,DNRP,BSNW& RTM for above works. He will look after procumbent of P.Way material & fittings and MAS returns of Construction. He will be assested by Dy.CE/C/W in HQ office. Any other work/entrusted by CAO(C) 3. Sh. Jitendra Kumar, Chief Engineer /C/III All works entrusted to Construction in territorial jurisdiction of AII division and all Works in the section from KSG to PNU of AII Division including DFCCIL works. Works of new line of BNGM-RAS Work of Modernization of Ajmer Workshop. He will be assisted by Dy.CE/C/I&II/AII for above works. Any other work/s entrusted by CAO/C He will be in-charge of Establishment matters and will be assisted by SPO/C 4. Sh. Rajesh Kumar Mishra, Chief Engineer /C/IV All works in territorial jurisdiction of BKN & JU Divisions except works mentioned in para 1(b),(c) &(d) above. He will be assisted by Dy.CE/C/BKN& Dy.CE/C-I & II/JU for above works. He will be assisted by Dy.CE/C/D and HQ in HQ office. Any other work/s entrusted by CAO/C (i)Sanction of LHS& ROB works (ii)Compiling weekly review position of LHS & ROB for GM 5. Sh. Rajesh Arora, CE/C/HQ/JP He will be in-charge of wroks of DO-GGC new line. He will Assisted by for works of AWR-BKI Doubling. He will look after the RTI matters as PIO. He will be assisted by Dy.CE/C/TP in HQ office. Any other work/s entrusted by CAO/C Construction HQ Officers & staff</p><p>S.No. Officer & Works assignments</p><p>1 Secretary to CAO(C) Co-ordination for survey works in HQ. Training programme for officers and staff. Keeping updated Bio data of officers. Allotment of ORH (Const) Construction Library Surprise Inspection of various on going works Any other work assigned by CAO/C/JP 2 Dy Chief Engineer /C/P&D Assisted by A A.K.Sharma AEN/C/Planning (In charge of General & Budget Section) (a) General & Planning Section Shri S.K.Shrma,ChOS. (In charge of General & planning Section), Kishan Sen OS(T) & Ku.Pavitra clerk (i) PCDO /MCDO/ progress report (other then works contracts) of on going works of CAO© which are sent to GM/Railway Board/other official. (ii) ftp related matters,& reply of Parliament Questions & CA-III Reference.</p><p>(iii) Presentations of construction Deptt (iv) Compliance of Inspection Note/Safety drives (v) P&T telephone bills of CAO/C/ HQ office. (vi) Dealing Cash imp rest proposals of HQ officials & Field officials and upkeep of Cash Imp rest of CAO/C. (vii) Arrangement of Air tickets of officers (viii) Circulation of Policy circular including SOP other then works, store, track & establishment (ix) Misc. correspondence of General & other works assigned by Dy. CE/C/P&D (x) DPG-References and reply of other public demands MLA/MP letters. (xi) Look after the duties of AEN/C/IT in his absence. (b) Budget Section Sh. Bhoop Singh, Sr. SO A/Cs Budget statements for construction organization, Distribution of budget grants, budgetary reviews, arrangement of funds and all other related matters including re-appropriation etc. B R.S. Meena AEN/C/IT ( Incharge of IT & Dispatch Section) (i) Monthly updation of Information Directory & Public site of NWR by concern officers. (ii) Monthly checking up of IRPSM & update upto 5th of every month by concern officers. (iii) Updation of LARs of awarded tenders on ftp. (iv) Updation of new projects on STeCM. (v) Tender opening of CE/C-I , II & HQ jurisdiction. (vi) Look after the duties of AEN/C/Plg in his absence. (Vii) Other works assigned by Dy.CE/C/P&D. Dispatch Section Sh. Nand Kishore, Ch.OS (R&D) and Sh.Ram Kripal Meena, OS Receipt & dispatch work </p><p>(a) Design section (CE/C/I,IV) Alok Vyas SE/Drg Design of all the structures of CE/C/I &CE/C/IV (b) Drawing section (c) Binod Khugsal, SSE/Drg , Balbir Singh SSE/Drg & DD Yadav SE/C/Drg Finalization of design and drawings of all the civil Engg. Works, Yard plans and L-sections Technical inspection of ongoing projects including ROB /RUB.</p><p>D Shiv Charan Bairwa (Rajbhasa Officer ) Rajbhasa Section (a) Smt. Gambhir Rathod OS/I/Rajbhasa (b) Sh. Manu Kumar OS/II/Rajbhasa Rajbhasa work of Construction Organization.</p><p>3 Dy Chief Engineer /C/W Assisted by XEN/C/W (Sh. B.L.Meena), XEN/C/HQ (M.K.Goal) W-I. Sh. Perulal Meena Ch. OS/W/I & Smt.Alkoa Sachdewa OS/W/I,,Sh.Ashok Sen OS(T) under control of CE/C/III & IV.</p><p>W-II. Shri Roop Chand Meena Ch.OS/C/W & H.S. Nagpal OS/W,under control CE/C/I,II& HQ (a) Works Section (i) Works section policy matter including circulation policy circulars of construction (ii) Matters related to works tenders and contract including sale/opening of works tenders at JP HQ office. (iii) Progress report of works contracts (iv) Land acquisition matters (v) Arbitration matter pertains to construction (vi) Audit objections special letters , draft para, provisional para, audit para, DATN pertaining to construction (vii) Enlistment /registration of contractors.</p><p>(viii) Quartely Tender position ,Monthly CVC position, Weekly tender position, Draft paras of RTI 4 Dy Chief Engineer /C/HQ (a) ROB/RUB/LHS Cell Assisted by AEN/C/HQ/JP (D.N.Mishra) Assisted by Dhananjay Kumar JE/W & Ashok Sharma Cs.OS (i) Sanction of Detailed Estimate of ROBs (ii) Approval of design of ROBs being constructed by IRCON (iii) Compiling weekly review position ROB for GM (iv) DFCCIL works(ROB,LHS and other Civil & P.Way works) (b) Any other works/responsibility assigned by CAO/C</p><p>(b) Estimate section Sh. Praveen Agrawal SSE/C/D & Amit Kumar JE/C/Drg. Processing sanction of detailed estimate/material modification/revised estimates/completion reports/Project Report. Jaipur & Ajmer World class station project and Jaipur Metro Project. 5 Dy Chief Engineer /C/TP Assisted by XEN/TS/JP (A.K.Tiwari) (a) Track cell Sh. Ram Narayan OS, Smt.Bina Rudhani Typist , Sh.Dharmendra SSE/C/D and Sh. Shanti Lal SSE/C/P.Way) Track Policy matter Compilation & issue of instructions/circulars regarding track works Planning, procurement, distribution & auction of P.Way materials. Demurrage and warfage; Write off of P.Way material. Deployment of Track Machine. Stock Sheets /Audit /Drafts Paras pertaining to P Way material. Note: - Dy.CE/C/TP shall also do surprise inspection of store of field units. (b) Legal Cell Sh.Bhanwar Lal Meena, CLA , Sh.B.R.Jat CLA & Pritamsingh Meena, OS Court cases ,Payment of the advocates etc. 6 Dy Chief Engineer /C/Design Assisted by Sh.Rajendra Kumawat XEN/C/D (a) Design Section CE/C/II,III&HQ R.K.Sharma, SE/C/D, Binod Khugsal, SSE/Drg, D.D.Yadav, SE/C/D, Balvir Singh, SE/C/D . Finalization of design and drawings of all the civil Engg. Works including Yard plans and L- sections of CE/C/II&III/HQ/JP under Dy CE/C/D and CEC/I&IV under Dy CE/C/P&D CRS sanctions and CRS inspection notes of CE/C/II/III &HQ jurisdication & technical investigation of on going projects. Computer cell – Installation & Maintenance of work station capable of handling design, drawing & estimating. Maintenance of digitized records/ reference drawings/codes and manuals. (b) Store section Sh. Pyerlal Meena, OS & Km.Pinki Rani Clerk General up keep of office equipments Indent of stationery items of CAO/C office. Indent & Maintenance of Printer, Computer, Furniture, Xerox Machine and other Non-stock items. House keeping items of Store. Maintenance & DS-8 of T&P, Machine & Motor vehicle 7 Senior Personnel Officer /C (In charge of Establishment Section) (a) Establishment Section Sh. Ram Kripal Meena PI, Bhart Bhusan Verma OS, Sh. ,Rajendra Kumar OS, Ramchand OS. In charge of office establishment of CAO/C/ Office. CR of non Gazetted staff DAR Gazetted and non Gazetted Transfer and Promotion of Gazetted & Non Gazetted staff. Posting of class-III & IV staff Union items, House keeping items of Establishment Seminar, training etc. Pay sheet work Policy matter of Establishment Quarter dealing of Construction pool Misc. establishment correspondence. Attendance register will be closed at specified time by OS/I & put up to SPO/C.In absence of SPO/C it will be put up to Dy CE/C/P&D. (b) RTI CELL –SH.Ramotar Sharma TI & Sh.Ajay Sharma OS (T).</p><p>FIELD DY CHIEF ENGINEERS OF CONST DEPTT</p><p>(a) Chief Engineer /Construction /I/ UNIT</p><p>S.No. Officer & Works assignments 1 Dy Chief Engineer/C/II/JP Phulera – Broad gauge diesel locomotive shed Jaipur – Yard Remodeling& GC work RUB at Military Area and Ajmer Puliya (Deposit Work) ROB/RUB at JP area (LCno.232 & 234) Résidual Works of Jaipur-Phulera and Jaipur-Dausa Doublings. Shifting of station building at Kishangarh in connection with DFCCIL Work. 2 Dy Chief Engineer /C/III/JP Harsauli-Rewari (39.35 km) doubling Residual works of Alwar-Harsauli (34.86Km) doubling Rewari-Jhaijar ROB in lieu of LC No. 57-B Alwar-ROB in lieu of LC No.117-C (Deposit Work ) Residual Works of Agra fort-Bandikui GC ROB in lieu of LC -61 (Anajmandi) Survey of AWR- Charkhi- Dadri new line Survey of RE bye Pass Jaipur-Setting up of NWR-Zone: Head Quarter office building residual works. Jaipur-Setting up of NWR-Zone: Officers & staff Quarter at Jagatpura. Vehicle hiring for HQ officers & Field officers at Jaipur Head quarters. Shifting of Kisangarhgarh station at new location in connection with DFCCIL. Shifting of Utility on DFC alignment in Jaipur Division. ROB /RUB at JP area (LC. No. 232 &234) Alwar-Bandikui boubling work. 3. Dy Chief Engineer /C/I/JP Sīkar (incl.) – Churu (incl.) & Sikar (incl.) –Loharu (incl.) Gauge Conversion (212.61 Km) part of Jaipur-Ringus-Churu & Sikar-Loharu GC (320.04 km) Project. 4. Dy Chief Engineer /C/IV/JP (b) Chief Engineer /Construction /II/ UNIT</p><p>1. Dy Chief Engineer /C-I/UDZ Udaipur-Himmatnagar Gauge Conversion Residual works of Mavli-Nathdwara GC. Nathdwara new line. 2. Dy Chief Engineer /C-II/UDZ Mavli Jn-BadiSadari GC work 3. Dy Chief Engineer /C/DNRP Dungarpur-Ratlam via Banswara New BG line from Km.00 to Km.88.00 Km. 4. Dy Chief Engineer /C/Banswara, Dungarpur-Ratlam via Banswara New BG line from Km.88.00 to 176.47 . 5. Dy Chief Engineer /C/RTM Vacant</p><p>(c) Chief Engineer /Construction /III/ UNIT</p><p>1 Dy Chief Engineer /C/I/AII (i) Ajmer -Pushkar Line (31.40 Km) (ii) Bangurgram-Ras New line (27.8 Km) (iii) Ajmer -Bangurgram Doubling (48.43 Km) (iv) Bangurgram –Guriya Doubling (47 Km) (v) Ajmer –Modernization of carriage works shop (vi) Ajmer –Modernization of loco works shop (vii) Madar-Shifting of coach maintenance facilities from Ajmer (viii) Shifting of utilities in connection with DFC work between Ajmer –Guriya (ix) LHS works between Ajmer –Guriya & (x) Other minor work of Ajmer Division (xi) Ajmer-Kota new line (xii) Puskar-Metra new line. (xiii) Setting up greenfield MCMU at Bhilwara. 2 Dy Chief Engineer /C/II/AII (i) Keshvganj –Swaroopganj –doubling (26.48 Km), , (ii) Guriya –Marwar (43.50 Km.)doubling (iii) Marwar-Rani (54.5 Km) doubling (iv) Shifting of utilities in connection with DFC work bet.Guriya –Palanpur section (v) LHS works bet.Guriya-Palanpur sect ,. (vi) ROB in lieu of LC No.81 at Phalna (d) Chief Engineer /Construction /IV/ UNIT</p><p>1. Dy Chief Engineer /C/BKN (i) Ratangarh-Sardarshahar GC (47.54 Km) (ii) Residual worksof Bikaner- Ratangarh-Sadulpur GC & Kolayat-Phalodi new BG line (iii) Bikaner X-ing stations (02 nos.) (iv) BKN yard remodeling (v) ROB at LC 138 (vi) Deposit work Sudharna &Jharli (vii) Rewari-Hissar Std.III (viii) RE-HSR ROB at LC 19-C 2. Dy Chief Engineer /C-I/JU (i) JU-Yard remodeling (ii) RUB in lieu of LC No.C-325 (iii) ROB in lieu of LC no.21,61 & 293 (iv) Bhagat ki kothi Diesel shed works, (v) Marrana –Bidiyad track track diversion (vi) Other minor works of JU Div 3. Dy Chief Engineer /C-II/JU (vii) Thaiyat-Hari-Sanu new line.</p><p>(e)Chief Engineer /Construction /HQ/ UNIT</p><p>1. Dy Chief Engineer /C/DO (a)(i) LHS works: He will coordinate the following works in HQ (ii) Site Survey (iii) Sanction of details (iv) Approval of GAD (v) Consent for closure of LC from Stat Gov. (vi) Tendering and planning of execution at HQ level (vii) Co-ordination with operating and S&T Departments regarding traffic blocks (viii) Compiling weekly review position for GM (b) He will lookafter the work of DO-GGC New line (c) Any other works/responsibility assigned by CAO/C Sh.Pawan Kumar Bansal,AEN/C/HQ/JP &Sh.Ramnath JE/W/JP</p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-